The U.S. Army Corps of Engineers maintains a database of cost information for competitively bid dredging projects. These data were used to construct linear regression models and radial-basis-function neural networks to predict the completed cost of the dredging projects. The stepwise linear regression procedure was used to construct equations to predict the completed cost based on input of the low bid, government cost estimates, and estimated project-dredging quantities. A data transformation using the natural logarithm enhanced the linear relationships between the variables. An exponential relationship between the low bid and completed cost indicated that large dredging projects could be completed for less than the bid amount. The variables used as inputs to the neural networks were the low bid, the government estimate, estimated quantity, the type of dredge, the method of dredged material disposal, the number of bidders, and the class of work. The addition of categorical variables like the type of dredging and disposal method did not improve the predictive performance of the neural network. The best neural network model was able to predict 40.4% of the test set projects within 10% of the actual cost. The best regression model predicted 51.4% of the projects within 10% of the actual cost.
Get full access to this article
View all available purchase options and get full access to this article.
References
Adeli, H.(2001). “Neural networks in civil engineering.” Comput. Aided Civ. Infrastruct. Eng., 16(1), 126–142.
Draper, N. R., and Smith, H. (1981). Applied regression analysis, 2nd Ed., Wiley, New York.
Neural Connection 1.0 applications guide. (1995a). SPSS and Recognition Systems, Inc., SPSS, Chicago.
Neural Connection 1.0 user’s guide. (1995b). SPSS and Recognition Systems, Inc., SPSS, Chicago, Ill.
Ostwald, P. F. (2001). Construction cost analysis and estimating, Prentice-Hall, Upper Saddle River, N.J.
Rzempoluck, E. J. (1998). Neural network data analysis using Simulnet, Springer, New York.
SPSS. (1998). SPSS Base 8.0 applications guide, SPSS Inc., Chicago.
SPSS. (2001). Clementine 6.0 user’s guide, SPSS Inc., Chicago.
U.S. Army Corps of Engineers. (2002a). “Number of contracts, cubic yards and dollars by type of dredge and fiscal year.” 〈www.wrsc.usace.army.mil/ndc/drgdredgtype.htm〉 (April 5, 2002).
U.S. Army Corps of Engineers. (2002b). “Number of contracts, cubic yards and dollars by type of material disposal and fiscal year.” 〈www.wrsc.usace.army.mil/ndc/drgmatdisp.htm〉 (April 5, 2002).
Williams, T. P., Miles, J. C., and Moore, C. J.(1999). “Predicted cost escalations in competitively bid highway projects.” Proc. Inst. Civ. Eng., Transp., 135(4), 195–199.
Information & Authors
Information
Published In
Copyright
Copyright © 2003 American Society of Civil Engineers.
History
Received: May 3, 2002
Accepted: May 20, 2003
Published online: Oct 15, 2003
Published in print: Nov 2003
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.