Design-build (DB) contracts transfer the responsibility for design quality control to the design-builder. Hence, the owner’s role becomes one of quality oversight and its involvement in the technical review of design deliverables becomes very different than in a traditional design-bid-build (DBB) design contract. The speed with which DB projects are delivered puts design approval on the critical path, creating a need to expedite design quality control activities to achieve release for construction (RFC) documents. It also creates a situation where owner-generated comments can result in delay claims. This paper reports the use of design quality audits as a claim avoidance tool and presents a framework for implementing design quality audits. A case study illustrating the implementation of the framework on a large DB wastewater project is presented. The paper’s contribution is showing that the design quality audit allows the owner to perform its due diligence responsibility to monitor DB project quality in a manner that does not usurp the design-builder’s responsibility to produce quality construction documents and avoid becoming the sources of project delay claims. It also finds that design quality issues must be given visibility to facilitate the timely response to and correction of contract noncompliance.

Practical Applications

A well-crafted design quality audit program furnishes the DB project owner with a means to satisfy its quality oversight responsibility without disputing the design-builder’s design progress and become embroiled in a contentious and time consuming comment resolution process. To realize the benefit, the audit program framework must be in place before advertising the DB project. The project’s solicitation documents can then refer to the audits and competing design-builders can price and schedule recurring audits in their proposals. After award, the subsequent development of the design-builder’s QMP must address the process for facilitating the owner’s quality audits as a contract requirement. A pragmatic consideration is ensuring that the design-builder’s designer-of-record (DOR) promulgates the contractual audit process down to its design subconsultants and the general contractor include the audit process as part of its construction engineering consultants for the design of temporary works. The key component is to describe the contractual requirements for design quality audits before design-builders respond to the request for qualifications (RFQ) and request for proposals (RFP), giving the design quality audit the same prominence as the other contract administrative requirements that the design-builder must satisfy to be paid.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

No data, models, or code were generated or used during the study.

References

List of Cases

Appeal of ADT Construction Group, Inc. ASBCA No. 55307, 2009-2 B.C.A. ¶ 34200, 2009.
Appeal of Ellis Environmental Group, LC. ASBCA No. 55375, 2008-2 B.C.A.¶ 33,918, 2008.
Appeal of Lovering-Johnson, Inc. (LJI), ASBCA No. 53902, 2005-2 B.C.A. ¶ 33126, 2005.
K-Con Building Systems Inc. v. United States, 100 Fed. Cl. 8 (2011).
Reliable Contracting Group, LLC v. US Department of Veterans Affairs CBCA 1539, 2011-2 B.C.A. ¶ 34,882, 2011.

