Abstract
This paper presents the development of a novel multiobjective model for optimizing the planning of airport airside expansion projects that provides the capability of minimizing both airport operations disruption cost and total construction cost. The model computations are performed in four main modules: (1) a simulation module that calculates and quantifies the impact of airport construction activities on airport operations, (2) a multiobjective genetic algorithms optimization module that identifies an optimal schedule for airport airside expansion projects, (3) a scheduling module that calculates the start and finish times of each construction activity, and (4) a cost module that computes the total cost of construction-related disruptions in airport operations and the total construction cost. A real-life case study of an airport airside expansion project is analyzed to illustrate the use of the model and highlight its original contributions to the body of knowledge including its novel methodologies for (1) quantifying and minimizing the impact of construction activities on airport operations, (2) analyzing and minimizing the impact of air traffic data and airport operations on total construction cost, and (3) generating a set of optimal construction plans including optimal project start time, activities start time, and weekly and daily work plans for all activities. The results of the case study clearly illustrate the original contributions of the developed model and its novel capabilities that are expected to support airport and construction planners in their efforts to improve the cost-effectiveness and functional performance of airports during airside expansion projects.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.
Acknowledgments
The authors gratefully acknowledge ATAC Corportation and its Director of Simmod Programs for their effort and support in facilitating the use of the air traffic simulation tool “Simmod Pro!” Any opinions, findings, and conclusions or recommendations expressed in this publication are those of the authors and do not necessarily reflect the views of ATAC Corportation.
References
Abdallah, M., and K. El-Rayes. 2016. “Multiobjective optimization model for maximizing sustainability of existing buildings.” J. Manage. Eng. 32 (4): 04016003. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000425.
ACI-NA (Airport Council International-North America). 2021. “Building the runway to economic growth.” Accessed November 17, 2021. https://airportscouncil.org/wp-content/uploads/2021/03/2021ACINAInfrastructureNeedsStudy.pdf.
Alnasseri, N., A. Osborne, and G. Steel. 2013. “Managing and controlling airport construction projects: A strategic management framework for operators.” J. Adv. Manage. Sci. 1 (3): 317–320. https://doi.org/10.12720/joams.1.3.317-320.
AlOtaibi, M., K. El-Rayes, and A. Altuwaim. 2021. “Optimizing the renovation scheduling of leased residential buildings to minimize total project cost.” J. Constr. Eng. Manage. 147 (7): 04021074. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002063.
Altuwaim, A., and K. El-Rayes. 2021. “Multiobjective optimization model for planning repetitive construction projects.” J. Constr. Eng. Manage. 147 (7): 04021072. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002072.
ASCE. 2021. “2021 infrastructure report card.” Accessed November 20, 2021. https://infrastructurereportcard.org/wp-content/uploads/2020/12/Aviation-2021.pdf.
ATAC (Airborne Tactical Advantage Company). 2021. “Simmod PRO!” ATAC Corporation. Accessed June 22, 2022. https://www.atac.com/simmod-pro/.
BTS (Bureau of Transportation Statistics). 2021. “Number of U.S. airports.” US DOT. Accessed January 8, 2022. https://www.bts.gov/content/number-us-airportsa.
Deb, K., A. Pratap, S. Agarwal, and T. Meyarivan. 2002. “A fast and elitist multiobjective genetic algorithm: NSGA-II.” IEEE Trans. Evol. Comput. 6 (2): 182–197. https://doi.org/10.1109/4235.996017.
Delatte, N. 2006. Concrete pavement design, construction, and performance. 1st ed. London: CRC Press. https://doi.org/10.1201/9781482288483.
El-Rayes, K., and D. H. Jun. 2009. “Optimizing resource leveling in construction projects.” J. Constr. Eng. Manage. 135 (11): 1172–1180. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000097.
FAA (Federal Aviation Administration). 2004. “Capability assessment of various fast-time simulation models and tools with analysis concerns.” Accessed September 28, 2022. https://www.tc.faa.gov/acb300/ap5_workshops/documents/AP9_MS_TIM_Paper_Final_101504.pdf.
FAA (Federal Aviation Administration). 2017. “Operational safety on airports during construction.” Accessed December 17, 2021. https://www.faa.gov/documentLibrary/media/Advisory_Circular/150-5370-2G.pdf.
FAA (Federal Aviation Administration). 2019a. “Aircraft type designators.” Accessed September 16, 2022. https://www.faa.gov/documentLibrary/media/Order/2019-10-10_Order_JO_7360.1E_Aircraft_Type_Designators_FINAL.pdf.
FAA (Federal Aviation Administration). 2019b. “Cost of delay estimates.” Accessed September 19, 2022. https://www.faa.gov/data_research/aviation_data_statistics/media/cost_delay_estimates.pdf.
FAA (Federal Aviation Administration). 2020a. “FAA national plan of integrated airport systems (NPIAS) 2021-2025.” Accessed January 8, 2022. https://www.faa.gov/airports/planning_capacity/npias/current/media/NPIAS-2021-2025-Narrative.pdf.
