Liability of Foreignness in Public-Private Partnership Projects
Publication: Journal of Construction Engineering and Management
Volume 149, Issue 9
Abstract
With an increasing number of multinational enterprises (MNEs) participating in public-private partnership (PPP) projects worldwide, the liability of foreignness in project construction and management become a manifested research topic in both academia and practice. This study aims to explore the impact of MNE participation on the survival of PPP projects. A unified theoretical framework with internal governance and external institutional environment is elaborated, and a dataset of 4,336 projects in 121 developing countries is derived from the World Bank database to empirically verify our hypotheses. The findings suggest that MNE participation has a detrimental impact on PPP project survival. Additionally, such detrimental impact is mitigated by the two dimensions (regulatory quality, and rule of law) and intensified by two other dimensions (political stability and absence of violence, and control of corruption) of the institutional conditions in the host country. This study contributes to the body of knowledge in two ways: (1) it is one of the pioneer studies that shed light on the liability of foreignness in the context of PPP projects and enhances our understanding of the MNEs’ impacts on infrastructure projects; and (2) it enriches the stream of research on project success/failure by linking MNE participation to project survival and revealing the contingencies of host country’s institutional conditions in the complex global market.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Data generated or analyzed during this study are available from the corresponding author upon reasonable request.
Acknowledgments
This study is supported by the National Natural Science Foundation of China (Grant No. 72271153), the Humanities and Social Sciences Research Project of the Ministry of Education of China (Grant No. 20YJC630099), and the Soft Science Research Project of Shanghai Science and Technology Innovation Program (Grant No. 23692110900).
References
Abednego, M. P., and S. O. Ogunlana. 2006. “Good project governance for proper risk allocation in public–private partnerships in Indonesia.” Int. J. Project Manage. 24 (7): 622–634. https://doi.org/10.1016/j.ijproman.2006.07.010.
Aiken, L. S., S. G. West, and R. R. Reno. 1991. Multiple regression: Testing and interpreting interactions. Thousand Oaks, CA: SAGE.
Aladağ, H., and Z. Işik. 2020. “The effect of stakeholder-associated risks in mega-engineering projects: A case study of a PPP airport project.” IEEE Trans. Eng. Manage. 67 (1): 174–186. https://doi.org/10.1109/TEM.2018.2866269.
Amadi, C., P. Carrillo, and M. Tuuli. 2020. “PPP projects: Improvements in stakeholder management.” Eng. Constr. Archit. Manage. 27 (2): 544–560. https://doi.org/10.1108/ECAM-07-2018-0289.
Anantatmula, V., and M. Thomas. 2010. “Managing global projects: A structured approach for better performance.” Project Manage. J. 41 (2): 60–72. https://doi.org/10.1002/pmj.20168.
Ansar, A., B. Flyvbjerg, A. Budzier, and D. Lunn. 2014. “Should we build more large dams? The actual costs of hydropower megaproject development.” Energy Policy 69 (Jun): 43–56. https://doi.org/10.1016/j.enpol.2013.10.069.
Antillon, E. I., M. J. Garvin, K. R. Molenaar, and A. Javernick-Will. 2018. “Influence of interorganizational coordination on lifecycle design decision making: Comparative case study of public–private partnership highway projects.” J. Manage. Eng. 34 (5): 05018007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000623.
Bell, R. G., I. Filatotchev, and A. A. Rasheed. 2012. “The liability of foreignness in capital markets: Sources and remedies.” J. Int. Bus. Stud. 43 (2): 107–122. https://doi.org/10.1057/jibs.2011.55.
Chan, A. P. C., P. T. I. Lam, Y. Wen, E. E. Ameyaw, S. Wang, and Y. Ke. 2015. “Cross-sectional analysis of critical risk factors for PPP water projects in China.” J. Infrastruct. Syst. 21 (1): 04014031. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000214.
Chan, A. P. C., and E. K. Owusu. 2017. “Corruption forms in the construction industry: Literature review.” J. Constr. Eng. Manage. 143 (8): 04017057. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001353.
