DISCUSSIONS AND CLOSURES
Jun 1, 2006

Discussion of “Modeling a Contractor’s Markup Estimation” by Min Liu and Yean Yng Ling

This article is a reply.
VIEW THE ORIGINAL ARTICLE
Publication: Journal of Construction Engineering and Management
Volume 132, Issue 6
First page of PDF

Get full access to this article

View all available purchase options and get full access to this article.

References

Ahmad, I., and Minkarah, I. (1988). “Questionnaire survey on bidding in construction.” J. Manage. Eng., 4(3), 229–243.
Akintoye, A., and Fitzgerald, E. (2000). “A survey of current cost estimating practices in the UK.” Constr. Manage. Econom., 18(2), 161–172.
Frayman, Y. (1999). “Fuzzy neural networks for control of dynamic systems.” Ph.D. thesis, Deakin Univ., Australia.
Goh, B. H. (1996). “Residential construction demand forecasting using economic indicators: A comparative study of artificial neural networks and multiple regression.” Constr. Manage. Econom., 14(1), 25–34.
Haykin, S. (1999). Neural networks: A comprehensive foundation, Prentice-Hall, Upper Saddle River, N.J.
Lin, C. T., and Lee, C. S. G. (1996). Neural fuzzy systems: A neuro-fuzzy synergism to intelligent systems, Prentice-Hall, Upper Saddle River, N.J.
Liu, P. Y., and Li, H. X. (2004). Fuzzy neural network theory and application, World Scientific, Singapore.
Low, S. P., and Chan, Y. M. (1997). Managing productivity in construction—JIT operations and measurements, Ashgate Publishing, U.K.
Mak, S., and Picken, D. (2000). “Using risk analysis to determine construction project contingencies.” J. Constr. Eng. Manage., 126(2), 130–136.
Malhotra, N. K. (1982). “Information overload and consumer making.” J. Consum. Res., 8(4), 419–430.
Shash, A. A. (1993). “Factors considered in bidding decision by top U.K. contractors.” Constr. Manage. Econom., 11(1), 111–118.
Shash, A. A., and Abdul-Hadi, N. H. (1992). “Factors affecting a contractor’s mark-up size decision in Saudi Arabia.” Constr. Manage. Econom., 10(5), 415–429.
Shash, A. A., and Abdul-Hadi, N. H. (1993). “The effect of contractor size on mark-up size decision in Saudi Arabia.” Constr. Manage. Econom., 11(3), 421–429.
Shen, L. Y., Li, Q. M., Drew, D., and Shen, Q. P. (2004). “Awarding construction contracts on multicriteria basis in China.” J. Constr. Eng. Manage., 130(3), 385–393.
Shen, L. Y., Lu, W. S., Li, H., and Shen, Q. P. (2003). “Computer-aided decision support system for assessing contractor’s competitiveness.” Autom. Constr., 12(5), 577–587.
Stowa. (2005). “Neuro-fuzzy and hybrid approaches.” Stichting Toege-past Onderzoek Waterbeheen, ⟨http://www.stowa-nn.ihe.nl/NFS.htm⟩ (July 1, 2005).
Thompson, A., and Perry, J. G. (1992). Engineering construction risks: A guide to project risk analysis and risk management, Thomas Telford, London.
Unisearch, Ltd. (2002). Workplace regulation, reform and productivity in the international building and construction industry, Royal Commission into the Building and Construction Industry, Australia.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 132Issue 6June 2006
Pages: 658 - 661

History

Published online: Jun 1, 2006
Published in print: Jun 2006

Permissions

Request permissions for this article.

Authors

Affiliations

Associate Professor, Dept. of Management Engineering, Chongqing Jiao Tong Univ., No. 66 Xuefu Rd., Nan’an District, Chongqing, P.R. China, 400074. E-mail: [email protected]
Senior Lecturer, School of Architecture and Building, Geelong Waterfront Campus, Deakin Univ., 1 Gheringhap St., Geelong, Victoria 3217, Australia. E-mail: [email protected]
David Picken [email protected]
Senior Lecturer and Associate Head, School of Architecture and Building, Geelong Waterfront Campus, Deakin Univ., 1 Gheringhap St., Geelong, Victoria 3217, Australia. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share