Managing Cost Risks in Oil and Gas Construction Projects: Root Causes of Cost Overruns

Publication: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
Volume 8, Issue 1

Abstract

This study identifies and classifies the root causes (i.e., the primary precursors) of cost overruns in oil and gas construction projects. Past studies generally focused on identifying the most immediate precursors of cost overruns and failed to address the need to identify their root causes. Specific root causes are inherent in projects with certain characteristics (e.g., projects in a particular domain or sector). Accordingly, research is needed to identify various cost overrun factors and their root causes in a context-specific manner. This study used content analysis to identify 38 recurrent cost overrun factors and 11 root causes in oil and gas construction projects. The cost overrun factors were classified based on their common root causes. The Delphi method was used to verify this classification. The evidence from 12 construction projects in the oil and gas sector that had faced cost overruns was used to verify the outcome of this study. The findings of the study will assist practitioners in mitigating the risk of cost overruns in oil and gas projects and meeting their budget goals.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abdul-Malak, M. A. U., M. M. El-Saadi, and M. G. Abou-Zeid. 2002. “Process model for administrating construction claims.” J. Manage. Eng. 18 (2): 84–94. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:2(84).
Agumba, J., and I. Musonda. 2013. “Experience of using Delphi method in construction health and safety research.” In Proc., 7th Int. Conf. on Construction in the 21st Century (CITC-VII). Pathum Thani, Thailand: Asian Institute of Technology.
Ahiaga-Dagbui, D. D., and S. D. Smith. 2014. “Rethinking construction cost overruns: Cognition, learning and estimation.” J. Fin. Manage. Property Constr. 19 (1): 38–54. https://doi.org/10.1108/JFMPC-06-2013-0027.
Alaghbari, W. E., M. R. A. Kadir, and A. Salim. 2007. “The significant factors causing delay of building construction projects in Malaysia.” Eng., Constr. Archit. Manage. 14 (2): 192–206. https://doi.org/10.1108/09699980710731308.
Annamalaisami, C. D., and A. Kuppuswamy. 2019. “Reckoning construction cost overruns in building projects through methodological consequences.” Int. J. Constr. Manage. 1–11. https://doi.org/10.1080/15623599.2019.1683689.
Annamalaisami, C. D., and A. Kuppuswamy. 2021. “Managing cost risks: Toward a taxonomy of cost overrun factors in building construction projects.” ASCE-ASME J. Risk Uncertainty Eng. Syst., Part A: Civ. Eng. 7 (2): 04021021. https://doi.org/10.1061/AJRUA6.0001132.
Arditi, D., G. T. Akan, and S. Gurdamar. 1985. “Cost overruns in public projects.” Int. J. Project Manage. 3 (4): 218–224.
Assaf, S. A., M. Al-Khalil, and M. Al-Hazmi. 1995. “Causes of delay in large building construction projects.” J. Manage. Eng. 11 (2): 45–50. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(45).
Azhar, N., R. U. Farooqui, and S. M. Ahmed. 2008. “Cost overrun factors in construction industry of Pakistan.” In Proc., 1st Int. Conf. on Construction in Developing Countries (ICCIDC–I), Advancing and Integrating Construction Education, Research & Practice, 499–508. Karachi, Pakistan: NED Univ. of Engineering and Technology.
Azhar, S., I. Ahmad, and M. K. Sein. 2010. “Action research as a proactive research method for construction engineering and management.” J. Constr. Eng. Manage. 136 (1): 87–98. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000081.
Begum, R. A., C. Siwar, J. J. Pereira, and A. H. Jaafar. 2009. “Attitude and behavioral factors in waste management in the construction industry of Malaysia.” Resour. Conserv. Recycl. 53 (6): 321–328. https://doi.org/10.1016/j.resconrec.2009.01.005.
