Technical Papers
Jan 11, 2024

Critical Factors Affecting Quality in Building Construction Projects: Systematic Review and Meta-Analysis

Publication: Journal of Construction Engineering and Management
Volume 150, Issue 3

Abstract

The occurrence of defects in recently completed construction projects in many countries has aroused public attention worldwide. Defects in construction projects are caused by a multitude of factors. Numerous studies have identified and evaluated the critical factors affecting quality in construction projects; nonetheless, no consensus has been reached regarding the factors and their level of influence. Thus, to fill this gap, this research used Preferred Reporting Items for Systematic Reviews and Meta-Analysis (PRISMA) guidelines and prioritized the factors quantitatively. Following the systematic review and meta-analysis, 45 critical factors were identified from 22 relevant studies. Further, heterogeneity, subgroup, and sensitivity analyses were conducted. The findings show that the top seven factors leading to poor quality in construction projects include lack of communication, teamwork, and skilled workers; poor supervision; design errors; design complexity and low bid contracting. The study found very low heterogeneity confirming that ranking using the meta-analysis is reliable. This analysis revealed that project location and type, and publication types, contribute to the heterogeneity of the results. This research work contributes to the existing body of knowledge by identifying and ranking the most critical factors influencing the quality of construction projects across the globe. The stakeholders involved in the delivery of construction projects can prepare strategies for enhancing the quality of their projects based on the findings of this research.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abas, M., S. Khattak, I. Hussain, S. Maqsood, and I. Ahmad. 2015. “Evaluation of factors affecting the quality of construction projects.” Tech. J. Univ. Eng. Tech. (UET) Taxila, Pakistan 20 (2): 115–120.
ACIF (Australian Construction Industry Forum). 2022. “ACIF policy priorities.” Accessed March 4, 2023. https://www.acif.com.au/sb_cache/associationnews/id/605/f/2022%20ACIF%20Policy%20Priorities%20PDF.pdf.
Adenuga, O. A. 2013. “Factors affecting quality in the delivery of public housing projects in Lagos State, Nigeria.” Int. J. Eng. Tech. 3 (3): 332–344.
Akinci, B., F. Boukamp, C. Gordon, D. Huber, C. Lyons, and K. Park. 2006. “A formalism for utilization of sensor systems and integrated project models for active construction quality control.” Autom. Constr. 15 (2): 124–138.
ALFahham, A. F., and H. K. Alajeeli. 2020. “Building a predictive model to improve the quality of government building construction projects in Iraq using multi linear regression technique.” IOP Conf. Ser.: Mater. Sci. Eng. 888 (1): 012060. https://doi.org/10.1088/1757-899X/888/1/012060.
Ali, A. S., and K. H. Wen. 2011. “Building defects: Possible solution for poor construction workmanship.” J. Build. Perform. 2 (1): 11.
Borenstein, M., L. V. Hedges, J. P. Higgins, and H. R. Rothstein. 2009. Introduction to meta-analysis. Hoboken, NJ: Wiley.
Borenstein, M., L. V. Hedges, J. P. Higgins, and H. R. Rothstein. 2021. Introduction to meta-analysis. 2nd ed. Hoboken, NJ: Wiley.
Bosché, F., M. Abdel-Wahab, and L. Carozza. 2016. “Towards a mixed reality system for construction trade training.” J. Comput. Civ. Eng. 30 (2): 04015016. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000479.
Busseri, M. A., and J. M. Palmer. 2000. “Improving teamwork: The effect of self-assessment on construction design teams.” Des. Stud. 21 (3): 223–238.
Callistus, T., A. L. Felix, K. Ernest, B. Stephen, and A. C. Andrew. 2014. “Factors affecting quality performance of construction firms in Ghana: Evidence from small–scale contractors.” Civ. Environ. Res. 6 (5): 18–23.
Chen, L., A. P. Chan, E. K. Owusu, A. Darko, and X. Gao. 2022. “Critical success factors for green building promotion: A systematic review and meta-analysis.” Build. Environ. 207 (Jan): 108452.
Chen, L., Q. Lu, S. Li, W. He, and J. Yang. 2021. “Bayesian Monte Carlo simulation–driven approach for construction schedule risk inference.” J. Manage. Eng. 37 (2): 04020115. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000884.
