Concessionaire Selection: Methods and Criteria
This article has a reply.
VIEW THE REPLYThis article has a reply.
VIEW THE REPLYPublication: Journal of Construction Engineering and Management
Volume 130, Issue 2
Abstract
Various innovative public private partnerships (PPPs) have been explored in worldwide infrastructure development in which BOT (build-operate-transfer) is the underlying concept. Selection of the right concessionaire, which is critical to the success of such BOT-type PPPs, depends on the quality of identifying and defining suitable project-specific criteria and the quality of formulating an efficient tender evaluation methodology. A systematic research approach (including literature review, case studies, interview/correspondence, and a structured questionnaire survey) has been adopted to draw experience and learn lessons from international PPP practices and to unearth and refine experiential and expert knowledge from worldwide experts and practitioners. Tender evaluation criteria and methods currently used in diverse types of PPP projects in both developed and developing countries are identified, compared, analyzed, and then generalized.
Get full access to this article
View all available purchase options and get full access to this article.
References
Alfelor, W. M., and Ofori, G. (1999). “Facilitating build-operate-transfer projects in the Philippines amid Asian financial turmoil.” Proc., Joint Triennial Symposium (CIB Commissions W65 and W55, with the Participation of W92, W99, TG31 & TG35), Cape Town, South Africa, Vol. 1, 316–324.
Ashley, D., Bauman, R., Carroll, J., Diekmann, J., and Finlayson, F.(1998). “Evaluation viability of privatized transportation projects.” J. Infrastruct. Syst., 4(3), 102–110.
Berry, C. (1991). “Criteria for successful project financing.” Project finance yearbook 1991/1992, Bedfordshire, U.K., 15–20.
Blackwell, M. (2000). The PFI/PPP and property, Chandos, Oxford, England.
Charoenpornpatana, S., and Minato, T. (1997). “Privatization-induced risks: stated-owned transportation enterprises in Thailand.” Proc., CIB W92 (Procurement Systems) and CIB TG 23 (Culture in Construction) Joint Symp.: Profitable Partnering in Construction Procurement, 429–439.
Gupta, M. C., and Narasimham, S. V.(1998). “Discussion of ‘CSFs in competitive tendering and negotiation model for BOT projects’ by Robert L. K. Tiong.” J. Constr. Eng. Manage., 124(5), 430.
Kepner, C. H., and Tregoe, B. B. (1981). The new rational manager, Princeton Research Press, Princeton, N.J.
Kumaraswamy, M. M., and Zhang, X. Q.(2001). “Governmental role in BOT-led infrastructure development.” Int. J. Proj. Manage., 19, 195–205.
Levy, S. M. (1996). Build, operate, transfer, Wiley, New York.
Loosemore, M.(1999). “International construction management research: cultural sensitivity in methodological design.” Constr. Manage. Econom., 17, 553–561.
Malini, E.(1999). “Build operate transfer municipal bridge projects in India.” J. Manage. Eng., 15(4), 51–58.
Ministry of Finance & Planning. (1998). Guidelines on government tender procedure, Part II (private sector infrastructure projects), Sri Lanka.
Morledge, R., and Owen, K. (1997). “Developing a methodological approach to the identification of factors critical to success in privatized infrastructure projects in the U.K.” Proc., CIB W92 and CIB TG 23 Joint Symposium: Profitable Partnering in Construction Procurement, 487–498.
Ogunlana, S. O. (1997). “Build operate transfer procurement traps: Examples from transportation projects in Thailand.” Proc., CIB W92 Symp. on Procurement—A Key to Innovation, Montreal, Canada, 585–594.
Shepherd, F.(1999). “Developing the Melbourne City Link.” Privatization Int., 134, 7–12.
Tiong, R. L. K.(1996). “CSFs in competitive tendering and negotiation model for BOT projects.” J. Constr. Eng. Manage., 122(3), 205–211.
Tiong, R. L. K., and Alum, J.(1997a). “Evaluation of proposals for BOT projects.” Int. J. Proj. Manage., 15(2), 67–72.
Tiong, R. L. K., and Alum, J.(1997b). “Distinctive winning elements in BOT tender.” Eng., Constr., Archit. Manage., 4/2, 83–94.
Treasury Taskforce. (1999). Technical note no. 4: How to appoint and work with a preferred bidder, Treasury Taskforce, London, U.K.
Woodward, D. G.(1995). “Use of sensitivity analysis in build-own-operate-transfer project evaluation.” Int. J. Proj. Manage., 13(4), 239–246.
Zhang, X. Q., and Kumaraswamy, M. M.(2001a). “Hong Kong Experience in managing BOT projects.” J. Constr. Eng. Manage., 127(2), 154–162.
Zhang, X. Q., and Kumaraswamy, M. M.(2001b). “BOT-based approaches to infrastructure development in China.” J. Infrastruct. Syst., 7(1), 18–25.
Zhang, X. Q., Kumaraswamy, M. M., Zheng, W., and Palaneeswaran, E.(2002). “Concessionaire selection for build-operate-transfer tunnel projects in Hong Kong.” J. Constr. Eng. Manage., 128(2), 155–163.
Information & Authors
Information
Published In
Copyright
Copyright © 2004 American Society of Civil Engineers.
History
Received: Jul 15, 2002
Accepted: Feb 3, 2003
Published online: Mar 15, 2004
Published in print: Apr 2004
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.