Bergli, S., and K. Falk. 2017. “Cause and impact analysis of cost and schedule overruns in subsea oil and gas projects—A supplier’s perspective.” In Vol. 27 of Proc., INCOSE Int. Symp., 309–321. New York: Wiley.
Best, R. J. 1974. “An experiment in Delphi estimation in marketing decision making.” J. Marketing Res. 11 (4): 448–452. https://doi.org/10.2307/3151295.
Bishop, J. 1977. “The effect of public policies on the demand for higher education.” J. Hum. Resour. 12 (3): 285–307. https://doi.org/10.2307/145492.
Bordat, C., B. G. McCullouch, S. Labi, and K. C. Sinha. 2004. An analysis of cost overruns and time delays of INDOT projects. West Lafayette, IN: Indiana DOT, Purdue Univ.
Cabrera, A. F. 1994. “Logistic regression analysis in higher education: An applied perspective.” In Vol. 10 of Higher education: Handbook of theory and research, 225–256. Dordrecht, Netherlands: Springer.
Cantarelli, C. C., B. Flyvbjerg, E. J. E. Molin, and B. van Wee. 2010. “Cost overruns in large-scale transportation infrastructure projects: Explanations and their theoretical embeddedness.” Eur. J. Transp. Infrastruct. Res. 10 (1): 5–18. https://doi.org/10.18757/ejtir.2010.10.1.2864.
Carbonara, N., N. Costantino, L. Gunnigan, and R. Pellegrino. 2014. “Risk management in PPP projects: An empirical study on the motorway sector.” In Proc., POMS Conf., 9–12. Miami, FL: Production and Operations Management Society. https://www.pomsmeetings.org/confpapers/051/051-1250.pdf.
Chan, A. P. C., E. H. K. Yung, P. T. I. Lam, C. M. Tam, and S. O. Cheung. 2001. “Application of Delphi method in selection of procurement systems for construction projects.” Constr. Manage. Econ. 19 (7): 699–718. https://doi.org/10.1080/01446190110066128.
Chan, D. W., and M. M. Kumaraswamy. 1997. “A comparative study of causes of time overruns in Hong Kong construction projects.” Int. J. Project Manage. 15 (1): 55–63. https://doi.org/10.1016/S0263-7863(96)00039-7.
Cheng, Y.-M. 2014. “An exploration into cost-influencing factors on construction projects.” Int. J. Project Manage. 32 (5): 850–860. https://doi.org/10.1016/j.ijproman.2013.10.003.
Derakhshanalavijeh, R., and J. M. C. Teixeira. 2017. “Cost overrun in construction projects in developing countries, gas-oil industry of Iran as a case study.” J. Civ. Eng. Manage. 23 (1): 125–136. https://doi.org/10.3846/13923730.2014.992467.
Diekmann, J. E., and M. C. Nelson. 1985. “Construction claims: Frequency and severity.” J. Constr. Eng. Manage. 111 (1): 74–81. https://doi.org/10.1061/(ASCE)0733-9364(1985)111:1(74).
Dlakwa, M., and M. Culpin. 1990. “Reasons for overrun in public sector construction projects in Nigeria.” Int. J. Project Manage. 8 (4): 237–241. https://doi.org/10.1016/0263-7863(90)90032-7.
Ernst and Young. 2014. Spotlight on oil and gas megaprojects. London: Ernst and Young.
Flores, A. C., S. Marshall, and M. Cordina. 2014. “Use of the Delphi technique to determine safety features to be included in a neonatal and paediatric prescription chart.” Int. J. Clin. Pharm. 36 (6): 1179–1189. https://doi.org/10.1007/s11096-014-0014-y.
Flyvbjerg, B., M. S. Holm, and S. Buhl. 2002. “Underestimating costs in public works projects: Error or lie?” J. Am. Plann. Assoc. 68 (3): 279–295. https://doi.org/10.1080/01944360208976273.
Flyvbjerg, B., M. K. Skamris Holm, and S. L. Buhl. 2004. “What causes cost overrun in transport infrastructure projects?” Transp. Rev. 24 (1): 3–18. https://doi.org/10.1080/0144164032000080494a.
Forsythe, E., L. B. Kahn, F. Lange, and D. Wiczer. 2020. “Labor demand in the time of COVID-19: Evidence from vacancy postings and UI claims.” J. Public Econ. 189 (Sep): 104238. https://doi.org/10.1016/j.jpubeco.2020.104238.
