Abstract

This research aims to identify, categorize, and prioritize the benefits and challenges of implementing common data environments (CDEs) in the construction phase of building information modeling (BIM)-based projects. For this purpose, a systematic literature review, semistructured interviews, and the Delphi method were conducted, and online sources of CDE providers were investigated. 54 benefits and 15 challenges were identified. Cronbach’s alpha, standard deviation, interrater agreement level, and significance level statistics were calculated to analyze and validate Delphi method outputs. Results demonstrate that the most important benefit of implementing CDEs in the construction phase of BIM-based projects is access to accurate, reliable, up-to-date information. The most critical challenge is the exclusion of CDE planning in the front-end phase of the project. Prioritizing the benefits shows CDEs’ full potential for the construction phase of BIM-based projects. Prioritizing the challenges demonstrates possible future works, requirements, and the areas that should be improved. This research provides a comprehensive point of view on the benefits and challenges of implementing CDEs in the construction phase of BIM-based projects. It analyzes the potential of CDEs by strengthening the findings from the systematic literature review with the SMEs’ evaluation, comments, and feedback. This study provides valuable insights into implementing CDEs in the construction phase of BIM-based projects, defining their capabilities, status, and potential, and giving suggestions about how to deal with their challenges. This research shows how CDEs ensure streamlining information and communication flows in BIM-based projects by mitigating nonvalue-added activities resulting from informal, nonstandardized data exchanges, lack of proper data exchange protocols, loss of project data, and lack of efficient collaboration and communication between project team participants. This study reveals the importance of implementing CDEs in the construction phase of BIM-based projects to achieve adequate information and communication management that may prevent project data loss, informal, nonstandardized data exchanges, and inefficient collaboration between multidisciplinary teams.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

The authors thank all experts who participated in the Delphi survey and interview processes for their collaboration and valuable opinions.