Chang, T., B.-G. Hwang, X. Deng, and X. Zhao. 2018. “Identifying political risk management strategies in international construction projects.” Adv. Civ. Eng. 2018 (Jun): 1–11. https://doi.org/10.1155/2018/1016384.
Cheung, E., A. P. C. Chan, and S. Kajewski. 2012. “Factors contributing to successful public private partnership projects: Comparing Hong Kong with Australia and the United Kingdom.” J. Facil. Manage. 10 (1): 45–58. https://doi.org/10.1108/14725961211200397.
Cuervo-Cazurra, A., M. M. Maloney, and S. Manrakhan. 2007. “Causes of the difficulties in internationalization.” J. Int. Bus. Stud. 38 (5): 709–725. https://doi.org/10.1057/palgrave.jibs.8400295.
Demirel, H. Ç., L. Volker, W. Leendertse, and M. Hertogh. 2019. “Dealing with contract variations in PPPs: Social mechanisms and contract management in infrastructure projects.” J. Constr. Eng. Manage. 145 (11): 04019073. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001714.
Deng, X., S. P. Low, Q. Li, and X. Zhao. 2014. “Developing competitive advantages in political risk management for international construction enterprises.” J. Constr. Eng. Manage. 140 (9): 04014040. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000836.
Dille, T., and J. Söderlund. 2011. “Managing inter-institutional projects: The significance of isochronism, timing norms and temporal misfits.” Int. J. Project Manage. 29 (4): 480–490. https://doi.org/10.1016/j.ijproman.2011.02.007.
Duman, D. U., S. D. Green, and G. D. Larsen. 2019. “Historical narratives as strategic resources: Analysis of the Turkish international contracting sector.” Construct. Manage. Econ. 37 (7): 367–383. https://doi.org/10.1080/01446193.2018.1529416.
Dykes, B. J., C. E. Stevens, and N. Lahiri. 2020. “Foreignness in public–private partnerships: The case of project finance investments.” J. Int. Bus. Policy 3 (2): 183–197. https://doi.org/10.1057/s42214-020-00051-z.
Farla, K., D. de Crombrugghe, and B. Verspagen. 2016. “Institutions, foreign direct investment, and domestic investment: Crowding out or crowding in?” World Dev. 88 (Dec): 1–9. https://doi.org/10.1016/j.worlddev.2014.04.008.
Flyvbjerg, B. 2014. “What you should know about megaprojects and why: An overview.” Project Manage. J. 45 (2): 6–19. https://doi.org/10.1002/pmj.21409.
Foran, T., L. Kiik, S. Hatt, D. Fullbrook, A. Dawkins, S. Walker, and Y. Chen. 2017. “Large hydropower and legitimacy: A policy regime analysis, applied to Myanmar.” Energy Policy 110 (Nov): 619–630. https://doi.org/10.1016/j.enpol.2017.08.043.
Galilea, P., and F. Medda. 2010. “Does the political and economic context influence the success of a transport project? An analysis of transport public-private partnerships.” Res. Transp. Econ. 30 (1): 102–109. https://doi.org/10.1016/j.retrec.2010.10.011.
Grøgaard, B., H. L. Colman, and I. G. Stensaker. 2022. “Legitimizing, leveraging, and launching: Developing dynamic capabilities in the MNE.” J. Int. Bus. Stud. 53 (4): 636–656. https://doi.org/10.1057/s41267-019-00245-5.
Hennart, J.-F., T. Roehl, and M. Zeng. 2002. “Do exits proxy a liability of foreignness? The case of Japanese exits from the US.” J. Int. Manage. 8 (3): 241–264. https://doi.org/10.1016/S1075-4253(02)00065-0.
Hwang, B.-G., X. Zhao, and M. J. S. Gay. 2013. “Public private partnership projects in Singapore: Factors, critical risks and preferred risk allocation from the perspective of contractors.” Int. J. Project Manage. 31 (3): 424–433. https://doi.org/10.1016/j.ijproman.2012.08.003.
