Technical Papers
Jul 17, 2024

Understanding the Double-Edged Sword Effect of Contract Flexibility on Contractor’s Opportunistic Behavior in Construction Project: Moderating Role of BIM Application Degree

Publication: Journal of Construction Engineering and Management
Volume 150, Issue 10

Abstract

Contract flexibility is like a double-edged sword for contractor opportunistic behavior, and it may both inhibit and promote such opportunistic behavior. This study constructs a dual-path integration model in which contract flexibility affects contractor’s opportunistic behavior through trust and conflict. Based on principal-agent theory, building information modeling (BIM) application degree was selected as a moderating variable for the double-edged sword effect of contract flexibility. A partial least-squares structural equation model (SEM) was used to verify hypothesis based on data collected from 271 questionnaires. The results show that contract flexibility has a positive effect on reducing the opportunistic behavior of contractors through trust, and at the same time, it induces the opportunistic behavior of contractors through payment conflicts. Additionally, the BIM application degree does not solve the double-edged sword effect dilemma of contract flexibility, but amplifies the negative effect of contract flexibility, and then induces the contractor’s opportunistic behavior. The findings of this study contribute to the formation mechanism and governance strategy of contract flexibility. It also finds that the use of BIM technology has not achieved the desired effect because the technological development is not synchronized with the development of organizations and people, which provides a new research perspective for the integration of social and technological systems.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, or code generated or used during the study are available from the corresponding author by request.

Acknowledgments

This research was supported by the National Natural Science Foundation of China (72072126).

