Integrating BIM and ABS for Multi-Crane Operation Planning through Enabling Safe Concurrent Operations
Publication: Computing in Civil Engineering 2021
ABSTRACT
The planning of tower crane layout and operation is a difficult task. Improper planning can pose significant problems at large construction sites, especially those in which multiple cranes operate with complex interactions. While past research has made significant progress toward the layout planning of multiple tower cranes, relatively insufficient focus has been placed on crane operation planning. In fact, many projects involving multiple cranes suffer from limited flexibility imposed by a site’s spatial constraints, requiring further investigation on the operation planning of cranes beyond layout development. In response, this research develops a method of daily operation planning with multiple cranes, by integrating two simulation technologies, i.e., agent-based simulation (ABS) and building information modeling (BIM). This method explores the concurrent and alternative operational options of multiple cranes, which might sacrifice execution time of individual tasks but improves overall multi-crane operational performance. Using an actual construction project, computer simulations are conducted, and the results are compared with a commonly used method based on minimized individual task execution times. The results of the case study indicate that the developed method is able to improve the overall schedule time of multi-crane operations, with an average of 9.63% improvement in overall operation time.
Get full access to this chapter
View all available purchase options and get full access to this chapter.
REFERENCES
Al Hattab, M., Zankoul, E., Barakat, M., and Hamzeh, F. (2017). “Crane overlap and operational flexibility: Balancing utilization, duration, and safety”. Construction Innovation, 18(1), 43–63.
Al Hattab, M., Zankoul, E., and Hamzeh, F. (2014). “Optimizing joint operation of two tower cranes through look-ahead planning and process simulation”. 22nd Annual Conference of the International Group for Lean Construction: Understanding and Improving Project Based Production, IGLC 2014, March 2015, 535–546.
Al Hattab, M., Zankoul, E., and Hamzeh, F. R. (2017). “Near-Real-Time Optimization of Overlapping Tower Crane Operations: A Model and Case Study”. Journal of Computing in Civil Engineering, 31(4), 05017001.
Jabri, A., and Zayed, T. (2017). “Agent-based modeling and simulation of earthmoving operations”. Automation in Construction, 81, 210–223. https://doi.org/10.1016/j.autcon.2017.06.017.
Khodabandelu, A., Choi, J. O., Park, J., and Sanei, M. (2020). “Developing a Simulation Model for Lifting a Modular House”. Construction Research Congress 2020: Computer Applications, 145–152.
Khodabandelu, A., Park, J. W., and Arteaga, C. (2020). “Crane operation planning in overlapping areas through dynamic supply selection”. Automation in Construction, 117(May), 103253.
Mousaei, A., Taghaddos, H., Asce, M., Tak, A. N., Behzadipour, S., and Hermann, U. (2021). “Optimized Mobile Crane Path Planning in Discretized Polar Space”. Journal of Construction Engineering and Managementgineering, 147(5), 1–14.
Nekouvaght Tak, A., Taghaddos, H., Mousaei, A., and Hermann, U. R. (2020). “Evaluating industrial modularization strategies: Local vs. overseas fabrication”. Automation in Construction, 114(February), 103175. https://doi.org/10.1016/j.autcon.2020.103175.
Younes, A., and Marzouk, M. (2018). “Tower cranes layout planning using agent-based simulation considering activity conflicts”. Automation in Construction, 93, 348–360.
Information & Authors
Information
Published In
History
Published online: May 24, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
Cited by
- Kamyab Aghajamali, Ala Nekouvaght Tak, Hosein Taghaddos, Ali Mousaei, Saeed Behzadipour, Ulrich Hermann, Planning of Mobile Crane Walking Operations in Congested Industrial Construction Sites, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13109, 149, 7, (2023).