Javernick-Will, A. N., and W. R. Scott. 2010. “Who needs to know what? Institutional knowledge and global projects.” J. Constr. Eng. Manage. 136 (5): 546–557. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000035.
Jebelli, H., B. Choi, and S. Lee. 2019. “Application of wearable biosensors to construction sites. I: Assessing workers’ stress.” J. Constr. Eng. Manage. 145 (12): 04019079. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001729.
Jiang, Y., M. W. Peng, X. Yang, and C. C. Mutlu. 2015. “Privatization, governance, and survival: MNE investments in private participation projects in emerging economies.” J. World Bus. 50 (2): 294–301. https://doi.org/10.1016/j.jwb.2014.10.006.
Kaufmann, D., A. Kraay, and M. Mastruzzi. 2011. “The worldwide governance indicators: Methodology and analytical issues.” Hague J. Rule Law 3 (2): 220–246. https://doi.org/10.1017/S1876404511200046.
Ke, Y., S. Wang, A. P. C. Chan, and E. Cheung. 2011. “Understanding the risks in China’s PPP projects: Ranking of their probability and consequence.” Eng. Constr. Archit. Manage. 18 (5): 481–496. https://doi.org/10.1108/09699981111165176.
Lee, I. H., and A. M. Rugman. 2012. “Firm-specific advantages, inward FDI origins, and performance of multinational enterprises.” J. Int. Manage. 18 (2): 132–146. https://doi.org/10.1016/j.intman.2011.11.001.
Lin, Y.-H., Z. Qin, C. J. Kim, Y. Zhang, and N. Xia. 2022. “Dynamic capabilities, Eastern relationships, and competitive advantages: An empirical assessment of Chinese and South Korean international contractors.” Eng. Manage. J. 34 (4): 671–688. https://doi.org/10.1080/10429247.2021.2020580.
Ling, F. Y. Y. 2004. “How project managers can better control the performance of design-build projects.” Int. J. Project Manage. 22 (6): 477–488. https://doi.org/10.1016/j.ijproman.2003.09.003.
Liu, B., J. Li, D. Wang, H. Liu, G. Wu, and J. Yuan. 2022. “Public–private partnerships: A collaborative framework for ensuring project sustainable operations.” Eng. Constr. Archit. Manage. https://doi.org/10.1108/ECAM-12-2021-1124.
Liu, J., X. Zhao, and P. Yan. 2016. “Risk paths in international construction projects: Case study from Chinese contractors.” J. Constr. Eng. Manage. 142 (6): 05016002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001116.
Lu, Y., B. Liu, and Y. Li. 2021. “Collaboration networks and bidding competitiveness in megaprojects.” J. Manage. Eng. 37 (6): 04021064. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000961.
Ma, H., K. Lv, S. Zeng, H. Lin, and J. J. Shi. 2022. “Climbing the pyramid of megaproject social responsibility: Impacts of external stakeholders and project complexity.” J. Constr. Eng. Manage. 148 (11): 04022116. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002395.
Ma, H., S. Zeng, H. Lin, and R. Zeng. 2020. “Impact of public sector on sustainability of public–private partnership projects.” J. Constr. Eng. Manage. 146 (2): 04019104. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001750.
Mahalingam, A., and R. E. Levitt. 2007. “Institutional theory as a framework for analyzing conflicts on global projects.” J. Constr. Eng. Manage. 133 (7): 517–528. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:7(517).
Mallon, M. R., and S. Fainshmidt. 2017. “Assets of foreignness: A theoretical integration and agenda for future research.” J. Int. Manage. 23 (1): 43–55. https://doi.org/10.1016/j.intman.2016.08.001.
Meyer, K. E., C. Li, and A. P. J. Schotter. 2020. “Managing the MNE subsidiary: Advancing a multi-level and dynamic research agenda.” J. Int. Bus. Stud. 51 (4): 538–576. https://doi.org/10.1057/s41267-020-00318-w.
