Factors Affecting the Success of a Construction Project
This article has a reply.
VIEW THE REPLYThis article has a reply.
VIEW THE REPLYPublication: Journal of Construction Engineering and Management
Volume 130, Issue 1
Abstract
Different researchers have tried to determine the factors for a successful project for a long time. Lists of variables have been abounded in the literature, however, no general agreement can be made. The aim of this paper is to develop a conceptual framework on critical success factors (CSFs). Seven major journals in the construction field are chosen to review the previous works on project success. Five major groups of independent variables, namely project-related factors, project procedures, project management actions, human-related factors, and external environment are identified as crucial to project success. Further study on the key performance indicators (KPIs) is needed to identify the causal relationships between CSFs and KPIs. The causal relationships, once identified, will be a useful piece of information to implement a project successfully.
Get full access to this article
View all available purchase options and get full access to this article.
References
Akinsola, A. O., Potts, K. F., Ndekugri, I., and Harris, F. C.(1997). “Identification and evaluation of factors influencing variations on building projects.” Int. J. Proj. Manage., 15(4), 263–267.
Belassi, W., and Tukel, O. I.(1996). “A new framework for determining critical success/failure factors in projects.” Int. J. Proj. Manage., 14(3), 141–151.
Belout, A.(1998). “Effects of human resource management on project effectiveness and success: toward a new conceptual framework.” Int. J. Proj. Manage., 16(1), 21–26.
Chan, A. P. C., Scott, D., and Lam, E. W. M.(2002). “Framework of success criteria for design/build projects.” J. Manage. Eng., 18(3), 120–128.
Chan, D. W. M., and Kumaraswamy, M. M.(1997). “A comparative study of causes of time overruns in Hong Kong construction projects.” Int. J. Proj. Manage., 15(1), 55–63.
Chau, K. W.(1997). “The ranking of construction management journals.” Constr. Manage. Econom., 15(4), 387–398.
Chua, D. K. H., Kog, Y. C., and Loh, P. K.(1999). “Critical success factors for different project objectives.” J. Constr. Eng. Manage., 125(3), 142–150.
Dissanayaka, S. M., and Kumaraswamy, M. M.(1999). “Evaluation of factors affecting time and cost performance in Hong Kong building projects.” Eng., Constr. Archit. Manage., 6(3), 287–298.
Hassan, A. Q.(1995). “Don’t burn that bridge.” J. Manage. Eng., 11(6), 22.
Hubbard, D. G.(1990). “Successful utility project management from lessons learned.” Proj. Manage. J., 21(3), 19–23.
Jaselskis, E. J., and Ashley, D. B.(1991). “Optimal allocation of project management resources for achieving success.” J. Constr. Eng. Manage., 117(2), 321–340.
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., and Harris, F. C.(1997). “Factors influencing construction time and cost overruns on high-rise projects in Indonesia.” Constr. Manage. Econom., 15(1), 83–94.
Kumaraswamy, M. M., and Chan, D. W. M.(1999). “Factors facilitating faster construction.” J. Constr. Procure., 5(2), 88–98.
Li, H., Cheng, E. W. L., and Love, P. E. D.(2000). “Partnering research in construction.” Eng., Const. Archit. Manage., 7(1), 76–99.
Pocock, J. B., Liu, L. Y., and Kim, M. K.(1997b). “Impact of management approach on project interaction and performance.” J. Constr. Eng. Manage., 123(4), 411–418.
Pocock, J. B., Liu, L. Y., and Tang, W. H.(1997a). “Prediction of project performance based on degree of interaction.” J. Manage. Eng., 13(2), 63–76.
Sanvido, V., Grobler, F., Pariff, K., Guvents, M., and Coyle, M.(1992). “Critical success factors for construction projects.” J. Constr. Eng. Manage., 118(1), 94–111.
Songer, A. D., and Molenaar, K. R.(1997). “Project characteristics for successful public-sector design-build.” J. Constr. Eng. Manage., 123(1), 34–40.
Walker, D. H. T.(1995). “An investigation into construction time performance.” Constr. Manage. Econom., 13(3), 263–274.
Walker, D. H. T.(1997). “Construction time performance and traditional versus nontraditional procurement methods.” J. Const. Procure., 3(1), 42–55.
Walker, D. H. T., and Vines, M. W.(2000). “Australian multi-unit residential project construction time performance factors.” Eng., Constr. Archit. Manage., 7(3), 278–284.
Information & Authors
Information
Published In
Copyright
Copyright © 2004 American Society of Civil Engineers.
History
Received: Apr 16, 2001
Accepted: Oct 21, 2002
Published online: Jan 16, 2004
Published in print: Feb 2004
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.