Works Cited

Austroads. 2018. Guide to project delivery part 5: Road construction quality assurance. Sydney, Australia: Austroads.
Barry, W., and F. Leite. 2014. “Late deliverables to construction: How understanding the impacts can benefit dispute prevention and resolution.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 7 (2): 04514004. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000153.
Barutha, P., H. D. Jeong, D. D. Gransberg, and A. Touran. 2021. “Impact of collaboration and integration on performance of industrial projects.” J. Manage. Eng. 37 (4): 211–219. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000921.
Bröchner, J., P. E. Josephson, and A. Kadefors. 2002. “Swedish construction culture, management and collaborative quality practice.” Build. Res. Inf. 30 (6): 392–400. https://doi.org/10.1080/09613210210159866.
Brown, J. T. 2002. “Controlling costs using design quality workshops.” In AACE international transactions, CSC101. Washington, DC: AACEI.
Caltrans (California Department of Transportation). 2012. Design-build demonstration program quality manual outline. Sacramento, CA: Caltrans.
Carr, P. G., and P. S. Beyor. 2005. “Design fees, the state of the profession, and a time for corrective action.” J. Manage. Eng. 21 (3): 110–117. https://doi.org/10.1061/(ASCE)0742-597X(2005)21:3(110).
Castro-Nova, I., G. M. Gad, A. Touran, B. Cetin, and D. D. Gransberg. 2018. “Evaluating the influence of differing geotechnical risk perceptions on design-build highway projects.” ASCE-ASME J. Risk Uncertainty Eng. Syst. Part A: Civ. Eng. 4 (4): 04018038. https://doi.org/10.1061/AJRUA6.0000993.
Chong, H. Y., R. M. Zin, and S. C. Chong. 2012. “Employing data warehousing for contract administration: E-dispute resolution prototype.” J. Constr. Eng. Manage. 139 (6): 611–619. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000642.
CII (Construction Industry Institute). 1991. In search of partnering excellence. Austin, TX: CII.
DBIA (Design-Build Institute of America). 2023. Design-build done right. Washington, DC: DBIA.
del Puerto, C. L., D. D. Gransberg, and M. C. Loulakis. 2016. “Contractual approaches to address geotechnical uncertainty in design-build public transportation projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 9 (1): 04516010. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000202.
Eriksson, P. E. 2010. “Partnering: What is it, when should it be used, and how it should be implemented?” Construct. Manage. Econ. 28 (9): 905–917. https://doi.org/10.1080/01446190903536422.
Ernzen, J., G. Murdough, and D. Drecksel. 2000. “Partnering on a design-build project: Making the three-way love affair work.” Transp. Res. Rec. 1712 (1): 202–211. https://doi.org/10.3141/1712-24.
Franz, B., R. Leicht, K. Molenaar, and J. Messner. 2016. “Impact of integration and group cohesion on project delivery performance.” J. Constr. Eng. Manage. 143 (1): 04016088. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001219.
Gad, G. M., M. C. Loulakis, and D. D. Gransberg. 2019. “Confidentiality issues with alternative technical concepts during design-build project procurement.” J. Manage. Eng. 20 (4): 12. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000345.
Gauer, C. 2006. “Design and construction of Southeast Anthony Henday Drive, Edmonton, 4.” Transportation Association of Canada. Accessed March 26, 2023. http://conf.tac-atc.ca/english/resourcecentre/readingroom/conference/conf2006/docs/s015/gauer.pdf.
Gransberg, D. D., W. D. Dillon, H. L. Reynolds, and J. Boyd. 1999. “Quantitative analysis of partnered project performance.” J. Constr. Eng. Manage. 125 (3): 161–166. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(161).
Gransberg, D. D., C. Lopez del Puerto, and D. Humphrey. 2007. “Relating cost growth from the initial estimate versus design fee for transportation projects.” J. Constr. Eng. Manage. 133 (6): 404–408. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:6(404).
Gransberg, D. D., M. C. Loulakis, and G. M. Gad. 2022. The engineer’s project delivery method primer: Uniform definitions and case studies, 28–42. Reston, VA: ASCE.
Gransberg, D. D., and K. R. Molenaar. 2004. “Analysis of owner’s design and construction quality management approaches in design-build projects.” J. Manage. Eng. 20 (4): 162–169. https://doi.org/10.1061/(ASCE)0742-597X(2004)20:4(162).
Gransberg, D. D., and E. Scheepbouwer. 2010. “Infrastructure asset life cycle cost analysis issues.” In 2010 transactions. Atlanta: AACE, Int‘l.
Gransberg, D. D., J. S. Shane, and C. Lopez del Puerto. 2012. “Project complexity mapping in five dimensions for complex transport projects.” J. Manage. Eng. 29 (4): 316–326. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000163.
Hasanzadeh, S., B. Esmaili, G. M. Gad, and D. D. Gransberg. 2018. “Impact of owners’ early decisions on project performance and dispute occurrence in public highway projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (2): 04518004. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000251.