References

Badenfelt, U. 2010. “I trust you, I trust you not: A longitudinal study of control mechanisms in incentive contracts.” Construct. Manage. Econ. 28 (3): 301–310. https://doi.org/10.1080/01446191003587745.
Becker, J. M., K. Klein, and M. Wetzels. 2012. “Hierarchical latent variable models in PLS-SEM: Guidelines for using reflective-formative type models.” Long Range Plann. 45 (5–6): 359–394. https://doi.org/10.1016/j.lrp.2012.10.001.
Brady, T., A. Davies, and P. Nightingale. 2012. “Dealing with uncertainty in complex projects: Revisiting Klein and Meckling.” Int. J. Manage. Project Bus. 5 (4): 718–736. https://doi.org/10.1108/17538371211269022.
Cao, Z., and F. Lumineau. 2014. “Revisiting the interplay between contractual and relational governance: A qualitative and meta-analytic investigation.” J. Oper. Manage. 33–34 (1): 15–42. https://doi.org/10.1016/j.jom.2014.09.009.
Chapman, R. J. 2016. “A framework for examining the dimensions and characteristics of complexity inherent within rail megaprojects.” Int. J. Project Manage. 34 (6): 937–956. https://doi.org/10.1016/j.ijproman.2016.05.001.
Chen, M. L., Y. L. Yin, and F. Peng. 2021. “Opening the ‘Schrödinger black box’ between flexible contract and agent behavior—A competitive mediation model based on principal-agent and contract reference point.” [In Chinese.] Manage. Rev. 33 (2): 263–277.
Demirel, H. Ç., W. Leendertse, L. Volker, and M. Hertogh. 2016. “Flexibility in PPP contracts—Dealing with potential change in the pre-contract phase of a construction project.” Construct. Manage. Econ. 35 (4): 196–206. https://doi.org/10.1080/01446193.2016.1241414.
Du, Y. L., and D. Ko. 2019. “A scenario simulation experimental study on the influence of initial trust on contract term control in PPP project.” [In Chinese.] J. Ind. Eng. Manage. 33 (3): 188–195.
Eriksson, P. E., J. Larsson, and O. Pesämaa. 2017. “Managing complex projects in the infrastructure sector—A structural equation model for flexibility-focused project management.” Int. J. Project Manage. 35 (8): 1512–1523. https://doi.org/10.1016/j.ijproman.2017.08.015.
Gao, Y., Q. Guo, S. Zhang, and J. Zhang. 2022. “Understanding the effect of BIM capability imbalance on opportunistic behavior: The case of the Chinese construction market.” J. Manage. Eng. 38 (3): 04022005. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001028.
Gulati, R., P. R. Lawrence, and P. Puranam. 2005. “Adaptation in vertical relationships: Beyond incentive conflict.” Strategy Manage. J. 26 (5): 415–440. https://doi.org/10.1002/smj.458.
Ke, Y., F. Y. Y. Ling, and P. X. W. Zou. 2015. “Effects of contract strategy on interpersonal relations and project outcomes of public sector construction contracts in Australia.” J. Manage. Eng. 31 (4): 1–10. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000273.
Kujala, J., S. Nystén-Haarala, and J. Nuottila. 2015. “Flexible contracting in project business.” Int. J. Manage. Project Bus. 8 (1): 92–106. https://doi.org/10.1108/IJMPB-10-2013-0062.
Lee, C. Y., H.-Y. Chong, and X. Wang. 2018. “Enhancing BIM performance in EPC projects through Integrative trust-based functional contracting model.” J. Constr. Eng. Manage. 144 (7): 06018002. https://doi.org/10.1061/(asce)co.1943-7862.0001521.
Li, L., J. Yuan, M. Tang, Z. Xu, W. Xu, and Y. Cheng. 2021. “Developing a BIM-enabled building lifecycle management system for owners: Architecture and case scenario.” Autom. Constr. 129 (Apr): 103814. https://doi.org/10.1016/j.autcon.2021.103814.
Li, X., G. Rong, and J. B. Thatcher. 2012a. “Does technology trust substitute interpersonal trust?” J. Organ. End. User Comput. 24 (2): 18–38. https://doi.org/10.4018/joeuc.2012040102.
Li, Z., Q. F. Meng, Z. H. Sheng, and Q. Li. 2012b. “Analysis on performance and evolution of mass stimulation under project quality and optimization.” [In Chinese.] Chin. J. Manage. Sci. 20 (3): 112–121.
Liu, J., Z. Wang, M. Skitmore, and L. Yan. 2019. “How contractor behavior affects engineering project value-added performance.” J. Manage. Eng. 35 (4): 04019012. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000695.
Liu, T., H.-Y. Chong, W. Zhang, C.-Y. Lee, and X. Tang. 2022. “Effects of contractual and relational governances on BIM collaboration and implementation for project performance improvement.” J. Constr. Eng. Manage. 148 (6): 04022029. https://doi.org/10.1061/(asce)co.1943-7862.0002285.