References

Abanda, F., D. Mzyece, A. Oti, and M. Manjia. 2018. “A study of the potential of cloud/mobile BIM for the management of construction projects.” Appl. Syst. Innovation 1 (2): 9. https://doi.org/10.3390/asi1020009.
Adriaanse, A., H. Voordijk, and G. Dewulf. 2010. “Adoption and use of interorganizational ICT in a construction project.” J. Constr. Eng. Manage. 136 (9): 1003–1014. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000201.
Afolabi, A. O., L. M. Amusan, J. D. Owolabi, R. A. Ojelabi, O. Joshua, and P. F. Tunji-Olayeni. 2018. “Assessment of the linkages and leakages in a cloud-based computing collaboration among construction stakeholder.” In Proc., American Society of Civil Engineers (ASCE) Construction Research Congress (CRC) 2018, 673–683. Reston, VA: ASCE. https://doi.org/10.1061/9780784481264.066.
Afsari, K., C. Eastman, and D. Shelden. 2016. “Cloud-based BIM data transmission: Current status and challenges.” In Vol. 33 of Proc., Int. Symp. on Automation and Robotics in Construction, 1. Edinburgh: International Association for Automation and Robotics in Construction.
Afsari, K., C. Eastman, and D. Shelden. 2017. “Building information modeling data interoperability for Cloud-based collaboration: Limitations and opportunities.” Int. J. Archit. Comput. 15 (3): 187–202. https://doi.org/10.1177/1478077117731174.
Ahmad, I., M. K. Sein, and K. Panthi. 2010. “Challenges of integration and ICT’s potentials in the globalized construction industry.” In Proc., PICMET 2010 Technology Management for Global Economic Growth, 1–7. New York: IEEE.
Akob, Z., M. Zaidee, A. Hipni, and R. Koka. 2019. “Coordination and collaboration of information for Pan Borneo Highway (Sarawak) via common data environment (CDE).” Proc. IOP Conf. Ser. Mater. Eng. 512 (Feb): 012001. https://doi.org/10.1088/1757-899x/512/1/012001.
Akponeware, A., and Z. Adamu. 2017. “Clash detection or clash avoidance? An investigation into coordination problems in 3D BIM.” Buildings 7 (3): 75–103. https://doi.org/10.3390/buildings7030075.
Alreshidi, E., M. Mourshed, and Y. Rezgui. 2017. “Factors for effective BIM governance.” J. Build. Eng. 10 (Mar): 89–101. https://doi.org/10.1016/j.jobe.2017.02.006.
Alreshidi, E., M. Mourshed, and Y. Rezgui. 2018. “Requirements for cloud-based BIM governance solutions to facilitate team collaboration in construction projects.” Requir. Eng. 23 (1): 1–31. https://doi.org/10.1007/s00766-016-0254-6.
Atkinson, E., J. Spillane, J. Bradley, and T. Brooks. 2022. “Challenges in the adoption of mobile information communication technology (M-ICT) in the construction phase of infrastructure projects in the UK.” Int. J. Build. Pathol. Adapt. 40 (3): 327–344. https://doi.org/10.1108/IJBPA-04-2021-0048.
Autodesk. 2022. “Building information modeling.” Accessed December 5, 2022. https://www.autodesk.com/industry/aec/bim.
Banfi, F., R. Brumana, G. Salvalai, and M. Previtali. 2022. “Digital twin and cloud BIM-XR platform development: From scan-to-BIM-to-DT process to a 4D multi-user live app to improve building comfort, efficiency and costs.” Energies 15 (12): 4497. https://doi.org/10.3390/en15124497.
Bello, S., L. O. Oyedele, A. O. Akinade, M. Blala, J. M. D. Delgado, L. A. Akanbi, A. O. Ajayi, and H. A. Owolabi. 2021. “Cloud computing in construction industry: Use cases, benefits and challenges.” Autom. Constr. 122 (Feb): 103441. https://doi.org/10.1016/j.autcon.2020.103441.
Berente, N., R. Baxter, and K. Lyytinen. 2010. “Dynamics of inter-organizational knowledge creation and information technology use across object worlds: The case of an innovative construction project.” Construct. Manage. Econ. 28 (6): 569–588. https://doi.org/10.1080/01446193.2010.489926.
Bland, J. M., and D. G. Altman. 1997. “Statistics notes: Cronbach’s alpha.” BMJ 314: 572. https://doi.org/10.1136/bmj.314.7080.572.
Brown, B. 1968. A methodology used for the elicitation of opinions of experts. Santa Monica, CA: Rand.
Brown, R. D., and N. M. A. Hauenstein. 2005. “Interrater agreement reconsidered: An alternative to the RWG Indices.” Organ. Res. Methods 8 (2): 165–184. https://doi.org/10.1177/1094428105275376.
Brumana, R., C. Stanga, and F. Banfi. 2021. “Models and scales for quality control: Toward the definition of specifications (GOA-LOG) for the generation and re-use of HBIM object libraries in a common data environment.” Appl. Geomatics 14 (Mar): 151–179. https://doi.org/10.1007/s12518-020-00351-2.
buildingSMART International. 2022. “openBIM—buildingSMART International.” Accessed November 15, 2021. https://www.buildingsmart.org/about/openbim/.