Chen, L., and H. Luo. 2014. “A BIM-based construction quality management model and its applications.” Autom. Constr. 46: 64–73.
Choi, H.-W., H.-J. Kim, S.-K. Kim, and W. S. Na. 2023. “An overview of drone applications in the construction industry.” Drones 7 (8): 515.
Deng, X., Y. Wang, Q. Zhang, J. X. Huang, and J. Cui. 2014. “Analysis of fraud risk in public construction projects in China.” Public Money Manage. 34 (1): 51–58.
Gan, Y., L. Shen, J. Chen, V. W. Tam, Y. Tan, and I. C. S. Illankoon. 2017. “Critical factors affecting the quality of industrialized building system projects in China.” Sustainability 9 (2): 216. https://doi.org/10.3390/su9020216.
Geletu, N. 2020. Factors affecting quality of construction projects: In the case of selected building construction industries in Addis Ababa, Ethiopia. Twickenham, UK: St. Mary’s Univ.
Gulliver, C. 2022. “Skills shortage ‘challenge of the decade’ for Australia’s construction businesses.” Accessed March 4, 2023. https://www.brentnalls-sa.com.au/skills-shortage-for-australias-construction-industry.
Guo, B. H., Y. Zou, Y. Fang, Y. M. Goh, and P. X. Zou. 2021. “Computer vision technologies for safety science and management in construction: A critical review and future research directions.” Saf. Sci. 135 (Mar): 105130. https://doi.org/10.1016/j.ssci.2020.105130.
Han, C., F. Tang, T. Ma, L. Gu, and Z. Tong. 2022. “Construction quality evaluation of asphalt pavement based on BIM and GIS.” Autom. Constr. 141 (Sep): 104398. https://doi.org/10.1016/j.autcon.2022.104398.
Haupt, T. C., and D. E. Whiteman. 2004. “Inhibiting factors of implementing total quality management on construction sites.” TQM Mag. 16 (3): 166–173. https://doi.org/10.1108/09544780410532891.
Higgins, J. P., J. Thomas, J. Chandler, M. Cumpston, T. Li, M. J. Page, and V. A. Welch. 2019. Cochrane handbook for systematic reviews of interventions. Hoboken, NJ: Wiley.
Hoonakker, P., P. Carayon, and T. Loushine. 2010. “Barriers and benefits of quality management in the construction industry: An empirical study.” Total Qual. Manage. 21 (9): 953–969. https://doi.org/10.1080/14783363.2010.487673.
Hussain, S., Z. Fangwei, A. F. Siddiqi, Z. Ali, and M. S. Shabbir. 2018. “Structural equation model for evaluating factors affecting quality of social infrastructure projects.” Sustainability 10 (5): 1415. https://doi.org/10.3390/su10051415.
Hussein, M., and T. Zayed. 2021. “Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis.” J. Cleaner Prod. 284 (Feb): 124716. https://doi.org/10.1016/j.jclepro.2020.124716.
Johnston, N., and S. Reid. 2019. An examination of building defects in residential multi-owned properties. Goldcoast, QLD, Australia: Griffith Univ.
Jraisat, L., L. Jreisat, and C. Hattar. 2016. “Quality in construction management: An exploratory study.” Int. J. Qual. Reliab. Manage. 33 (7): 920–941. https://doi.org/10.1108/IJQRM-07-2014-0099.
Kang, H., W. Zhang, Y. Ge, H. Liao, B. Huang, J. Wu, R.-J. Yan, and I.-M. Chen. 2023. “A high-accuracy hollowness inspection system with sensor fusion of ultra-wide-band radar and depth camera.” Robotica 41 (4): 1258–1274. https://doi.org/10.1017/S0263574722001692.
Kärnä, S. 2004. “Analysing customer satisfaction and quality in construction—The case of public and private customers.” Nord. J. Surv. Real Estate Res. 2004 (2: 67–80.
Kazaz, A., M. T. Birgonul, and S. Ulubeyli. 2005. “Cost-based analysis of quality in developing countries: A case study of building projects.” Build. Environ. 40 (10): 1356–1365. https://doi.org/10.1016/j.buildenv.2004.11.010.
Kielhauser, C., R. Renteria Manzano, J. J. Hoffman, and B. T. Adey. 2020. “Automated construction progress and quality monitoring for commercial buildings with unmanned aerial systems: An application study from Switzerland.” Infrastructures 5 (11): 98.