Newenham-Kahindi, A., and C. E. Stevens. 2018. “An institutional logics approach to liability of foreignness: The case of mining MNEs in Sub-Saharan Africa.” J. Int. Bus. Stud. 49 (7): 881–901. https://doi.org/10.1057/s41267-017-0111-y.
Nguyen, A., A. Mollik, and Y.-Y. Chih. 2018. “Managing critical risks affecting the financial viability of public–private partnership projects: Case study of toll road projects in Vietnam.” J. Constr. Eng. Manage. 144 (12): 05018014. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001571.
Orr, R. J., and W. R. Scott. 2008. “Institutional exceptions on global projects: A process model.” J. Int. Bus. Stud. 39 (4): 562–588. https://doi.org/10.1057/palgrave.jibs.8400370.
Panayides, P. M., F. Parola, and J. S. L. Lam. 2015. “The effect of institutional factors on public–private partnership success in ports.” Transp. Res. Part A Policy Pract. 71 (Jan): 110–127. https://doi.org/10.1016/j.tra.2014.11.006.
Phillips, N., T. B. Lawrence, and C. Hardy. 2004. “Discourse and institutions.” Acad. Manage. Rev. 29 (4): 635–652. https://doi.org/10.5465/amr.2004.14497617.
Pradhananga, P., M. ElZomor, and G. Santi Kasabdji. 2021. “Identifying the challenges to adopting robotics in the US construction industry.” J. Constr. Eng. Manage. 147 (5): 05021003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002007.
Qiu, Y., H. Chen, Z. Sheng, and S. Cheng. 2019. “Governance of institutional complexity in megaproject organizations.” Int. J. Project Manage. 37 (3): 425–443. https://doi.org/10.1016/j.ijproman.2019.02.001.
Rebeiz, K. S. 2012. “Public–private partnership risk factors in emerging countries: BOOT illustrative case study.” J. Manage. Eng. 28 (4): 421–428. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000079.
Regnér, P., and J. Edman. 2014. “MNE institutional advantage: How subunits shape, transpose and evade host country institutions.” J. Int. Bus. Stud. 45 (3): 275–302. https://doi.org/10.1057/jibs.2013.66.
Robert, O.-K., and A. Chan. 2015. “Review of studies on the critical success factors for public–private partnership (PPP) projects from 1990 to 2013.” Int. J. Project Manage. 33 (6): 1335–1346. https://doi.org/10.1016/j.ijproman.2015.02.008.
Shi, Q., X. Chen, C. Xiao, and Y. Han. 2022. “Network perspective in megaproject management: A systematic review.” J. Constr. Eng. Manage. 148 (7): 03122002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002304.
Shrestha, A., T.-K. Chan, A. A. Aibinu, C. Chen, and I. Martek. 2018. “Risk allocation inefficiencies in Chinese PPP water projects.” J. Constr. Eng. Manage. 144 (4): 04018013. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001457.
Söderlund, J., and J. Sydow. 2019. “Projects and institutions: Towards understanding their mutual constitution and dynamics.” Int. J. Project Manage. 37 (2): 259–268. https://doi.org/10.1016/j.ijproman.2019.01.001.
Song, J., Y. Hu, and Z. Feng. 2018. “Factors influencing early termination of PPP projects in China.” J. Manage. Eng. 34 (1): 05017008. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000572.
Sun, P., K. Mellahi, and E. Thun. 2010. “The dynamic value of MNE political embeddedness: The case of the Chinese automobile industry.” J. Int. Bus. Stud. 41 (7): 1161–1182. https://doi.org/10.1057/jibs.2009.94.
Swanson, R., and V. Sakhrani. 2020. “Appropriating the value of flexibility in PPP megaproject design.” J. Manage. Eng. 36 (5): 05020010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000770.
Tabish, S. Z. S., and K. N. Jha. 2012. “The impact of anti-corruption strategies on corruption free performance in public construction projects.” Construct. Manage. Econ. 30 (1): 21–35. https://doi.org/10.1080/01446193.2011.654128.