Chong, H., J. Wong, and X. Wang. 2014. “An explanatory case study on cloud computing applications in the built environment.” Autom. Constr. 44: 152–162. https://doi.org/10.1016/j.autcon.2014.04.010.
Chuang, T. H., B. C. Lee, and I. C. Wu. 2011. “Applying cloud computing technology to BIM visualization and manipulation.” In Vol. 201 of Proc., 28th Int. Symp. on Automation and Robotics in Construction, 144–149.
Cooper, H. 2010. Research synthesis and meta-analysis: A step-by-step approach. 4th ed. Thousand Oaks, CA: SAGE.
Creswell, J. W. 2014. Research design: Qualitative, quantitative, and mixed methods approaches. 4th ed. Thousand Oaks, CA: SAGE.
Dalkey, N. C. 1969. The Delphi method: An experimental study of group opinion, 1–18. Santa Monica, CA: Rand Corporation.
Das, M., J. C. P. Cheng, and S. S. Kumar. 2015. “Social BIMCloud: A distributed cloud-based BIM platform for object-based lifecycle information exchange.” Visualization Eng. 3 (8): 2–20. https://doi.org/10.1186/s40327-015-0022-6.
Denzin, N. K. 2009. The research act: A theoretical introduction to sociological methods. 1st ed. New York: Routledge. https://doi.org/10.4324/9781315134543.
DeVellis, R. F. 2003. Scale development: Theory and applications. 2nd ed. Thousand Oaks, CA: SAGE.
Dickenson, R., and B. Harland. 2019. “Digital engineering on the Sydney metro.” In Tunnels and underground cities: Engineering and innovation meet archaeology, architecture and art, 2043–2050. Boca Raton, FL: CRC Press.
Duffy, K., B. Graham, and K. Thomas. 2007. “Assessing the potential for construction collaboration technologies (CCT) in small to medium enterprises in the Irish construction industry.” In Proc., 23rd Annual ARCOM Conf., edited by D. Boyd, 461–468. Belfast, UK: Association of Researchers in Construction Management.
Duguid, B., J. Hyde, and H. Pullan. 2017. “The Ordsall chord, Manchester, UK–digital delivery of design.” In Vol. 109 of Proc., IABSE Symp.: Engineering the Future, 1566–1573. Zurich, Switzerland: International Association for Bridge and Structural Engineering.
Eastman, C. M., C. Eastman, P. Teicholz, R. Sacks, and K. Liston. 2011. BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. Hoboken, NJ: Wiley.
El-Gohary, N. M., and T. E. El-Diraby. 2009. “Dynamic knowledge-based process integration portal for collaborative construction.” J. Constr. Eng. Manage. 136 (3): 316–328. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000147.
Fellows, R. F., and A. M. M. Liu. 2015. Research methods for construction. Chichester, UK: Wiley.
Godager, B., E. Onstein, and L. Huang. 2021. “The concept of enterprise BIM: Current research practice and future trends.” IEEE Access 9 (Mar): 42265–42290. https://doi.org/10.1109/ACCESS.2021.3065116.
Hallowell, M. R., and J. A. Gambatese. 2010. “Qualitative research: Application of the Delphi method to CEM research.” J. Construct. Eng. Manage. 136 (1): 99–107. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000137.
Hasan, A., S. Ahn, R. Rameezdeen, and B. Baroudi. 2019. “Empirical study on implications of mobile ICT use for construction project management.” J. Manage. Eng. 35 (6): 04019029. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000721.
Hasson, F., and S. Keeney. 2011. “Enhancing rigour in the Delphi technique research.” Technol. Forecast. Soc. Change 78 (9): 1695–1704. https://doi.org/10.1016/j. techfore.2011.04.005.
ISO. 2019. Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM)—Information management using building information modeling—Part 1: Concepts and principles. ISO 19650-1. Geneva: ISO.
Jahanger, Q. K., J. Louis, C. Pestana, and D. Trejo. 2021. “Potential positive impacts of digitalization of construction-phase information management for project owners.” J. Inf. Technol. Construct. 26 (1): 1–22. https://doi.org/10.36680/j.itcon.2021.001.
Jick, T. D. 1979. “Mixing qualitative and quantitative methods: Triangulation in action.” Admin. Sci. Q. 24 (4): 602–611. https://doi.org/10.2307/2392366.
Khawaja, E. U. R., and A. Mustapha. 2021. “Mitigating disputes and managing legal issues in the era of building information modelling.” J. Construct Dev. Countries 26 (1): 111–130. https://doi.org/10.21315/jcdc2021.26.1.6.
Klemt-Albert, K., P. Hagedorn, and T. Pullmann. 2018. “Utilising the potential of standardised BIM models by a fundamental transformation of collaboration processes.” In Vol. 10864 of Advanced computing strategies for engineering. EG-ICE 2018. Lecture notes in computer science, edited by I. Smith and B. Domer. Berlin: Springer. https://doi.org/10.1007/978-3-319-91638-5_26.