Kojo, S. D. J. 2013. “Factors affecting quality assurance in the Ghanaian construction industry.” Bachelor thesis, Dept. of Building Technology, Kwame Nkrumah Univ. of Science and Technology.
Kumar, S. R., S. A. Kumar, T. Bhavanesh, and V. Kavinkumar. 2019. “A study on quantification of factors affecting the quality of construction projects in India.” Int. Res. J. Eng. Technol. 6 (3): 235–243.
Lee, M., Y.-R. Wang, and C.-F. Huang. 2021. “Design and development of a friendly user interface for building construction traceability system.” Microsyst. Technol. 27 (Apr): 1773–1785. https://doi.org/10.1007/s00542-019-04547-4.
Lehtinen, J., G. Locatelli, T. Sainati, Artto Artto, and B. Evans. 2022. “The grand challenge: Effective anti-corruption measures in projects.” Int. J. Project Manage. 40 (4): 347–361.
Li, X., W. Yi, H. L. Chi, X. Wang, and A. P. Chan. 2018. “A critical review of virtual and augmented reality (VR/AR) applications in construction safety.” Autom. Constr. 86 (Feb): 150–162. https://doi.org/10.1016/j.autcon.2017.11.003.
Love, P. E., R. Lopez, and J. T. Kim. 2014. “Design error management: Interaction of people, organisation and the project environment in construction.” Struct. Infrastruct. Eng. 10 (6): 811–820.
Luo, H., L. Ling, K. Chen, A. A. M. Fordjour, and L. Chen. 2022. “Digital technology for quality management in construction: A review and future research directions.” Dev. Built. Environ. 12 (Dec): 100087. https://doi.org/10.1016/j.dibe.2022.100087.
Ma, G., M. Wu, J. Jia, and W. Yang. 2021. “Two-level quality decision support system for building structural damage prediction and maintenance solution recommendation in the operation and maintenance phase.” J. Constr. Eng. Manage. 147 (6): 04021044. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002051.
Ma, Z., S. Cai, N. Mao, Q. Yang, J. Feng, and P. Wang. 2018. “Construction quality management based on a collaborative system using BIM and indoor positioning.” Autom. Constr. 92 (Aug): 35–45. https://doi.org/10.1016/j.autcon.2018.03.027.
Mahamivanan, H., N. Ghassemi, M. Tayarani Darbandi, A. Shoeibi, S. Hussain, F. Nasirzadeh, R. Alizadehsani, D. Nahavandi, A. Khosravi, and S. Nahavandi. 2023. “Material recognition for construction quality monitoring using deep learning methods.” Constr. Innov. 2023 (Jul): 2. https://doi.org/10.1108/CI-04-2022-0074.
Mansour, H., E. Aminudin, B. Omar, R. Zakaria, and N. I. A. Abidin. 2021. “Planning impact and mediations on the quality of construction projects: Case study in Jordan.” Malays. Constr. Res. J. 13 (2): 212–228.
Memon, A. H., I. A. Rahman, M. A. Akhund, A. K. Abro, and H. U. Imad. 2018. “Risk level of the factors affecting the quality of construction projects in Pakistan.” Indian J. Sci. Technol. 11 (48): 1–8. https://doi.org/10.17485/ijst/2018/v11i48/131226.
Moher, D., A. Liberati, J. Tetzlaff, D. G. Altman, and T. Prisma Group. 2009. “Preferred reporting items for systematic reviews and meta-analyses: The PRISMA statement.” Ann. Intern. Med. 151 (4): 264-269. https://doi.org/10.7326/0003-4819-151-4-200908180-00135.
Ndunda, M. M., and S. N. Paul. 2017. “Factors affecting the quality of projects funded by the national government constituencies development fund: A case study of Machakos county.” Int. J. Recent Res. Commerce Econ. Manage. 4 (4): 220–237.
Oke, A., C. Aigbavboa, and E. Dlamini. 2017. “Factors affecting quality of construction projects in Swaziland.” In Proc., 9th Int. Conf. on Construction in the 21st Century. Arnhem, Netherlands: HAN Univ. of Applied Sciences.
