Chapter
May 24, 2022

Identifying Interconnectivities between Modular Construction Decision-Making Factors Using Clustering and Network Analysis

Publication: Computing in Civil Engineering 2021

ABSTRACT

Understanding the complex and unique requirements of modular construction methods has become crucial given the ongoing increase in popularity of such construction methods. In fact, studying the various modular construction factors and their interconnections to attain successful project performance is perceived to help practitioners choose the modularization strategies that are more suitable for their specific context. To this end, there is a need to better understand the interconnectivities among the various modular construction decision-making factors. As such, the paper aims to enhance the knowledge of the interactions and interdependencies among the various modular construction decision-making factors. To achieve that, the authors identified 50 decision-making factors affecting the use of modular construction in the industry based on an extensive analysis of the literature. Second, a reference matrix reflecting the co-occurrence of the decision-factors in the literature is constructed. Third, spectral clustering algorithms are used to aggregate the decision-factors based on their interconnectivities. Fourth, social network analysis is used to determine the key interconnectivities and combinations of decision-factors in each cluster. The findings show that the 50 identified decision-factors can be categorized into four clusters where each cluster reflects particular interconnected aspects. This paper provides professionals with a proactive approach that enables them to identify interaction and dependencies between the different modular construction aspects. Ultimately, the outcomes of this paper shall enhance a better understanding of the unique and complex requirements of modular construction projects.

Get full access to this chapter

View all available purchase options and get full access to this chapter.

REFERENCES

Abdul Nabi, M., and El-Adaway, I. H. (2021). Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects. Journal of Management in Engineering, 37(4), 04021023.
Wuni, I. Y., Shen, G. Q., and Hwang, B. G. (2020). Risks of modular integrated construction: a review and future research directions. Frontiers of Engineering Management, 7(1), 63–80.
FMI (Fails Management Institute). (2018). “New day, new mindset: Rethinking offsite construction.” Accessed April 05, 2021. https://www.fminet.com/wp-content/uploads/2018/02/FMI001-CURT-Report-2018-Interactive.pdf.
Yang, Y., Pan, M., Pan, W., and Zhang, Z. (2021). Sources of Uncertainties in Offsite Logistics of Modular Construction for High-Rise Building Projects. Journal of Management in Engineering, 37(3), 04021011.
Peltokorpi, A., Olivieri, H., Granja, A. D., and Seppänen, O. (2018). “Categorizing modularization strategies to achieve various objectives of building investments.” Constr. Manage. Econ. 36 (1): 32–48. https://doi.org/10.1080/01446193.2017.1353119.
Xue, Y., Zhao, Y., Cheng, L., An, J., Xue, L., and Sang, Z. (2019). Traffic Characteristics Analyses of Intersections Based on the Road Detector Data. In CICTP 2019 (pp. 4471–4480).
Brunskill, E., Kollar, T., and Roy, N. (2007). “Topological mapping using spectral clustering and classification.” In Proc., 2007 IEEE=RSJ Int. Conf. on Intelligent Robots and Systems, 3491–3496. New York: IEEE.
Kodinariya, T. M., and Makwana, P. R. (2013). “Review on determining number of cluster in k-means clustering.” Int. J. Advance Res. Comput. Sci. Manage. Stud. 1 (6): 90–95.
Ng, A. Y., Jordan, M. I., and Weiss, Y. (2002). “On spectral clustering: Analysis and an algorithm.” In Advances in neural information processing systems, 849–856. Cambridge, MA: MIT Press.
Enshassi, M. S., Walbridge, S., West, J. S., and Haas, C. T. (2019). Integrated risk management framework for tolerance-based mitigation strategy decision support in modular construction projects. Journal of Management in Engineering, 35(4), 05019004.
Taghaddos, H., Hermann, U., AbouRizk, S., and Mohamed, Y. (2014). Simulation-based multiagent approach for scheduling modular construction. Journal of Computing in Civil Engineering, 28(2), 263–274.
Li, D., Li, X., Feng, H., Wang, Y., and Fan, S. (2019a). “ISM-based relationship among critical factors that affect the choice of prefabricated concrete buildings in China.” Int. J. Constr. Manage. 1–16. https://doi.org /10.1080/15623599.2019.1675306.
Aljassmi, H., Han, S., and Davis, S. (2014). “Project pathogens network: New approach to analyzing construction-defects-generation mechanisms.” J. Constr. Eng. Manage., https://doi.org.10.1061/(ASCE)CO.1943-7862.0000774, 04013028.

Information & Authors

Information

Published In

Go to Computing in Civil Engineering 2021
Computing in Civil Engineering 2021
Pages: 795 - 802

History

Published online: May 24, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Mohamad Abdul Nabi [email protected]
1Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, Rolla, MO. Email: [email protected]
Islam H. El-Adaway [email protected]
2Hurst-McCarthy Professor of Construction Engineering and Management, Professor of Civil Engineering, and Founding Director of Missouri Consortium for Construction Innovation, Dept. of Civil, Architectural, and Environmental Engineering and Dept. of Engineering Management and Systems Engineering, Missouri Univ. of Science and Technology, Rolla, MO. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$358.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$358.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share