Knowledge, J. B. 2021. “The annual construction technology report.” Accessed November 6, 2021. https://contechreport.com/.
Lebreton, J. M., and J. L. Senter. 2008. “Answers to 20 questions about interrater reliability and interrater agreement.” Organ. Res. Methods 11 (4): 815–852. https://doi.org/10.1177/1094428106296642.
Lee, J., and L. Bernold. 2008. “Ubiquitous agent-based communication in construction.” J. Comput. Civ. Eng. 22 (1): 31–39. https://doi.org/10.1061/(ASCE)0887-3801(2008)22:1(31).
Leon M., and R. Laing. 2013. “Cloud and computer mediated collaboration in the early architectural design stages: A study of early design stage collaboration related to BIM and the cloud.” In Vol. 2 of Proc., 5th Int. Conf. on Cloud Computing Technology and Science, 94–99. New York: IEEE.
Lestari, S. A., H. Purwanto, and J. Saputra. 2022. “Application of common data environment (CDE) as a method of design review in construction project.” J. Eng. Des. Tech. 22 (2): 103–109.
Li, H., S. T. Ng, and M. Skitmore. 2013. “Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach.” Autom. Constr. 29 (Apr): 123–135. https://doi.org/10.1016/j.autcon.2012.09.007.
Liker, J. 2004. The Toyota way: 14 management principles from the world’s greatest manufacturer. New York: McGraw-Hill.
Logothetis, S., E. Karachaliou, E. Valari, and E. Stylianidis. 2018. “Open source cloud-based technologies for BIM.” In Vol. XLII-2 of Proc., Int. Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences. Riva del Garda, Italy: International Society of Photogrammetry and Remote Sensing.
Losev, K. Y. 2020. “The common data environment features from the building life cycle perspective.” Proc. IOP Conf. Ser.: Mater. Sci. Eng. 913 (4): 042012. https://doi.org/10.1088/1757-899X/913/4/042012.
Martínez-Rojas, M., N. Marín, and M. Vila. 2015. “The role of information technologies to address data handling in construction project management.” J. Comput. Civ. Eng. 30 (4): 04015064. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000538.
Matthews, J., P. Love, S. Heinemann, R. Chandler, C. Rumsey, and O. Olatunj. 2015. “Real-time progress management: Re-engineering processes for cloud-based BIM in construction.” Autom. Constr. 58 (Oct): 38–47. https://doi.org/10.1016/j.autcon.2015.07.004.
Mayer, P., T. Funtík, J. Gašparík, and P. Makýš. 2021. “Analysis of the current state of automation of hazard detection processes in BIM in Slovakia.” Appl. Sci. 11 (17): 8130. https://doi.org/10.3390/app11178130.
Mitchell, J., and J. Plume. 2007. “Collaborative design using a shared IFC building model—Learning from experience.” Autom. Constr. 16 (1): 28–36. https://doi.org/10.1016/j.autcon.2005.10.003.
Mohsen, M., S. Albitar, M. Essam, and A. Radwan. 2019. “Necessity of monitoring vital BIM information for optimized design process management.” WIT Trans. Built Environ. 192 (Jul): 81–91. https://doi.org/10.2495/BIM190081.
Mugumya, K. L., J. Y. Wong, A. Chan, and C. C. Yip. 2019. “The role of linked building data (LBD) in aligning augmented reality (AR) with sustainable construction.” Int. J. Innovative Tech. Exploring Eng. 8 (6S4): 366–372. https://doi.org/10.35940/ijitee.F1074.0486S419.
Nieto-Julián, J. E., L. Lara, and J. Moyano. 2021. “Implementation of a team work-HBIM for the management and sustainability of architectural heritage.” Sustainability 13 (4): 2161. https://doi.org/10.3390/su13042161.
Nitithamyong, P., and M. J. Skibniewski. 2004. “Web-based construction project management systems: How to make them successful?” Autom. Constr. 13 (4): 491–506. https://doi.org/10.1016/j.autcon.2004.02.003.
Nitithamyong, P., and M. J. Skibniewski. 2006. “Success/failure factors and performance measures of web-based construction project management systems: Professionals’ viewpoint.” J. Constr. Eng. Manage. 132 (1): 80–87. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(80).
Oh, M., J. Lee, S. W. Hong, and Y. Jeong. 2015. “Integrated system for BIM-based collaborative design.” Autom. Constr. 58 (2015): 196–206. https://doi.org/10.1016/j.autcon.2015.07.015.
Onungwa, I., N. Olugu-Uduma, and D. R. Shelden. 2021. “Cloud BIM technology as a means of collaboration and project integration in smart cities.” SAGE Open 11 (3): 215824402110332. https://doi.org/10.1177/21582440211033250.