Lu, T. Y., G. J. Zhuang, and C. Feng. 2020. “How can network interaction strategies improve the efficacy of interorganizational governance? Task-technology fit (TTF) approach.” [In Chinese.] Manage. World 36 (9): 202–217.
Lu, W., L. Zhang, and L. Zhang. 2016. “Effect of contract completeness on contractors’ opportunistic behavior and the moderating role of interdependence.” J. Constr. Eng. Manage. 142 (6): 04016004. https://doi.org/10.1061/(asce)co.1943-7862.0001110.
Lumineau, F., and B. V. Quélin. 2012. “An empirical investigation of interorganizational opportunism and contracting mechanisms.” Strategy Organ. 10 (1): 55–84. https://doi.org/10.1177/1476127011434798.
Lumineau, F., W. Wang, and O. Schilke. 2021. “Blockchain governance—A new way of organizing collaborations?” Organ. Sci. 32 (2): 500–521. https://doi.org/10.1287/orsc.2020.1379.
Meng, X. 2012. “The effect of relationship management on project performance in construction.” Int. J. Project Manage. 30 (2): 188–198. https://doi.org/10.1016/j.ijproman.2011.04.002.
Merschbrock, C., and B. E. Munkvold. 2015. “Effective digital collaboration in the construction industry—A case study of BIM deployment in a hospital construction project.” Comput. Ind. 73 (Feb): 1–7. https://doi.org/10.1016/j.compind.2015.07.003.
Mohamed, K. A., S. S. Khoury, and S. M. Hafez. 2009. “Contractor’s decision for bid profit reduction within opportunistic bidding behavior of claims recovery.” Int. J. Project Manage. 29 (1): 93–107. https://doi.org/10.1016/j.ijproman.2009.12.003.
Ning, Y. 2018. “Impact of quality performance ambiguity on contractor’s opportunistic behaviors in person-to-organization projects: The mediating roles of contract design and application.” Int. J. Project Manage. 36 (4): 640–649. https://doi.org/10.1016/j.ijproman.2018.01.008.
Schoenherr, T., S. Narayanan, and R. Narasimhan. 2015. “Trust formation in outsourcing relationships: A social exchange theoretic perspective.” Int. J. Prod. Econ. 169 (Apr): 401–412. https://doi.org/10.1016/j.ijpe.2015.08.026.
Shou, Z., X. Zheng, and W. Zhu. 2016. “Contract ineffectiveness in emerging markets: An institutional theory perspective.” J. Oper. Manage. 46 (1): 38–54. https://doi.org/10.1016/j.jom.2016.07.004.
Singh, V., N. Gu, and X. Wang. 2011. “A theoretical framework of a BIM-based multi-disciplinary collaboration platform.” Autom. Constr. 20 (2): 134–144. https://doi.org/10.1016/j.autcon.2010.09.011.
Song, H., F. Zhu, O. J. Klakegg, and P. Wang. 2018. “Relationship between contractual flexibility and contractor’s cooperative behavior.” Int. J. Manage. Project Bus. 11 (2): 382–405. https://doi.org/10.1108/IJMPB-07-2017-0088.
Suprapto, M., H. L. M. Bakker, H. G. Mooi, and M. J. C. M. Hertogh. 2016. “How do contract types and incentives matter to project performance?” Int. J. Project Manage. 34 (6): 1071–1087. https://doi.org/10.1016/j.ijproman.2015.08.003.
Tang, X., H.-Y. Chong, and W. Zhang. 2019. “Relationship between BIM implementation and performance of OSM projects.” J. Manage. Eng. 35 (5): 04019019. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000704.
Vassallo, J. M. 2010. “Flexible-term highway concessions: How can they work better.” Transp. Res. Rec. 2187 (1): 22–28. https://doi.org/10.3141/2187-04.
Wang, D., S. Fang, and K. Li. 2019. “Dynamic changes of governance mechanisms in mega construction projects in China.” Eng. Constr. Archit. Manage. 26 (4): 723–735. https://doi.org/10.1108/ECAM-03-2018-0137.
Wang, Y., Y. Chen, Y. Fu, and W. Zhang. 2017. “Do prior interactions breed cooperation in construction projects? The mediating role of contracts.” Int. J. Project Manage. 35 (4): 633–646. https://doi.org/10.1016/j.ijproman.2017.02.019.
Wang, Y. H., X. C. Ren, and B. C. Deng. 2018. “Research framework on trust reciprocal behavior mechanism of megaprojects.” [In Chinese.] Ind. Eng. Manage. 23 (1): 122–134.
Warmbier, P., A. Kinra, and D. Ivanov. 2022. “Supply chain sustainability and resilience—Relationship and congruent capability analysis based on paradox theory.” IFAC-PapersOnLine 55 (10): 311–316. https://doi.org/10.1016/j.ifacol.2022.09.625.