Franz, B., K. R. Molenaar, and B. A. M. Roberts. 2020. “Revisiting project delivery system performance from 1998 to 2018.” J. Constr. Eng. Manage. 146 (9): 04020100. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001896.
Frew, E., and K. Breheny. 2019. “Methods for public health economic evaluation: A Delphi survey of decision makers in English and Welsh local government.” Health Econ. 28 (8): 1052–1063. https://doi.org/10.1002/hec.3916.
Gibson, G. E., and D. A. Whittington. 2010. “Charrettes as a method for engaging industry in best practices research.” J. Constr. Eng. Manage. 136 (1): 66–75. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000079.
Green, S. D., C.-C. Kao, and G. D. Larsen. 2010. “Contextualist research: Iterating between methods while following an empirically grounded approach.” J. Constr. Eng. Manage. 136 (1): 117–126. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000027.
Hallowell, M. R., and J. A. Gambatese. 2009. “Qualitative research: Application of the Delphi method to CEM research.” J. Constr. Eng. Manage. 136 (1): 99–107. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000137.
Huo, T., H. Ren, W. Cai, G. Q. Shen, B. Liu, M. Zhu, and H. Wu. 2018. “Measurement and dependence analysis of cost overruns in mega transport infrastructure projects: Case study in Hong Kong.” J. Constr. Eng. Manage. 144 (3): 05018001. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001444.
Janik, J., and H. M. Kravitz. 1994. “Linking work and domestic problems with police suicide.” Suicide Life-Threatening Behav. 24 (3): 267–274. https://doi.org/10.1111/j.1943-278X.1994.tb00751.x.
Johnson, R. M., and R. I. I. Babu. 2020. “Time and cost overruns in the UAE construction industry: A critical analysis.” Int. J. Constr. Manage. 20 (5): 402–411. https://doi.org/10.1080/15623599.2018.1484864.
Kaliba, C., M. Muya, and K. Mumba. 2009. “Cost escalation and schedule delays in road construction projects in Zambia.” Int. J. Project Manage. 27 (5): 522–531. https://doi.org/10.1016/j.ijproman.2008.07.003.
Koushki, P., K. Al-Rashid, and N. Kartam. 2005. “Delays and cost increases in the construction of private residential projects in Kuwait.” Construct. Manage. Econ. 23 (3): 285–294. https://doi.org/10.1080/0144619042000326710.
Landeta, J. 2006. “Current validity of the Delphi method in social sciences.” Technol. Forecast. Soc. Change 73 (5): 467–482. https://doi.org/10.1016/j.techfore.2005.09.002.
Larsen, J. K., G. Q. Shen, S. M. Lindhard, and T. D. Brunoe. 2015. “Factors affecting schedule delay, cost overrun, and quality level in public construction projects.” J. Manage. Eng. 32 (1): 04015032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000391.
Le-Hoai, L., Y. Dai Lee, and J. Y. Lee. 2008. “Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries.” KSCE J. Civ. Eng. 12 (6): 367–377. https://doi.org/10.1007/s12205-008-0367-7.
Long, N. D., S. Ogunlana, T. Quang, and K. C. Lam. 2004. “Large construction projects in developing countries: A case study from Vietnam.” Int. J. Project Manage. 22 (7): 553–561. https://doi.org/10.1016/j.ijproman.2004.03.004.
Love, P. E., J. Smith, I. Simpson, M. Regan, and O. Olatunji. 2015. “Understanding the landscape of overruns in transport infrastructure projects.” Environ. Plann. B: Plann. Des. 42 (3): 490–509. https://doi.org/10.1068/b130102p.
Luzon, B., and S. M. El-Sayegh. 2016. “Evaluating supplier selection criteria for oil and gas projects in the UAE using AHP and Delphi.” Int. J. Constr. Manage. 16 (2): 175–183. https://doi.org/10.1080/15623599.2016.1146112.
Mahamid, I., and N. Dmaidi. 2013. “Risks leading to cost overrun in building construction from consultants’ perspective.” Organ. Technol. Manage. Constr. Int. J. 5 (2): 860–873. https://doi.org/10.5592/otmcj.2013.2.5.