Ozkan, S., and S. Seyis. 2021. “Identification of common data environment functions during construction phase of BIM-based projects.” In Proc., 38th Int. Conf. of CIB W78, 253–262. Ottawa: International Council for Research and Innovation in Building and Construction.
Parisi, F., M. Fanti, and A. Mangini. 2021. “Information and communication technologies applied to intelligent buildings: A review.” J. Inf. Technol. Const. 26 (Jul): 458–488. https://doi.org/10.36680/j.itcon.2021.025.
Parn, E. A., and D. Edwards. 2019. “Cyber threats confronting the digital built environment: Common data environment vulnerabilities and blockchain deterrence.” J. Eng. Construct. Archit. Manage. 26 (2): 245–266. https://doi.org/10.1108/ECAM-03-2018-0101.
Patacas, J., N. Dawood, and M. Kassem. 2020. “BIM for facilities management: A framework and a common data environment using open standards.” Autom. Constr. 120 (Dec): 103366. https://doi.org/10.1016/j.autcon.2020.103366.
Pettigrew, A. M. 1997. “What is processual analysis?” Scand. J. Manage. 13 (4): 337–348. https://doi.org/10.1016/S0956-5221(97)00020-1.
Pili, A. 2019. “BIM process, ontologies and interchange platform for cultural architectural heritage management: State of art and development perspectives.” In Proc., 2nd Int. Conf. of Geomatics and Restoration, 969–973. Milan, Italy: International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences.
Pontrandolfi, R. 2020. “Multiscale GIS-BIM methodological approaches and digital systems for the knowledge of the modern architectural heritage in Italy. The rural village “la Martella” in Matera.” Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci. 44 (Jul): 279–286. https://doi.org/10.5194/isprs-archives-XLIV-M-1-2020-279-2020.
Radl, J., and J. Kaiser. 2019. “Benefits of implementation of common data environment (CDE) into construction projects.” IOP Conf. Ser.: Mater. Sci. Eng. 471 (2): 022021. https://doi.org/10.1088/1757-899X/471/2/022021.
Redmond, A., A. Hore, M. Alshawi, and R. West. 2012. “Exploring how information exchanges can be enhanced through Cloud BIM.” Autom. Constr. 24 (Jul): 175–183. https://doi.org/10.1016/j.autcon.2012.02.003.
Redmond, A., and R. West. 2012. “The use of cloud enabled building information models-an expert analysis.” Aust. J. Constr. Econ. Build. 12 (4): 53–67. https://doi.org/10.5130/AJCEB.v12i4.3037.
Reed, D. 2017. “Eight-stage guide to implementing BIM on a project.” Struct. Eng.: J. Inst. Struct. Eng. 95 (7): 28–30. https://doi.org/10.56330/EUDN6495.
Richards, M. 2010. Building information management: A standard framework and guide to BS 1192. London: BSI Standards.
Schott, P. 2018. “Construction disconnected: The high cost of poor data and miscommunication.” Accessed March 29, 2021. https://blog.plangrid.com/2018/08/fmi-plangrid-construction-report/.
Seidenchnur, M., A. Kücükavci, E. V. Fjerbæk, K. M. Smith, P. Pauwels, and C. A. Hviid. 2022. “A common data environment for HVAC design and engineering.” Autom. Constr. 142 (Oct): 104500. https://doi.org/10.1016/j.autcon.2022.104500.
Seyis, S. 2019. “Pros and cons of using building information modeling in the AEC industry.” J. Constr. Eng. Manage. 145 (8): 04019046. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001681.
Seyis, S. 2020. “Mixed method review for integrating building information modeling and lifecycle assessments.” Build. Environ. 173 (Apr): 106703. https://doi.org/10.1016/j.buildenv.2020.106703.
Shafiq, M. T. 2019. “A case study of client-driven early BIM collaboration.” In Proc., Annual Conf. Canadian Society for Civil Engineering. Montreal, BC, Canada: Canadian Society for Civil Engineering.
Shen, W., Q. Hao, H. Mak, J. Neelamkavil, H. Xie, J. Dickinson, R. Thomas, A. Pardasani, and H. Xue. 2010. “Systems integration and collaboration in architecture, engineering, construction, and facilities management: A review.” Adv. Eng. Inf. 24 (2): 196–207. https://doi.org/10.1016/j.aei.2009.09.001.
Sherry, J. 2018. “Digital engineering enables multinational input on Bergen’s light rail extension, Norway.” Proc. Inst. Civ. Eng. Civ. Eng. 171 (5): 49–56. https://doi.org/10.1680/jcien.17.00025.
Simeone, D., S. Cursi, U. M. Coraglia, and A. Fioravanti. 2020. “Reasoning in common data environments-Re-thinking CDEs to enhance collaboration in BIM processes.” In Vol. 2 of Proc., 38th eCAADe Conf., 499–506. Berlin: Education and Research in Computer Aided Architectural Design in Europe. https://doi.org/10.52842/conf.ecaade.2020.2.499.