Ola-Awo, W. A., I. Saidu, A. Oke, and J. A. Tsado. 2019. “Determination of the critical success factors for attaining quality performance in partnering projects in Lagos and Abuja, Nigeria.” Environ. Sci. Technol. J. 10 (2): 86–98.
Olanrewaju, A., and H. J. A. Lee. 2022. “Analysis of the poor-quality in building elements: Providers’ perspectives.” Front. Built Environ. 2 (2): 81–94.
Osti, F., R. de Amicis, C. A. Sanchez, A. B. Tilt, E. Prather, and A. Liverani. 2021. “A VR training system for learning and skills development for construction workers.” Virtual Reality 25 (Sep): 523–538. https://doi.org/10.1007/s10055-020-00470-6.
Qi, Y., Q. Qian, F. Meijer, and H. Visscher. 2020. “Causes of quality failures in building energy renovation projects of Northern China: A review and empirical study.” Energies 13 (10): 2442. https://doi.org/10.3390/en13102442.
Qi, Y., Q. K. Qian, F. M. Meijer, and H. J. Visscher. 2021. “Unravelling causes of quality failures in building energy renovation projects of northern China: Quality management perspective.” J. Manage. Eng. 37 (3): 04021017. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000888.
Riahi, Z. 2021. “Construction’s $1 Trillion quality cost and how you can turn it into better build quality, reduced rework & lower CO2 footprint.” Accessed March 3, 2023. https://contilio.com/blog/2020/09/21/constructions-1-trillion-quality-challenge-and-how-to-turn-it-into-savings/.
Safapour, E., S. Kermanshachi, and M. Tafazzoli. 2020. “Selection of best practices for mitigating complexity in construction projects.” In Constr. Res. Congr., 667–675. Reston, VA: ASCE.
Said, I., A. R. Ayub, A. Abd Razaki, and K. K. Tee. 2009. Factors affecting construction organization quality management system in the Malaysian construction industry. Penang, Malaysia: Universiti Sains Malaysia.
Shea, B. J., B. C. Reeves, G. Wells, M. Thuku, C. Hamel, J. Moran, D. Moher, P. Tugwell, V. Welch, and E. Kristjansson. 2017. “AMSTAR 2: A critical appraisal tool for systematic reviews that include randomised or non-randomised studies of healthcare interventions, or both.” BMJ 358 (Sep): 21. https://doi.org/10.1136/bmj.j4008.
Sigalov, K., and M. König. 2017. “Recognition of process patterns for BIM-based construction schedules.” Adv. Eng. Inf. 33 (Aug): 456–472. https://doi.org/10.1016/j.aei.2016.12.003.
Sweis, R. 2009. “Some construction quality human-related factors in the Jordanian housing sector.” Archit. Sci. Rev. 52 (1): 48–53. https://doi.org/10.3763/asre.2008.0052.
Tabassi, A. A., M. Ramli, and A. H. A. Bakar. 2012. “Effects of training and motivation practices on teamwork improvement and task efficiency: The case of construction firms.” Int. J. Project Manage. 30 (2): 213–224.
Tang, D., and K. Liu. 2022. “Exploring the application of BIM technology in the whole process of construction cost management with computational intelligence.” Comput. Intell. Neurosci. 2022 (1): 22. https://doi.org/10.1155/2022/4080879.
Tarekegn Gurmu, A., S. Shooshtarian, and M. N. Mahmood. 2022. “Critical evaluation of building defects research: A scientometric analysis.” J. Perform. Constr. Facil. 36 (3): 03122001. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001727.
Tawfik, G. M., K. A. S. Dila, M. Y. F. Mohamed, D. N. H. Tam, N. D. Kien, A. M. Ahmed, and N. T. Huy. 2019. “A step by step guide for conducting a systematic review and meta-analysis with simulation data.” Trop. Med. Health 47 (1): 1–9.
Tchidi, M. F., Z. He, and Y. B. Li. 2012. “Process and quality improvement using Six Sigma in construction industry.” J. Civ. Eng. Manage. 18 (2): 158–172. https://doi.org/10.3846/13923730.2012.657411.
Victorian Government. 2022. “Building defects, professional standards and compliance culture.” Accessed March 6, 2023. https://www.vic.gov.au/systemic-risks-australian-architecture-sector/building-defects-professional-standards-and.
