Research Article
Mar 1971

Optimum Replacement Life of Large Scrapers

This article has a reply.
VIEW THE REPLY
This article has a reply.
VIEW THE REPLY
Publication: Journal of the Construction Division
Volume 97, Issue 1

Abstract

Data for a fleet of scrapers was collected from a highway contractor. This data was then analyzed using a modified version of the Douglas model of equipment life to determine the optimum equipment life in terms of present worth of profits. Application of the model indicated an optimum life (i.e., the point in time when the present worth of profits is maximized) of 2 years. This was much shorter than the accepted replacement cycle of the general contractor studies. It is clear that when such factors as the time value of money, obsolescence, tax effects, inflation, the cost of borrowed money, expected technological improvements in future machines, expected increased costs of future machines, the effect of maintenance and operating costs, and utilization are considered over the life of an equipment spread, the time to replace a given piece of equipment is much shorter than might be intuitively expected. When the total economic picture of machine life and utilization is considered, early replacement (after about 2 years' use) results in significantly profits to the contractor from his scraper fleet.

Get full access to this article

View all available purchase options and get full access to this article.

Information & Authors

Information

Published In

Journal of the Construction Division
Volume 97Issue 1March 1971
Pages: 37 - 52

History

Published in print: Mar 1971
Published online: Feb 11, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

Charles R. Schrader, AM.ASCE
Constr. Methods Engr. Proj.-Constr. Dept., Engrg. Div., The Proctor and Gamble Co., Cincinnati, Oh.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share