Integrated Planning Approach for Optimizing Tower Crane and Truck Locations in Modular Integrated Construction

Publication: Journal of Construction Engineering and Management
Volume 150, Issue 9

Abstract

Tower crane layout planning (TCLP) is key to ensure the safety and productivity of construction projects. Previous studies on TCLP mainly focused on the typical in situ construction method, however, overlooking modular integrated construction (MiC). This study aims to develop an integrated planning approach for optimizing the locations of tower cranes and trucks for MiC across the entire construction site. This approach consists of four objective components. First, identifying potential locations for cranes and trucks by adopting a gridding method and an intersection examination algorithm. Second, estimating the crane operation duration. Third, optimizing the crane and truck locations by developing an integer linear programming (ILP) model while considering various constraints, such as the demand fulfillment, the crane’s lifting capacity, and the multiple truck parking areas. Lastly, optimizing the distance between cranes to avoid crane blocking on site. The proposed approach is validated via three high-rise residential MiC projects. The results achieve 19.4%–37.9% reductions in cranes’ operation durations, as well as carbon emissions from the original plan. Compared with another existing TCLP method made from limited predefined layout plans, a 29.4% improvement is observed. Moreover, three aspects to extend the application of the approach are discussed: (1) the multiple tower crane layout scenario, (2) the impact of the number of truck points, and (3) the trade-offs between computing effectiveness and performance. The approach realizes the objective of TCLP decision-making for multi-crane multitruck MiC throughout the whole construction site. Construction practitioners can use this approach for decision-making which helps enhance the effectiveness of their tower crane layout designs.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abdelmageed, S., and T. Zayed. 2020. “A study of literature in modular integrated construction - Critical review and future directions.” J. Cleaner Prod. 277 (Apr): 124044. https://doi.org/10.1016/j.jclepro.2020.124044.
Al Hattab, M., E. Zankoul, M. Barakat, and F. Hamzeh. 2018. “Crane overlap and operational flexibility: Balancing utilization, duration, and safety.” Constr. Innov. 18 (1): 43–63. https://doi.org/10.1108/CI-11-2016-0062.
Anylogic. 2021. “Anylogic simulation software make intelligent decisions.” Accessed April 30, 2021. https://www.anylogic.com/.
BD (Building Department). 2022. “Modular integrated construction.” Accessed June 17, 2022. https://www.bd.gov.hk/en/resources/codes-and-references/modular-integrated-construction/index.html.
Dasovic, B., M. Galic, and U. Klansek. 2019. “Active BIM approach to optimize work facilities and tower crane locations on construction sites with repetitive operations.” Buildings 9 (1): 21. https://doi.org/10.3390/buildings9010021.
Diaz, J. 2020. “Crane accident in austin injures at least 20 people.” Accessed January 3, 2024. https://www.nytimes.com/2020/09/16/us/austin-crane-collapse.html.
DOSH (Department of Occupational Safety and Health). 2009. “An accident involving collision of two tower cranes.” Accessed December 14, 2023. https://www.dosh.gov.my/doshV2/index.php?option=com_content&view=article&id=121:an-accident-involving-collision-of-two-tower-cranes&catid=84:safety-alerts&Itemid=118&lang=en.
Eltoukhy, A. E. E., M. Hussein, M. Xu, and F. T. S. Chan. 2023. “Data-driven game-theoretic model based on blockchain for managing resource allocation and vehicle routing in modular integrated construction.” Int. J. Prod. Res. 61 (13): 4472–4502. https://doi.org/10.1080/00207543.2022.2154406.
Goh, J., S. Hu, and Y. Fang. 2019. Human-in-the-loop simulation for crane lift planning in modular construction on-site assembly. Reston, VA: ASCE.
Hasan, S., A. Bouferguene, M. Al-Hussein, P. Gillis, and A. Telyas. 2013. “Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects.” Autom. Constr. 31 (Jan): 255–264. https://doi.org/10.1016/j.autcon.2012.11.044.
Hebiba, A. M., A. Bouferguene, S. Moon, and S. Han. 2022. “Wind-wise automated stability analysis for selection of tower crane and location.” J. Constr. Eng. Manage. 148 (11): 04022127. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002377.