Staples, C., and J. Spillane. 2019. “Exploring the potential improvement of quality control in the construction industry with the use of digital technology.” In Proc., 35th Annual ARCOM Conf., 406–415. Leeds, UK: Association of Researchers in Construction Management.
Stransky, M. 2020. “Functions of common data environment supporting procurement of subcontractors.” In Proc., 19th Int. Scientific Conf. Engineering for Rural Development, 793–799. Jelgava, Latvia: Latvia Univ. of Life Sciences and Technologies. https://doi.org/10.22616/ERDev.2020.19.TF186.
Sulankivi, K. 2004. “Benefits of centralized digital information management in multipartner projects.” J. Inf. Tech. Constr. 9 (3): 35–63.
Tabadkani, S. E. 2020. “A comparative analysis of common data environments focusing on the use of Aconex.” Master’s thesis, Building Engineering, Politecnico di Milano, School of Architecture Urban Planning Construction Engineering.
Tao, A., X. M. Das, Y. Liu, and J. C. Cheng. 2021. “Distributed common data environment using blockchain and interplanetary file system for secure BIM-based collaborative design.” Autom. Constr. 130 (Oct): 103851. https://doi.org/10.1016/j.autcon.2021.103851.
Taylor, M. 2017. “Crossrail project: Building a virtual version of London’s Elizabeth line.” Proc. Inst. Civ. Eng. Civ. Eng. 170 (6): 56–63. https://doi.org/10.1680/jcien.17.00022.
Trani, M. L. A., and M. Ruschi. 2021. “Cross information improvement for an H-BIM common data environment.” In Vol. 12642 of Digital heritage. Progress in cultural heritage: Documentation, preservation, and protection, EuroMed 2020, lecture notes in computer science, edited by M. Ioannides, E. Fink, L. Cantoni, and E. Champion. Cham, Switzerland: Springer. https://doi.org/10.1007/978-3-030-73043-7_55.
Turk, Z., M. S. Sonkor, and R. Klinc. 2022. “Cybersecurity assessment of BIM/CDE design environment using cyber assessment framework.” J. Civ. Eng. Manage. 28 (5): 349–364. https://doi.org/10.3846/jcem.2022.16682.
Vaughan, J. L., M. L. Leming, M. Liu, and E. Jaselskis. 2013. “Cost-benefit analysis of construction information management system implementation: Case study.” J. Constr. Eng. Manage. 139 (4): 445–455.
Vite, C., A. S. Horvath, G. Neff, and N. L. H. Møller. 2021. “Bringing human-centeredness to technologies for buildings: An agenda for linking new types of data to the challenge of sustainability.” In Proc., CHItaly 2021: 14th Biannual Conf. of the Italian SIGCHI, 1–8. Milano, Italy: SIGCHI.
Wang, H., and X. Meng. 2021. “BIM-supported knowledge management: Potentials and expectations.” J. Manage. Eng. 37 (4): 04021032.
Won, D., B. Hwang, and S. N. Khairunnisa. 2022. “Cloud computing adoption in the construction industry of Singapore: Drivers, challenges, and strategies.” J. Manage. Eng. 38 (2): 05021017. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001001.
Wong, J., X. Wang, H. Li, G. Chan, and H. Li. 2014. “A review of cloud-based BIM technology in the construction sector.” J. Inf. Tech. Const. 19 (Apr): 281–291.
Wu, W., and R. R. A. Issa. 2012. “Leveraging cloud-BIM for LEED automation.” J. Inf. Tech. Const. 17 (Jun): 367–384.
Yin, R. K. 1994. Case study research: Design and methods. 2nd ed. Thousand Oaks, CA: SAGE.
Zanni, M., K. Ruikar, and R. Soetanto. 2020. “Systematising multidisciplinary sustainable building design processes utilising BIM.” Built Environ. Project Asset Manage. 10 (5): 637–655. https://doi.org/10.1108/BEPAM-05-2020-0088.
Zhang, S., F. Pan, C. Wang, Y. Sun, and H. Wang. 2017. “BIM-based collaboration platform for the management of EPC projects in hydropower engineering.” J. Constr. Eng. Manage. 143 (12): 04017087. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001403.
Zhao, Y., and N. Taib. 2022. “Cloud-based building information modelling (Cloud-BIM): Systematic literature review and Bibliometric-qualitative Analysis.” Autom. Constr. 142 (2022): 104468. https://doi.org/10.1016/j.autcon.2022.104468.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 8August 2024

History

Received: Jun 12, 2023
Accepted: Mar 11, 2024
Published online: Jun 6, 2024
Published in print: Aug 1, 2024
Discussion open until: Nov 6, 2024

Permissions

Request permissions for this article.

Authors

Affiliations

Assistant Professor, Faculty of Engineering, Dept. of Civil Engineering, Ozyegin Univ., Istanbul 34794, Turkey (corresponding author). ORCID: https://orcid.org/0000-0002-9133-9899. Email: [email protected]
Selen Ozkan [email protected]
Graduate Student, Faculty of Engineering, Dept. of Civil Engineering, Ozyegin Univ., Istanbul 34794, Turkey. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share