Kraft, E., and K. R. Molenaar. 2014. “Quality assurance organization selection factors for highway design and construction projects.” J. Manage. Eng. 31 (5): 04014069. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000289.
Labi, S., and F. Moavenzadeh. 2007. Project quality reviews and audits. Lecture 17, 1.040/1.401/ESD.018, Project Management. Boston: Massachusetts Institute of Technology.
Lahdenperä, P. 2012. “Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery.” Construct. Manage. Econ. 30 (1): 57–79. https://doi.org/10.1080/01446193.2011.648947.
Liu, J. Y., Q. Xie, B. Xia, and A. Bridge. 2017. “Impact of design risk on the performance of design-build projects.” J. Constr. Eng. Manage. 143 (6): 04017010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001299.
Loulakis, M. C., N. C. Smith, D. L. Brady, R. E. Rayl, and D. D. Gransberg. 2015. Liability of design-builders for design, construction, and acquisition claims. Washington, DC: National Cooperative Highway Research Program.
McSkimming, J., B. Peck, B. Hoy, and S. Carr. 2005. “The quality of design documents: What can the CM do?” In CMAA forum on quality of design documents. Vienna, VA: Construction Management Association of America.
MnDOT (Minnesota Department of Transportation). 2005. Addendum 5, Project management book 2B, trunk highway 52 Oronoco design—Build project. St. Paul, MN: MnDOT.
Molenaar, K. R., D. D. Gransberg, N. J. N. West, and E. Kraft. 2012. Guidebook on alternative quality management systems for highway construction. Washington, DC: Transportation Research Board of the National Academies.
Mollaoglu, S., A. Garcia, H. Kalhor, and B. Polkington. 2019. Guidebook for integrating collaborative partnering into traditional airport practices. Washington, DC: Airport Cooperative Research Program.
Pellicer, E. 2005. “Cost control in consulting engineering firms.” J. Manage. Eng. 21 (4): 189–192. https://doi.org/10.1061/(ASCE)0742-597X(2005)21:4(189).
Pinto-Nunez, M., C. Lopez del Puerto, and D. D. Gransberg. 2018. “Analysis of transportation agencies’ claim history: Partnered versus non-partnered.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (4): 04518019 https://doi.org/10.1061/(ASCE)LA.1943-4170.0000273.
Sabri, O., O. Lædre, and A. Bruland. 2022. “A structured literature review on construction conflict prevention and resolution: A modified approach for engineering.” Org. Tech. Manage. Constr. Int. J. 14 (1): 2616–2630. https://doi.org/10.2478/otmcj-2022-0006.
Scott, S., K. R. Molenaar, D. D. Gransberg, and N. Smith. 2006. Best value procurement for highway construction projects. Washington, DC: Transportation Research Board.
Sparkling, A. E., S. Mollaoglu, and A. Kirca. 2016. “Research synthesis connecting trends in architecture, engineering, and construction project partnering.” J. Manage. Eng. 33 (1): 04016033. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000481.
Tran, D. Q., and K. R. Molenaar. 2013. “Impact of risk on design-build selection for highway design and construction projects.” J. Manage. Eng. 30 (2): 153–162. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000210.
Tran, D. Q., L. Nguyen, and A. Faught. 2017. “Examination of communication processes in design-build project delivery in building construction.” Eng. Constr. Archit. Manage. 24 (2): 1319–1336. https://doi.org/10.1108/ECAM-12-2015-0192.
TxDOT (Texas Department of Transportation). 2008. Quality assurance program for design-build projects with an optional 15-year capital maintenance agreement. Austin, TX: TxDOT.
Venters, V. G. 2004. “Cost of quality.” In 2004 transactions, EST.04.01–EST.04.07. Washington, DC: AACEI.
WBDG (Whole Building Design Guide). 2021. “Federal green construction guide for specifiers.” Accessed March 14, 2023. https://www.wbdg.org/FFC/EPA/FEDGREEN/fgs_018110.pdf.
Weston, D. C., and G. E. Gibson. 1993. “Partnering project performance in U.S. Army Corps of Engineers.” J. Manage. Eng. 9 (2): 410–425. https://doi.org/10.1061/(ASCE)9742-597X(1993)9:4(410).

Information & Authors

Information

Published In

Go to Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 16Issue 1February 2024

History

Received: Apr 13, 2023
Accepted: Aug 10, 2023
Published online: Oct 6, 2023
Published in print: Feb 1, 2024
Discussion open until: Mar 6, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Bridget Kocot, P.E. [email protected]
RiverRenew Quality Manager, Brown and Caldwell, 1725 Duke St. Unit 250, Alexandria, VA 22314. Email: [email protected]
Douglas D. Gransberg, Ph.D., P.E., F.ASCE https://orcid.org/0000-0002-5588-5024 [email protected]
President, Gransberg & Associates, Inc., P.O. Box 2395, Norman, OK 73070 (corresponding author). ORCID: https://orcid.org/0000-0002-5588-5024. Email: [email protected]
Ricardo M. Tapia, Ph.D. [email protected]
President, TNA Corporation, Ocean Business Plaza 1403, Panama City, Panama. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share