Design and Construction of Drilled Shaft Foundations for the Phoenix Sky Train Project
Publication: Geo-Frontiers 2011: Advances in Geotechnical Engineering
Abstract
The PHX Sky Train is an 8 km (5 mile) long automated people mover system located at Phoenix Sky Harbor International Airport. Phase I of the PHX Sky Train includes the design and construction of 227 drilled shafts supporting three stations and approximately 2,750 m (9,000 ft) of elevated guideway. The soil conditions in this area generally consist of alluvial sand, gravel and cobbles (locally known as SGC) deposited by the nearby Salt River. The foundation system will support relatively high axial loads, lateral loads and moments due to the height of the guideway above the ground surface, where it needs to pass over existing concourse walkways, bridges, a taxiway and buildings. The extreme design requirements, together with difficult ground conditions at the site, result in several challenges in the design and construction of the deep foundation system for the guideway and stations. Results from a full-scale load test were used to reduce the size of the drilled shafts. This paper provides an overall description of the PHX Sky Train project, a summary of the ground conditions, design requirements, load test results and construction methods used to successfully install the drilled shafts for this project.
Get full access to this chapter
View all available purchase options and get full access to this chapter.
Information & Authors
Information
Published In
Copyright
© 2011 American Society of Civil Engineers.
History
Published online: Apr 26, 2012
ASCE Technical Topics:
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.