Using Jaccard Similarity to Identify New Issues from AEC Project Team Meeting Minutes
Publication: Computing in Civil Engineering 2021
ABSTRACT
Keeping track of issues and their documentation in architecture, engineering, and construction (AEC) projects demand significant amounts of time, budget, and effort. While various types of documents and software aid coordination in AEC projects, project team meeting minutes, developed as a follow-up to periodic project team meetings, continue to be the most common and prominent type of documentation across project types for recording team communications, tasks, and assignments. Presently, due to its dynamic nature, identifying unique project issues and tracking their progress from meeting minutes is a manual process that is time-consuming and susceptible to error. This study aims to automate the identification of project issues and track resolution timelines using project team meeting minute documents via the Jaccard similarity method. In this study, over 50 AEC project team meeting minutes documents of varying formats from three different projects of various sizes were collected, automatically converted, and coded to train the Jaccard similarity model for detecting new and continuing issues. Accuracy, precision, recall, and F1 parameters were tested, and the accuracy rates of 81.86%–94.18% were obtained. The study provides the groundwork to automate the analysis of issue complexity, detection of bottlenecks, and analysis of expertise assignments for issue resolution.
Get full access to this chapter
View all available purchase options and get full access to this chapter.
REFERENCES
Abd Jamil, A. H., and Fathi, M. S. (2020). “Enhancing BIM-Based Information Interoperability: Dispute Resolution from Legal and Contractual Perspectives”. Journal of Construction Engineering and Management, 146(7), 05020007.
Bag, S., Kumar, S. K., and Tiwari, M. K. (2019). “An efficient recommendation generation using relevant Jaccard similarity”. Information Sciences, 483, 53–64.
Caldas, C. H., Soibelman, L., and Han, J. (2002). “Automated classification of construction project documents”. Journal of Computing in Civil Engineering, 16(4), 234–243.
Diana, N. E., and Ulfa, I. H. (2019, March). “Measuring Performance of N-Gram and Jaccard-Similarity Metrics in Document Plagiarism Application”. In Journal of Physics: Conference Series (Vol. 1196, No. 1, p. 012069). IOP Publishing.
Gorse, C. A., and Emmitt, S. (2007). “Communication behaviour during management and design team meetings: a comparison of group interaction”, Construction management and economics, 25(11), 1197–1213.
Gorse, C. A., and Emmitt, S. (2009). “Informal interaction in construction progress meetings”. Construction Management and Economics, 27(10), 983–993.
Hamzeh, F. R., Zankoul, E., and Rouhana, C. (2015). “How can 'tasks made ready’during lookahead planning impact reliable workflow and project duration?”. Construction Management and Economics, 33(4), 243–258.
Huang, A. (2008, April). “Similarity measures for text document clustering”. In Proceedings of the sixth new zealand computer science research student conference (NZCSRSC2008), Christchurch, New Zealand (Vol. 4, pp. 9–56).
Jaccard, P. (1902). “Lois de distribution florale dans la zone alpine” Bull Soc Vaudoise Sci Nat, 38, 69–130.
Javanmardi, A., Abbasian-Hosseini, S. A., Liu, M., and Hsiang, S. M. (2020). “Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach”. Journal of Construction Engineering and Management, 146(4), 04020015.
Kisi, K. P., Kayastha, R., and Shrestha, P. P. (2020). “Back Charges in Construction Contract: Case Study of Airport Project”. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(3), 05020010.
Kumar, B., Cheng, J. C., and McGibbney, L. (2010, June). “Cloud computing and its implications for construction IT”. In Computing in Civil and Building Engineering, Proceedings of the International Conference (Vol. 30, p. 315).
Mincks, W. R., and Johnston, H. (2010). Construction jobsite management, Cengage Learning.
Moon, S., Lee, G., Chi, S., and Oh, H. (2021). “Automated Construction Specification Review with Named Entity Recognition Using Natural Language Processing”. Journal of Construction Engineering and Management, 147(1), 04020147.
Niwattanakul, S., Singthongchai, J., Naenudorn, E., and Wanapu, S. (2013, March). “Using of Jaccard coefficient for keywords similarity”. In Proceedings of the international multiconference of engineers and computer scientists (Vol. 1, No. 6, pp. 380–384).
van Niekerk, J. (2020). A Study of the Data Mining of Meeting Minutes of Construction Projects, Master’s Thesis, Faculty of Engineering at Stellenbosch University, NZ.
Wang, J., Shou, W., Wang, X., and Wu, P. (2016). “Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction”. Construction Management and Economics, 34(12), 859–874.
Wu, G., Liu, C., Zhao, X., and Zuo, J. (2017). “Investigating the relationship between communication-conflict interaction and project success among construction project teams.” International Journal of Project Management, 35(8), 1466–1482.
Information & Authors
Information
Published In
History
Published online: May 24, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.