FAA (Federal Aviation Administration). 2020b. “Facts about the FAA and air traffic control.” Accessed January 17, 2022. https://www.faa.gov/newsroom/facts-about-faa-and-air-traffic-control.
FAA (Federal Aviation Administration). 2021a. “Air traffic by the numbers.” Accessed September 1, 2021. https://www.faa.gov/air_traffic/by_the_numbers/.
FAA (Federal Aviation Administration). 2021b. “Airport improvement program handbook.” Accessed October 1, 2022. https://www.faa.gov/airports/aip/aip_handbook/media/AIP-Handbook-Order-5100-38D-Chg1.pdf.
FAA (Federal Aviation Administration). 2022a. “Q1-2022 airport construction impact report.” Accessed February 10, 2022. https://www.faa.gov/sites/faa.gov/files/2022-01/Q1_2022_508_Airport_Construction_Impact_Report.pdf.
FAA (Federal Aviation Administration). 2022b. “Weather delay.” Accessed September 12, 2022. https://www.faa.gov/nextgen/programs/weather/faq.
Fortin, F.-A., F.-M. D. Rainville, M.-A. Gardner, M. Parizeau, and C. Gagné. 2012. “DEAP: Evolutionary algorithms made easy.” J. Mach. Learn. Res. 13 (70): 2171–2175.
Hegazy, T., and N. Wassef. 2001. “Cost optimization in projects with repetitive nonserial activities.” J. Constr. Eng. Manage. 127 (3): 183–191. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(183).
Hubbard, S., B. Hubbard, and J. Sobieralski. 2021. “Minimizing the negative impacts of airport construction.” In Proc., 51st Int. Symp. on Aviation Psychology, 352–357. Dayton, OH: Wright State Univ. Conferences and Events.
Jun, D. H., and K. El-Rayes. 2010. “Optimizing the utilization of multiple labor shifts in construction projects.” Autom. Constr. 19 (2): 109–119. https://doi.org/10.1016/j.autcon.2009.12.015.
Khalafallah, A., and K. El-Rayes. 2006a. “Minimizing construction-related hazards in airport expansion projects.” J. Constr. Eng. Manage. 132 (6): 562–572. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(562).
Khalafallah, A., and K. El-Rayes. 2006b. “Optimizing airport construction site layouts to minimize wildlife hazards.” J. Manage. Eng. 22 (4): 176–185. https://doi.org/10.1061/(ASCE)0742-597X(2006)22:4(176).
Khalafallah, A., and K. El-Rayes. 2008. “Minimizing construction-related security risks during airport expansion projects.” J. Constr. Eng. Manage. 134 (1): 40–48. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(40).
Kitchens, M. 1996. Estimating and project management for building contractors. Reston, VA: ASCE.
Long, L. D., and A. Ohsato. 2009. “A genetic algorithm-based method for scheduling repetitive construction projects.” Autom. Constr. 18 (4): 499–511. https://doi.org/10.1016/j.autcon.2008.11.005.
Oakland International Airport. 2006. “Simmod simulation airfield and airspace simulation report.” Master Plan Preparation Report. Accessed September 26, 2022. https://www.oaklandairport.com/wp-content/uploads/2016/05/appendix_I.pdf.
RSMeans. 2020. Heavy construction cost with RSMeans data. Rockland, MA: Gordian RSMeans Data.
Said, H., and K. El-Rayes. 2012. Optimal material logistics planning in congested construction sites, 1580–1589. Reston, VA: ASCE. https://doi.org/10.1061/9780784412329.159.
San Diego County Regional Airport Authority. 2021. “th11a-6-2021—report—exhibit 1.” California Coastal Commission. Accessed November 22, 2021. https://documents.coastal.ca.gov/reports/2021/6/th11a/th11a-6-2021-exhibits.pdf.
Shami, M., and A. Kanafani. 1997. “Coping with construction in operational airports: Sfia case study.” J. Transp. Eng. 123 (6): 417–428. https://doi.org/10.1061/(ASCE)0733-947X(1997)123:6(417).
Siewart, D., and G. Le Bris. 2015. “Safety of runway operations during construction works.” Transportation Research Board. Accessed October 21, 2021. https://onlinepubs.trb.org/Onlinepubs/webinars/151130.pdf.
Siow, B. T., O. Kivanc, G. Bender, R. Evlioglu, and C. Tunasar. 2002. Managing airport traffic disruptions during construction, 1–15. Reston, VA: ASCE. https://doi.org/10.1061/40646(2003)21.
Stewart, C. 2001. Airfield safety: Developing operational procedures and schedules for airside construction projects, 309–321. Reston, VA: ASCE. https://doi.org/10.1061/40579(271)26.
vanRossum, G. 2017. “The Python Language reference.” Accessed March 9, 2022. https://scicomp.ethz.ch/public/manual/Python/3.6.0/reference.pdf.
Information & Authors
Information
Published In
Copyright
© 2023 American Society of Civil Engineers.
History
Received: Jul 5, 2022
Accepted: Dec 9, 2022
Published online: Feb 9, 2023
Published in print: Apr 1, 2023
Discussion open until: Jul 9, 2023
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.