Hu, S., Y. Fang, and Y. Bai. 2021a. “Automation and optimization in crane lift planning: A critical review.” Adv. Eng. Inf. 49 (Sep): 101346. https://doi.org/10.1016/j.aei.2021.101346.
Hu, S., Y. Fang, and H. Guo. 2021b. “A practicality and safety-oriented approach for path planning in crane lifts.” Autom. Constr. 127 (Jun): 103695. https://doi.org/10.1016/j.autcon.2021.103695.
Huang, C., and C. K. Wong. 2018. “Optimization of crane setup location and servicing schedule for urgent material requests with non-homogeneous and non-fixed material supply.” Autom. Constr. 89 (Aug): 183–198. https://doi.org/10.1016/j.autcon.2018.01.015.
Huang, C., C. K. Wong, and C. M. Tam. 2011. “Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming.” Autom. Constr. 20 (5): 571–580. https://doi.org/10.1016/j.autcon.2010.11.023.
Hussein, M., A. E. E. Eltoukhy, A. Karam, I. A. Shaban, and T. Zayed. 2021. “Modelling in off-site construction supply chain management: A review and future directions for sustainable modular integrated construction.” J. Cleaner Prod. 310 (Sep): 127503. https://doi.org/10.1016/j.jclepro.2021.127503.
Hussein, M., and T. Zayed. 2021. “Crane operations and planning in modular integrated construction: Mixed review of literature.” Autom. Constr. 122 (Nov): 103466. https://doi.org/10.1016/j.autcon.2020.103466.
Hyun, H., M. Park, D. Lee, and J. Lee. 2021. “Tower crane location optimization for heavy unit lifting in high-rise modular construction.” Buildings 11 (3): 121. https://doi.org/10.3390/buildings11030121.
IBM (International Business Machines Corporation). 2022. “What can IBM CPLEX optimizer do for business?” Accessed June 17, 2022. https://www.ibm.com/hk-en/analytics/cplex-optimizer.
Irizarry, J., and E. P. Karan. 2012. “Optimizing location of tower cranes on construction sites through GIS and BIM integration.” J. Inf. Technol. Constr. 17 (23): 351–366.
Ji, Y., and F. Leite. 2020. “Optimized planning approach for multiple tower cranes and material supply points using mixed-integer programming.” J. Constr. Eng. Manage. 146 (3): 04020007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001781.
Lawson, R. M., R. G. Ogden, and R. Bergin. 2012. “Application of modular construction in high-rise buildings.” J. Archit. Eng. 18 (2): 148–154. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000057.
Lee, G., H.-H. Kim, C.-J. Lee, S.-I. Ham, S.-H. Yun, H. Cho, B. K. Kim, G. T. Kim, and K. Kim. 2009. “A laser-technology-based lifting-path tracking system for a robotic tower crane.” Autom. Constr. 18 (7): 865–874. https://doi.org/10.1016/j.autcon.2009.03.011.
Li, Y., and C. Liu. 2012. “Integrating field data and 3D simulation for tower crane activity monitoring and alarming.” Autom. Constr. 27 (Sep): 111–119. https://doi.org/10.1016/j.autcon.2012.05.003.
Lien, L. C., and M. Y. Cheng. 2014. “Particle bee algorithm for tower crane layout with material quantity supply and demand optimization.” Autom. Constr. 45 (Jan): 25–32. https://doi.org/10.1016/j.autcon.2014.05.002.
Liu, G., R. Chen, P. Xu, Y. Fu, C. Mao, and J. Hong. 2020. “Real-time carbon emission monitoring in prefabricated construction.” Autom. Constr. 110 (Feb): 102945. https://doi.org/10.1016/j.autcon.2019.102945.
Marzouk, M., and A. Abubakr. 2016. “Decision support for tower crane selection with building information models and genetic algorithms.” Autom. Constr. 61 (Jan): 1–15. https://doi.org/10.1016/j.autcon.2015.09.008.
Nadoushani, Z. S. M., A. W. A. Hammad, and A. Akbarnezhad. 2016. “Location optimization of tower crane and allocation of material supply points in a construction site considering operating and rental costs.” J. Constr. Eng. Manage. 143 (1): 04016089. https://doi.org/10.1061/(asce)co.1943-7862.0001215.
Navaratnam, S., T. Ngo, T. Gunawardena, and D. Henderson. 2019. “Performance review of prefabricated building systems and future research in Australia.” Buildings 9 (2): 38. https://doi.org/10.3390/buildings9020038.
Olearczyk, J., M. Al-Hussein, and A. Bouferguène. 2014. “Evolution of the crane selection and on-site utilization process for modular construction multilifts.” Autom. Constr. 43 (Jun): 59–72. https://doi.org/10.1016/j.autcon.2014.03.015.
Pierini, E. 2014. “Tower cranes collide in Longdon.” Accessed December 13, 2023. https://www.craneblogger.com/safety/tower-cranes-collide-in-london/2014/03/10/.
