Chapter
Aug 30, 2024

Pipe Bursting Proof of Use for Water Main Replacement: Insights from the Washington Suburban Sanitary Commission Water Pilot Project

ABSTRACT

The Washington Suburban Sanitary Commission (WSSC Water) selected the Lanham Station Road Water Main Replacement Project (Lanham Station or project), an approximately 3-mi upgrade, as a pioneering testbed for pipe bursting technology. Three construction techniques, such as pipe bursting, relocation, and re-lay (same trench replacement), were meticulously implemented for comparison. Different types [restrained joint and fusible polyvinyl chloride (PVC)] and sizes (6–12 in.) of C-900 PVC pipe were installed and evaluated during the pipe bursting process. With construction completed in 2020, the pilot project identified the pros and cons of pipe bursting compared to conventional open cut methods, evaluated the performance of select PVC products, and assessed the applicability of pipe bursting under differing site conditions. The project demonstrated the advantages of water main replacement using pipe bursting and highlighted challenges that require further examination. Ultimately, the pilot project confirmed pipe bursting as a viable alternative for water main replacement projects and provided practical recommendations for standard specifications, construction methodologies, material selection guidelines, and engineering/designer checklists.

Get full access to this chapter

View all available purchase options and get full access to this chapter.

REFERENCES

AWWA (American Water Works Association). (2020). Pipe Bursting of Potable Water Mains 4 In. (100 mm) to 36 In. (900 mm), AWWA Standard, ANSI/AWWA C622-19, Effective date: March 1, 2020.
AWWA (American Water Works Association). (2014). Rehabilitation of Water Mains, Manual of Water Supply Practices M28.
Bald, R. H. (2011). Hole Swallows Car, Film @ 11:00, Greensboro’s Pilot Program for Water Pipe Bursting, Leads to Expanded City Wide Program, Pipelines 2011, ASCE 2011.
IPBA. (2012). Guideline for Pipe Bursting, International Pipe Bursting Association (IPBA).
WSP. (2021). Lanham Station Road Water Main Replacement - Construction Management Services and Database Development Report. WSSC, Laurel, MD.

Information & Authors

Information

Published In

Go to Pipelines 2024
Pipelines 2024
Pages: 12 - 21

History

Published online: Aug 30, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Yudu (Sonia) Wu, P.E. [email protected]
1Assistant Vice President, WSP USA, Inc., Baltimore, MD. Email: [email protected]
Thomas Payne, P.E. [email protected]
2Senior Vice President, WSP USA, Inc., Providence, RI. Email: [email protected]
Keith A. Solomon, P.E. [email protected]
3Project Manager, Civil Engineering Support Section, Engineering and Construction Dept., WSSC Water, Laurel, MD. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$124.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$124.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share