Using Deep Learning Artificial Intelligence to Improve Foresight Method in the Optimization of Planning and Scheduling of Construction Processes

Publication: Computing in Civil Engineering 2021

ABSTRACT

Construction planning is a fundamental task in the management of construction projects. The most common modeling methods for construction planning are linear scheduling (LS), the critical path method (CPM), and discrete-event simulation (DES). While LS and CPM have advantages of visual feedback and simplicity, respectively, DES as a technique for simulating the behavior and output of a real-world process, facility, or system is the most versatile of these methods. However, when the constraints and dimensionality of a planning problem increase, DES methods are cumbersome and struggle to accurately reflect decision options. As an alternative to DES, deep learning artificial intelligence (AI) methods can, through the use of reinforcement learning, more rapidly review and recommend more planning options for scheduling complex construction projects. The goal of this paper is to examine the feasibility of deep learning AI as an alternative to the DES in an existing project planning method, named Foresight. Foresight is a graphical constraint-based method of planning manufacturing and construction processes that uses DES to simulate possible outcomes. This paper presents the process changes necessary in Foresight to accommodate deep learning algorithms, composed of multiple network layers. In addition, challenges of implementing deep learning AI in construction planning are discussed. Early project planning leads to improved performance in terms of cost, schedule, and operations, balancing the competing needs of a project. A new modeling paradigm is proposed that is better suited to the needs of contemporary construction project planning.

Get full access to this chapter

View all available purchase options and get full access to this chapter.

REFERENCES

Ansar, A., Flyvbjerg, B., Budzier, A., and Lunn, D. (2016). “Does Infrastructure Investment Lead to Economic Growth or Economic Fragility? Evidence from China.” Oxford Review of Economic Policy, 32(3), 360–390.
Asadi, A., Alsubaey, M., and Makatsoris, C. (2015). “A machine learning approach for predicting delays in construction logistics.” International Journal of Advanced Logistics, Taylor & Francis, 4(2), 115–130.
Beyl, S., Goth, F., and Assaad, F. F. (2018). “Revisiting the hybrid quantum Monte Carlo method for Hubbard and electron-phonon models.” Physical Review B, 97(8).
Cheng, M.-Y., Chang, Y.-H., and Korir, D. (2019). “Novel Approach to Estimating Schedule to Completion in Construction Projects Using Sequence and Nonsequence Learning.” Journal of Construction Engineering and Management, American Society of Civil Engineers, 145(11), 04019072.
Chua, D. K., and Shen, L. J. (2005). “Key Constraints Analysis with Integrated Production Scheduler.” Journal of Construction Engineering and Management, American Society of Civil Engineers, 131(7), 753–764.
Golparvar-Fard, G., and Peña-Mora, F. (2012). Application of Visualization Techniques for Construction Progress Monitoring. American Society of Civil Engineers, 216–223.
Flood, I. (2009). “A hierarchical constraint-based approach to modeling construction and manufacturing processes.” Proceedings of the 2009 Winter Simulation Conference (WSC), 2583–2592.
Flood, I. (2017). “Constraint-Based Graphical Modelling of On-Site and Factory-Based Construction Production Systems.” International Journal On Advances in Systems and Measurements, 10(1 and 2), 1–10.
Garcia, G., Golparvar-Fard, M., de la Garza, J. M., and Fischer, M. (2021). “Measuring Progress and Productivity in Model-Driven Engineering for Capital Project Delivery.” Journal of Construction Engineering and Management, American Society of Civil Engineers, 147(4), 04021009.
Golparvar-Fard, M., Heydarian, A., and Niebles, J. C. (2013). “Vision-based action recognition of earthmoving equipment using spatio-temporal features and support vector machine classifiers.” Advanced Engineering Informatics, 27(4), 652–663.
Gondia, A., Siam, A., El-Dakhakhni, W., and Nassar, A. H. (2020). “Machine Learning Algorithms for Construction Projects Delay Risk Prediction.” Journal of Construction Engineering and Management, American Society of Civil Engineers, 146(1), 04019085.
Hatami, M., Flood, I., Franz, B., and Zhang, X. (2019). “State-of-the-Art Review on the Applicability of AI Methods to Automated Construction Manufacturing.” Computing in Civil Engineering 2019: Data, Sensing, and Analytics, American Society of Civil Engineers Reston, VA, 368–375.
Kelley, J. E., and Walker, M. R. (1959). “Critical-path planning and scheduling.” Papers presented at the December 1-3, 1959, eastern joint IRE-AIEE-ACM computer conference, IRE-AIEE-ACM ’59 (Eastern), Association for Computing Machinery, New York, NY, USA, 160–173.
Koo, B., and Fischer, M. (2000). “Feasibility Study of 4D CAD in Commercial Construction.” Journal of Construction Engineering and Management, American Society of Civil Engineers, 126(4), 251–260.
Lee, K.-P., Lee, H.-S., Park, M., Kim, D. Y., and Jung, M. (2017). “Management-Reserve Estimation for International Construction Projects Based on Risk-Informed k-NN.” Journal of Management in Engineering, American Society of Civil Engineers, 33(4), 04017002.
Liu, N., Kang, B. G., and Zheng, Y. (2018). “Current Trend in Planning and Scheduling of Construction Project Using Artificial Intelligence.” IET Conference Proceedings, The Institution of Engineering & Technology, Stevenage, United Kingdom.
Lu, M., and Li, H. (2003). “Resource-Activity Critical-Path Method for Construction Planning.” Journal of Construction Engineering and Management-asce - J CONSTR ENG MANAGE-ASCE, 129.
Ma, G., and Wu, M. (2019). “A Big Data and FMEA-based construction quality risk evaluation model considering project schedule for Shanghai apartment projects.” International Journal of Quality & Reliability Management, Emerald Publishing Limited, 37(1), 18–33.
Tehrani, B. M., Wang, J., and Wang, C. (2019). “Review of Human-in-the-Loop Cyber-Physical Systems (HiLCPS): The Current Status from Human Perspective.” Computing in Civil Engineering 2019, American Society of Civil Engineers, Atlanta, Georgia, 470–478.
Wu, X., Zhu, X., Wu, G.-Q., and Ding, W. (n.d.). Data Mining with Big Data. 26.

Information & Authors

Information

Published In

Go to Computing in Civil Engineering 2021
Computing in Civil Engineering 2021
Pages: 1171 - 1178

History

Published online: May 24, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Mohsen Hatami, S.M.ASCE [email protected]
1M.E. Rinker, Sr. School of Construction Management, Univ. of Florida, Gainesville, FL. Email: [email protected]
Bryan Franz, Ph.D., A.M.ASCE [email protected]
2Assistant Professor, M.E. Rinker, Sr. School of Construction Management, Univ. of Florida, Gainesville, FL. Email: [email protected]
Suman Paneru, S.M.ASCE [email protected]
3M.E. Rinker, Sr. School of Construction Management, Univ. of Florida, Gainesville, FL. Email: [email protected]
Ian Flood, Ph.D., A.M.ASCE [email protected]
4UF Term Professor, M.E. Rinker, Sr. School of Construction Management, Univ. of Florida, Gainesville, FL. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$358.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$358.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share