Raviv, G., B. Fishbain, and A. Shapira. 2017. “Analyzing risk factors in crane-related near-miss and accident reports.” Saf. Sci. 91 (Jan): 192–205. https://doi.org/10.1016/j.ssci.2016.08.022.
Sanad, H. M., M. A. Ammar, and M. E. Ibrahim. 2008. “Optimal construction site layout considering safety and environmental aspects.” J. Constr. Eng. Manage. 134 (7): 536–544. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:7(536).
Tam, C. M., and T. K. L. Tong. 2003. “GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction.” Constr. Manage. Econ. 21 (3): 257–266. https://doi.org/10.1080/0144619032000049665.
Tam, C. M., T. K. L. Tong, and W. K. W. Chan. 2001. “Genetic algorithm for optimizing supply locations around tower crane.” J. Constr. Eng. Manage. 127 (4): 315–321. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:4(315).
Wang, J., X. D. Zhang, W. C. Shou, X. Y. Wang, B. Xu, M. J. Kim, and P. Wu. 2015. “A BIM-based approach for automated tower crane layout planning.” Autom. Constr. 59 (Jan): 168–178. https://doi.org/10.1016/j.autcon.2015.05.006.
Wang, R. D., T. Zayed, W. Pan, S. Zheng, and S. Tariq. 2021. “A system boundary-based critical review on crane selection in building construction.” Autom. Constr. 123 (Sep): 103520. https://doi.org/10.1016/j.autcon.2020.103520.
Wu, K., B. García de Soto, and F. Zhang. 2020. “Spatio-temporal planning for tower cranes in construction projects with simulated annealing.” Autom. Constr. 111 (Mar): 103060. https://doi.org/10.1016/j.autcon.2019.103060.
Yeoh, J. K. W., and D. K. H. Chua. 2018. “Optimizing crane selection and location for multistage construction using a four-dimensional set cover approach.” J. Constr. Eng. Manage. 144 (5): 04017029. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001474.
Younes, A., and M. Marzouk. 2018. “Tower cranes layout planning using agent-based simulation considering activity conflicts.” Autom. Constr. 93 (Jun): 348–360. https://doi.org/10.1016/j.autcon.2018.05.030.
Zhang, P., F. C. Harris, and P. O. Olomolaiye. 1996. “A computer-based model for optimizing the location of a single tower crane.” Build. Res. Inf. 24 (2): 113–123. https://doi.org/10.1080/09613219608727511.
Zhang, P., F. C. Harris, P. O. Olomolaiye, and G. D. Holt. 1999. “Location optimization for a group of tower cranes.” J. Constr. Eng. Manage. 125 (2): 115–122. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:2(115).
Zhang, Z., and W. Pan. 2021a. “Multi-criteria decision analysis for tower crane layout planning in high-rise modular integrated construction.” Autom. Constr. 127 (Sep): 103709. https://doi.org/10.1016/j.autcon.2021.103709.
Zhang, Z., and W. Pan. 2021b. “Virtual reality supported interactive tower crane layout planning for high-rise modular integrated construction.” Autom. Constr. 130 (Oct): 103854. https://doi.org/10.1016/j.autcon.2021.103854.
Zhang, Z., W. Pan, and M. Pan. 2022. “Critical considerations on tower crane layout planning for high-rise modular integrated construction.” Eng. Constr. Archit. Manage. 29 (7): 2615–2634. https://doi.org/10.1108/ECAM-03-2021-0192.
Zhou, C., F. Dai, Z. Xiao, and W. Liu. 2023. “Location optimization of tower cranes on high-rise modular housing projects.” Buildings 13 (1): 115. https://doi.org/10.3390/buildings13010115.
ZSMPG (Zhongshan Municipal People’s Government). 2021. “Report on the construction safety accidents.” Accessed December 15, 2023. http://www.zs.gov.cn/chxq/gggs/content/post_2183653.html.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 9September 2024

History

Received: Jun 28, 2023
Accepted: Jan 31, 2024
Published online: Jul 15, 2024
Published in print: Sep 1, 2024
Discussion open until: Dec 15, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Roy Dong Wang, Ph.D. [email protected]
Postdoctoral Fellow, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong SAR. Email: [email protected]
Tarek Zayed, Ph.D., M.ASCE [email protected]
Professor, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong SAR. Email: [email protected]
Assistant Professor, Management Science and Engineering Dept., Khalifa Univ., Abu Dhabi, UAE (corresponding author). ORCID: https://orcid.org/0000-0001-5714-3641. Email: [email protected]
Hengqin Wu, Ph.D. [email protected]
Postdoctoral Fellow, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong SAR. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share