Chapter
Jul 6, 2017

Soil Improvement Thanks to an Extra-Long Application of Directional Drilling

Publication: Grouting 2017

Abstract

The paper deals with a soil improvement by grouting carried out through tubes à manchettes of extraordinary length, installed inside HDD boreholes. As part of the Warsaw Subway Line No. 2 project, two twin TBM tunnels were required to cross under historical buildings. In order to mitigate the risk of settlements, a preliminary soil improvement was designed. Due to the particular layout of the buildings, an extreme solution was conceived, designed and applied. Starting from the surface, boreholes from 210-m to 260-m long were drilled by HDD technology. Each tunnel was fitted at its crown with 24 grouting pipes around the outside of the tunnel section to be bored. Grouting was performed by selective and repeated procedure, injecting first a high penetrability cement-based grout and then a silicate-based chemical mixture.

Get full access to this chapter

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Grouting 2017
Grouting 2017
Pages: 92 - 103

History

Published online: Jul 6, 2017

Permissions

Request permissions for this article.

Authors

Affiliations

Giuseppe Di Salvo [email protected]
Geotecnical Engineer, via Volturno 23, I-21100 Varese, Italy; formerly, Icotekne S.p.A. E-mail: [email protected]
Vittorio Manassero [email protected]
Underground Consulting s.a.s, via Certosa 1/i; I-27010 San Genesio ed Uniti (Pavia), Italy; formerly, Icotekne S.p.A. E-mail: [email protected]
Giuseppe Sichel [email protected]
Geotech Solutions s.a.s, via Genova 1, I-29022 Bobbio (PC), Italy; formerly, Icotekne S.p.A. E-mail: [email protected]
Paolo Foppiani [email protected]
Geotech Solutions s.a.s, via Genova 1, I-29022 Bobbio (PC), Italy; formerly, Icotekne S.p.A. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$80.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$80.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share