Errata for “Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm” by Jin-Lee Kim and Ralph D. Ellis Jr.

You are viewing the correction.
VIEW THE CORRECTED ARTICLE
Publication: Journal of Construction Engineering and Management
Volume 136, Issue 9
On page 166, the values in the first three columns under “Parallel schedule generation scheme” in Table 2 were mistyped. The correct values are below:
Table 2. Corrected Table for Comparison of Starting Times of Activities by Scheme
ActivityStarting times of activities obtained
No.Res.Req.GA-scheduler (Chan et al. 1996)Serial schedule generation schemeParallel schedule generation scheme
S1S2S3ElitistS1S2S3ElitistS1S2S3
1367886866666
2600020000000
3410111401066610206
421515191212121014121010
542828282828282626282826
62678121212101412108
746668668106610
821718182422222024222224
94323232222222208222218
1052222223232323232323232
1122828282828282626282826

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 136Issue 9September 2010
Pages: 1061

History

Received: Jan 26, 2010
Accepted: Apr 19, 2010
Published online: Aug 13, 2010
Published in print: Sep 2010

Permissions

Request permissions for this article.

Authors

Affiliations

Jin-Lee Kim, M.ASCE
Assistant Professor, Dept. of Civil Engineering and Construction Engineering Management, California State Univ., Long Beach, CA 90840. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share