Vigneault, M. A., C. Boton, H. Y. Chong, and B. Cooper-Cooke. 2020. “An innovative framework of 5D BIM solutions for construction cost management: A systematic review.” Arch. Comput. Methods Eng. 27 (Apr): 1013–1030. https://doi.org/10.1007/s11831-019-09341-z.
Von Meding, J., D. Maidi, J. Spillane, J. Bruen, and R. Mcgrath. 2012. “Critical success factors of construction project quality in Brunei Darussalam.” In Proc., Int. Conf. on Sustainable Built Environment for Now and the Future. Berlin: Construction Publishing House.
Wang, J., W. Sun, W. Shou, X. Wang, C. Wu, H.-Y. Chong, Y. Liu, and C. Sun. 2015. “Integrating BIM and LiDAR for real-time construction quality control.” J. Intell. Rob. Syst. 79: 417–432.
Wang, K., F. Guo, C. Zhang, J. Hao, and D. Schaefer. 2022. “Digital technology in architecture, engineering, and construction (AEC) industry: Research trends and practical status toward construction 4.0.” In Proc., Construction Research Congress 2022, 983–992. Reston, VA: ASCE.
Winchur, M. 2019. “Strategies for managing complexity in construction projects.” Accessed August 14, 2023. https://irp-cdn.multiscreensite.com/8bbcaf75/files/uploaded/Strategies%20for%20Managing%20Complexity%20in%20Construction%20Projects%20final.pdf.
Wohlin, C. 2014. “Guidelines for snowballing in systematic literature studies and a replication in software engineering.” In Proc., 18th Int. Conf. on Evaluation and Assessment in Software Engineering, 1–10. New York: ACM Digital Library.
Wong, J. K. W., J. X. Zhou, and A. P. C. Chan. 2018. “Exploring the linkages between the adoption of BIM and design error reduction.” Int. J. Sustain. Dev. Plann. 13 (1): 108–120.
Xu, Z., Y. Liang, H. Lu, W. Kong, and G. Wu. 2022. “An approach for monitoring prefabricated building construction based on feature extraction and point cloud segmentation.” Eng. Constr. Archit. Manage. 30 (10): 5302–5332.
Yaman, S. K., N. M. Yusop, N. E. Z. Hashim, H. Mohammad, and H. A. Bakar. 2022. “Factors affecting quality in construction project life cycle (CPLC).” Int. J. Integr. Eng. 14 (1): 322–335.
Yan, R.-J., E. Kayacan, I.-M. Chen, L. K. Tiong, and J. Wu. 2018. “QuicaBot: Quality inspection and assessment robot.” IEEE Trans. Autom. Sci. Eng. 16 (2): 506–517. https://doi.org/10.1109/TASE.2018.2829927.
Yap, J. B. H., W. J. Leong, and M. Skitmore. 2020. “Capitalising teamwork for enhancing project delivery and management in construction: Empirical study in Malaysia.” Eng. Constr. Archit. Manage. 27 (7): 1479–1503.
Yung, P., and B. Yip. 2010. “Construction quality in China during transition: A review of literature and empirical examination.” Int. J. Project Manage. 28 (1): 79–91. https://doi.org/10.1016/j.ijproman.2009.03.003.
Zhong, B., L. Ding, H. Luo, Y. Zhou, Y. Hu, and H. Hu. 2012. “Ontology-based semantic modeling of regulation constraint for automated construction quality compliance checking.” Autom. Constr. 28 (Dec): 58–70. https://doi.org/10.1016/j.autcon.2012.06.006.
Zwikael, O., R. D. Pathak, F. Y. Ling, S. Titov, Z. Husain, B. Sharma, C. Y. Tay, and D. Samson. 2022. “Variation in project management practices across borders.” Prod. Plann. Control 33 (13): 1270–1282. https://doi.org/10.1080/09537287.2020.1858362.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 3March 2024

History

Received: Mar 21, 2023
Accepted: Oct 4, 2023
Published online: Jan 11, 2024
Published in print: Mar 1, 2024
Discussion open until: Jun 11, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Senior Lecturer in Construction Management, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia (corresponding author). ORCID: https://orcid.org/0000-0003-0750-4191. Email: [email protected]
Muhammad Nateque Mahmood, Ph.D.
Senior Lecturer in Construction, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share