Manoliadis, O., I. Tsolas, and A. Nakou. 2006. “Sustainable construction and drivers of change in Greece: A Delphi study.” Construct. Manage. Econ. 24 (2): 113–120. https://doi.org/10.1080/01446190500204804.
Mansfield, N. R., O. Ugwu, and T. Doran. 1994. “Causes of delay and cost overruns in Nigerian construction projects.” Int. J. Project Manage. 12 (4): 254–260. https://doi.org/10.1016/0263-7863(94)90050-7.
Memon, A. H., I. A. Rahman, and A. A. A. Azis. 2011. “Preliminary study on causative factors leading to construction cost overrun.” Int. J. Sustainable Constr. Eng. Technol. 2 (1): 57–71.
Memon, A. H., I. A. Rahman, andA. A. A. Azis. 2012. “Time and cost performance in construction projects in southern and central regions of Peninsular Malaysia.” Int. J. Adv. Appl. Sci. 1 (1): 45–52.
Merrow, E. W. 2012. “Oil and gas industry megaprojects: Our recent track record.” Oil Gas Facil. 1 (2): 38–42. https://doi.org/10.2118/153695-PA.
Mitzman, J., A. M. King, R. K. Fastle, L. R. Hopson, J. D. Hoyle, K. A. Levasseur, M. S. Mitchell, J. C. O’Neill, P. A. Pazderka, and M. A. Perry. 2017. “A modified Delphi Study for development of a pediatric curriculum for emergency medicine residents.” AEM Educ. Train. 1 (2): 140–150. https://doi.org/10.1002/aet2.10021.
Odeck, J. 2004. “Cost overruns in road construction—What are their sizes and determinants?” Transp. Policy 11 (1): 43–53. https://doi.org/10.1016/S0967-070X(03)00017-9.
Odeh, A. M., and H. T. Battaineh. 2002. “Causes of construction delay: Traditional contracts.” Int. J. Project Manage. 20 (1): 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5.
Olaniran, O. J., P. E. Love, D. Edwards, O. A. Olatunji, and J. Matthews. 2015. “Cost overruns in hydrocarbon megaprojects: A critical review and implications for research.” Project Manage. J. 46 (6): 126–138. https://doi.org/10.1002/pmj.21556.
PDSPC (President’s Deputy of Strategic Planning and Control). 2011. Report on the big national construction projects status [In Farsi.]. Tehran, Iran: Statistical Center of Iran.
Peng, C.-Y. J., K. L. Lee, and G. M. Ingersoll. 2002. “An introduction to logistic regression analysis and reporting.” J. Educ. Res. 96 (1): 3–14. https://doi.org/10.1080/00220670209598786.
Perera, B. A. K. S., M. K. C. S. Wijewickrama, W. R. S. C. Ranaweera, and I. S. W. Gamage. 2021. “Significant factors influencing the bid mark-up decision of infrastructure projects in Sri Lanka.” Int. J. Constr. Manage. 21 (8): 769–783. https://doi.org/10.1080/15623599.2019.1583849.
Phillips, A. C., L. K. Lewis, M. P. McEvoy, J. Galipeau, P. Glasziou, M. Hammick, D. Moher, J. K. Tilson, and M. T. Williams. 2014. “A Delphi survey to determine how educational interventions for evidence-based practice should be reported: Stage 2 of the development of a reporting guideline.” BMC Med. Educ. 14 (1): 159. https://doi.org/10.1186/1472-6920-14-159.
Plaza, V., M. Calle, J. Molina, S. Quirce, J. Sanchis, J. L. Viejo, and F. Caballero. 2012. “External validation of the recommendations of the multidisciplinary consensus about inhaled therapies.” Archivos Bronconeumología 48 (6): 189–196. https://doi.org/10.1016/j.arbr.2012.03.007.
PMI-KPMG. 2013. “Study on project schedule and cost overruns.” Accessed April 10, 2021. https://www.pmi.org.in//pdfs/white_paper/PMI_WhitePaper__301120171237_study-on-project-schedule-and-cost.pdf.
Rosenfeld, Y. 2014. “Root-cause analysis of construction-cost overruns.” J. Constr. Eng. Manage. 140 (1): 04013039. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000789.
Rosenfeld, Y., and S. Iuclea. 2011. Root causes for cost overrun in construction.. Haifa, Israel: National Building Research Institute, Technion-Israel Institute of Technology.