Wu, G., X. Zhao, and J. Zuo. 2017a. “Relationship between project’s added value and the trust–conflict interaction among project teams.” J. Manage. Eng. 33 (4): 04017011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000525.
Wu, G., X. Zhao, J. Zuo, and G. Zillante. 2017b. “Effects of contractual flexibility on conflict and project success in megaprojects.” Int. J. Conflict Manage. 29 (2): 253–278. https://doi.org/10.1108/IJCMA-06-2017-0051.
Xu, X. Y., and H. X. Gao. 2023a. “The impact of blockchain technology on social trust model and the prevention of trust risk.” [In Chinese.] Acad. Exch. 1 (Apr): 122–135.
Xu, X. Y., and H. X. Gao. 2023b. “The rise of technical trust seen from the perspective of currency evolution and the features of blockchain.” [In Chinese.] Open Times 308 (2): 180–189.
Xu, Y. X., Y. W. Wang, and B. Yao. 2011. “Study on the construction project IPD collaborative management based on building information model.” [In Chinese.] Chin. Civ. Eng. J. 44 (12): 138–143.
Xu, Z., Y. Yin, D. Li, and G. J. Browne. 2018. “Owner’s risk allocation and contractor’s role behavior in a project: A parallel-mediation model.” Eng. Manage. J. 30 (1): 14–23. https://doi.org/10.1080/10429247.2017.1408388.
Yan, L., L. Guo, Y. Ning, and M. Yan. 2021a. “The driving effect of contract flexibility on the contractor’s proactive performance: The moderating role of information transparency.” [In Chinese.] Manage. Rev. 33 (10): 222–236.
Yan, L., S. Wang, and M. Yan. 2021b. “Structural dimension and scale development of contract flexibility from the perspective of whole-process risk sharing.” [In Chinese.] J. Chongqing Univ. 27 (2): 94–108.
Yan, L., S. R. Zhang, and T. Zheng. 2022. “The dynamic relationship between contract governance and trust and project management performance: An integrated analysis perspective of the whole process of contracting in the context of construction projects.” [In Chinese.] Manage. Rev. 34 (4): 251–264.
You, J., Y. Chen, W. Wang, and C. Shi. 2018. “Uncertainty, opportunistic behavior, and governance in construction projects: The efficacy of contracts.” Int. J. Project Manage. 36 (5): 795–807. https://doi.org/10.1016/j.ijproman.2018.03.002.
Zhang, J. L., H. Y. Song, and F. W. Zhu. 2019. “The core issues and research trends of contract flexibility.” [In Chinese.] Foreign Econ. Manage. 41 (1): 73–85.
Zhang, L., S. Huang, C. Tian, and H. Guo. 2020. “How do relational contracting norms affect IPD teamwork effectiveness? A social capital perspective.” Project Manage. J. 51 (5): 538–555. https://doi.org/10.1177/8756972820911241.
Zhang, T., and L. Qian. 2020. “Investing in it: A new method for improving the efficiency of contract governance in interfirm relationships.” Ind. Manage. Data Syst. 120 (6): 1245–1262. https://doi.org/10.1108/IMDS-10-2019-0538.
Zhang, W., and T. Y. Liu. 2019. “Research on the impact of emerging ICT technology in construction project management.” [In Chinese.] Project Manage. Tech. 17 (11): 57–63.
Zhou, H., and Z. Yang. 2014. “A study of opportunism & it’s governance based on relational contracts.” [In Chinese.] Nanjing J. Soc. Sci. 1 (Apr): 43–51.
Zhou, Y. A. 2018. “Re-understanding organizational behavior: Information, rationality and sociality.” [In Chinese.] Acad. Mon. 50 (8): 33–41.
Zhu, F. W., H. Y. Song, J. L. Zhang, and P. Wang. 2018. “The definition and scale development of construction project contractual flexibility.” [In Chinese.] J. Eng. Manage. 32 (4): 116–120.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 10October 2024

History

Received: Sep 21, 2023
Accepted: Apr 1, 2024
Published online: Jul 17, 2024
Published in print: Oct 1, 2024
Discussion open until: Dec 17, 2024

Permissions

Request permissions for this article.

Authors

Affiliations

Professor, Dept. of Construction Management, College of Management, Tianjin Univ. of Technology, 391 Bingshui West Rd., Tianjin 300384, China. Email: [email protected]
Master’s Candidate, Dept. of Construction Management, College of Management, Tianjin Univ. of Technology, 391 Bingshui West Rd., Tianjin 300384, China. Email: [email protected]
Yichao Chen [email protected]
Ph.D. Candidate, Dept. of Construction Management, College of Management, Tianjin Univ. of Technology, 391 Bingshui West Rd., Tianjin 300384, China (corresponding author). Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share