Tashman, P., V. Marano, and T. Kostova. 2019. “Walking the walk or talking the talk? Corporate social responsibility decoupling in emerging market multinationals.” J. Int. Bus. Stud. 50 (2): 153–171. https://doi.org/10.1057/s41267-018-0171-7.
Wang, H., Y. Liu, W. Xiong, and J. Song. 2019. “The moderating role of governance environment on the relationship between risk allocation and private investment in PPP markets: Evidence from developing countries.” Int. J. Project Manage. 37 (1): 117–130. https://doi.org/10.1016/j.ijproman.2018.10.008.
Watt, D. J., B. Kayis, and K. Willey. 2010. “The relative importance of tender evaluation and contractor selection criteria.” Int. J. Project Manage. 28 (1): 51–60. https://doi.org/10.1016/j.ijproman.2009.04.003.
World Bank. 2020. Private participation in infrastructure (PPI) 2020 annual report. Washington, DC: World Bank.
Wu, C., X. Song, T. Wang, and D. Fang. 2015. “Core dimensions of the construction safety climate for a standardized safety-climate measurement.” J. Constr. Eng. Manage. 141 (8): 04015018. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000996.
Xia, J., X. Ma, J. W. Lu, and D. W. Yiu. 2014. “Outward foreign direct investment by emerging market firms: A resource dependence logic.” Strategic Manage. J. 35 (9): 1343–1363. https://doi.org/10.1002/smj.2157.
Xie, L., Y. Hu, B. Zhang, B. Xia, M. Skitmore, and X. Gao. 2019. “Accountability effects of public participation practice in Chinese public projects: Partial least-squares path analysis.” J. Manage. Eng. 35 (6): 05019008. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000716.
Xiong, W., and Y. Han. 2021. “Incentives of early termination compensation in public–private partnership projects.” IEEE Trans. Eng. Manage. 70 (6): 2220–2232. https://doi.org/10.1109/TEM.2021.3074662.
Zeng, S., H. Chen, H. Ma, and J. J. Shi. 2022. “Governance of social responsibility in international infrastructure megaprojects.” Front. Eng. Manage. 9 (2): 343–348. https://doi.org/10.1007/s42524-022-0191-7.
Zhang, S., S. Zhang, Y. Gao, and X. Ding. 2016. “Contractual governance: Effects of risk allocation on contractors’ cooperative behavior in construction projects.” J. Constr. Eng. Manage. 142 (6): 04016005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001111.
Zhang, X., and S. Tariq. 2020. “Failure mechanisms in international water PPP projects: A public sector perspective.” J. Constr. Eng. Manage. 146 (6): 04020055. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001837.
Zhao, W., L. Wang, X. Ning, L. Ju, and Y. Mu. 2022. “The moderating role of corruption in the inverted U-shaped relationship between red tape and private investment in PPP projects: Evidence from developing countries.” IEEE Trans. Eng. Manage. 69 (5): 2361–2373. https://doi.org/10.1109/TEM.2020.3013381.
Zhou, Y., L. Hou, Y. Yang, H.-Y. Chong, and S. Moon. 2019. “A comparative review and framework development on public participation for decision-making in Chinese public projects.” Environ. Impact Assess. Rev. 75 (Mar): 79–87. https://doi.org/10.1016/j.eiar.2018.12.006.
Information & Authors
Information
Published In
Copyright
© 2023 American Society of Civil Engineers.
History
Received: Nov 22, 2022
Accepted: May 15, 2023
Published online: Jul 7, 2023
Published in print: Sep 1, 2023
Discussion open until: Dec 7, 2023
ASCE Technical Topics:
- Business management
- Computing in civil engineering
- Construction engineering
- Construction management
- Databases
- Developing countries
- Engineering fundamentals
- Information Technology (IT)
- Legal affairs
- Liability
- Methodology (by type)
- Mitigation and remediation
- Practice and Profession
- Project management
- Public private partnership
- Research methods (by type)
- Verification
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.