Rowe, G., and G. Wright. 1999. “The Delphi technique as a forecasting tool: Issues and analysis.” Int. J. Forecast. 15 (4): 353–375. https://doi.org/10.1016/S0169-2070(99)00018-7.
Rui, Z., F. Peng, K. Ling, H. Chang, G. Chen, and X. Zhou. 2017. “Investigation into the performance of oil and gas projects.” J. Nat. Gas Sci. Eng. 38: 12–20.
Sarakbi, R. 2019. Root cause analysis of cost overrun in construction projects under different market sectors. Long Beach, CA: California State Univ. Long Beach.
Scholl, W., C. König, B. Meyer, and P. Heisig. 2004. “The future of knowledge management: An international Delphi study.” J. Knowl. Manage. 8 (2): 19–35. https://doi.org/10.1108/13673270410529082.
Siemiatycki, M. 2015. Cost overruns on infrastructure projects: Patterns, causes and cures. Toronto: Institute on Municipal Finance & Governance, Univ. of Toronto.
Simushi, S., and J. Wium. 2020. “Time and cost overruns on large projects: Understanding the root cause.” J. Constr. Dev. Countries 25 (1): 129–146. https://doi.org/10.21315/jcdc2020.25.1.7.
Taylor, R. M., R. G. Feltbower, N. Aslam, R. Raine, J. S. Whelan, and F. Gibson. 2016. “Modified international e-Delphi survey to define healthcare professional competencies for working with teenagers and young adults with cancer.” BMJ Open 6 (5): e011361. https://doi.org/10.1136/bmjopen-2016-011361.
Tolman, R. M., and A. Weisz. 1995. “Coordinated community intervention for domestic violence: The effects of arrest and prosecution on recidivism of woman abuse perpetrators.” Crime Delinquency 41 (4): 481–495. https://doi.org/10.1177/0011128795041004007.
Walsh, T., and L. Maher. 2020. COVID-19 causing US construction delays or cost overruns: How to spot and triage?, 14–18. London: Norton Rose Fulbright.
Williams, T. P., and J. Gong. 2014. “Predicting construction cost overruns using text mining, numerical data and ensemble classifiers.” Autom. Constr. 43 (Jul): 23–29. https://doi.org/10.1016/j.autcon.2014.02.014.
Wong, C. H. 2004. “Contractor performance prediction model for the United Kingdom construction contractor: Study of logistic regression approach.” J. Constr. Eng. Manage. 130 (5): 691–698. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(691).
Yeung, J. F., A. P. Chan, D. W. Chan, and L. K. Li. 2007. “Development of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study.” Construct. Manage. Econ. 25 (12): 1219–1237. https://doi.org/10.1080/01446190701598673.

Information & Authors

Information

Published In

Go to ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
Volume 8Issue 1March 2022

History

Received: May 23, 2021
Accepted: Aug 18, 2021
Published online: Oct 19, 2021
Published in print: Mar 1, 2022
Discussion open until: Mar 19, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

M.Sc. Graduate, Dept. of Civil Engineering, Sharif Univ. of Technology, Tehran 1458889694, Iran. ORCID: https://orcid.org/0000-0002-4819-0312. Email: [email protected]
Assistant Professor, Center for Infrastructure Sustainability and Resilience Research (INSURER), Dept. of Civil Engineering, Sharif Univ. of Technology, Tehran 1458889694, Iran (corresponding author). ORCID: https://orcid.org/0000-0003-2479-7387. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Review of studies on risk factors in critical infrastructure projects from 2011 to 2023, Smart and Sustainable Built Environment, 10.1108/SASBE-09-2023-0285, (2024).
  • A General Contractor’s Perspective on Construction Digital Twin: Implementation, Impacts and Challenges, Buildings, 10.3390/buildings13040978, 13, 4, (978), (2023).
  • Field Features Do Not Explain Greenfield Production Forecasting Bias, SPE Journal, 10.2118/212834-PA, 28, 03, (1290-1307), (2022).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share