Research Article
Mar 1967
Construction of Morrow Point Power Plant and Dam
Publication: Journal of the Construction Division
Volume 93, Issue 1
Abstract
Construction of the Morrow Point double-curvature thin-arch concrete dam and underground power plant is in progress in the rugged Black Canyon of the Gunnison River. Rock excavations, open cut and underground, require extensive stabilization. Periphery smooth wall blasting techniques result in more uniform and stable open cut rock slopes and reduce overbreak. Alinement symmetry and configuration of underground excavations are greatly improved. There was teamwork between the engineer and the geologist employed to analyze and prescribe drilling and blasting patterns in alternating lenticular and irregular beds of rock of varying hardness and strength. Rock bolts were used extensively in open cuts and as a means of roof supports in underground excavations. In the crown of the power plant chamber, no rock was left unsupported longer than 12 hr after blasting. Proper instrumentation provides essential information concerning movement and reactions in the rock in the underground excavations. Gain in tension of rock bolts is recorded by strain-meters. Borehole extensometers are monitoring rock movements. The dam concrete was designed for a compressive strain of 4,500 psi at the end of 1 yr.
Get full access to this article
View all available purchase options and get full access to this article.
Information & Authors
Information
Published In
Journal of the Construction Division
Volume 93 • Issue 1 • March 1967
Pages: 47 - 58
Copyright
© 1967 American Society of Civil Engineers.
History
Published in print: Mar 1967
Published online: Feb 11, 2021
Permissions
Request permissions for this article.
Authors
Affiliations
James D. Seery, M.ASCE
Proj. Engr., Curecanti Unit, Colorado River Storage Proj., Bur. of Reclam., U.S. Dept. of the Interior, Montrose, Colo.
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
View Options
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.