TECHNICAL PAPERS
Jun 1, 1999

Earthmoving Productivity Estimation Using Linear Regression Techniques

This article has a reply.
VIEW THE REPLY
Publication: Journal of Construction Engineering and Management
Volume 125, Issue 3

Abstract

The problem of accurate estimation of earthmoving productivity has intrigued many researchers for many years, but there is yet no model that will predict the output of such operations with a satisfactory degree of confidence for all situations. The problem is exacerbated by the occurrence of hauler bunching that results in many deterministic models overestimating productivity. Systems analysis methods can be used, such as queuing theory or simulation, but they are generally impractical to the average site planning engineer. This paper investigates the results obtained from over 140 separate earthmoving operations taken from four different highway construction projects. Initially, the effects of bunching are determined, and many factors that influence productivity are identified. To investigate the relationships between earthmoving operating conditions and both productivity and bunching, and to develop a deterministic model that will enable earthmoving operations to be planned for many different situations with relative ease, stepwise multiple regression techniques are used. The results indicate that there is a strong linear relationship between operating conditions and productivity.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
AbouRizk, S. M., and Halpin, D. W. ( 1992). “Modeling input data for construction simulation.” Proc., 8th National Conf. on Computing in Civ. Engrg., Dallas, Texas, June 7–9, 1147–1154.
2.
Brubaker, K. L., and McCuen, R. H. (1990). “Level of significance selection in engineering analysis.”J. Prof. Issues in Engrg., ASCE, 116(4), 375–387.
3.
Carmichael, D. G. ( 1986). “Erlang loading models in earthmoving.” Civ. Engrg. Sys., 3, 118–124.
4.
Carmichael, D. G. ( 1987). Engineering queues in construction and mining. Ellis Horwood. Chichester, England.
5.
Christian, J., and Xie, T. X. ( 1996). “Improving earthmoving by more realistic knowledge.” Can. J. Civ. Engrg., Ottawa, 23, 250–259.
6.
Clemmens, J. P., and Willenbrock, J. H. (1978). “The Scrapesim computer simulation.”J. Constr. Div., ASCE, 4(4), 419–435.
7.
Farid, F., and Koning, T. L. (1994). “Simulation verifies queuing program for selecting loader truck fleets.”J. Constr. Engrg. and Mgmt., ASCE, 120(2), 386–404.
8.
Gransberg, D. D. (1996). “Optimizing haul unit size and number based on loading facility characteristics.”J. Constr. Engrg. and Mgmt., ASCE, 122(3), 248–253.
9.
Halpin, D. W. (1977). “CYCLONE: Method for modeling of job site processes.”J. Constr. Div., ASCE, 103, 489–499.
10.
Hogg, R. V., and Ledolter, J. ( 1992). Applied statistics for engineers and physical scientists, 2nd Ed., Macmillan, New York.
11.
Morgan, W. C., and Peterson, L. L. ( 1968). “Determining shovel-truck productivity.” Mining Engrg., December, 76–80.
12.
Paulson, B. C., Douglas, S. A., Kalk, A., Touran, A., and Victor, G. A. (1983). “Simulation and analysis of construction operations.”J. Tech. Topics in Civ. Engrg., ASCE, 109(2), 89–104.
13.
Shi, J., and AbouRizk, S. M. (1997). “Resource-based modeling for construction simulation.”J. Constr. Engrg. and Mgmt., ASCE, 123(1), 26–33.
14.
Smith, S. D., Osborne, J. R., and Forde, M. C. (1995a). “Analysis of earth-moving systems using discrete-event simulation.”J. Constr. Engrg. and Mgmt., ASCE, 121(4), 388–396.
15.
Smith, S. D., Osborne, J. R., and Forde, M. C. ( 1995b). “Productivity estimation in back-acter/dumptruck earth-moving operations.” Proc., Instn. of Civ. Engrs., Transport., 111(2), 125–131.
16.
Smith, S. D., Osborne, J. R., and Forde, M. C. ( 1996). “The use of a discrete-event simulation model with Erlang probability distributions in the estimation of earthmoving production.” Civ. Engrg. Sys., 13(1), 25–44.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 125Issue 3June 1999
Pages: 133 - 141

History

Received: Jul 31, 1997
Published online: Jun 1, 1999
Published in print: Jun 1999

Permissions

Request permissions for this article.

Authors

Affiliations

Simon D. Smith
Shell Lect. in Proj. Mgmt., School of Civ. and Envir. Engrg., Div. of Engrg., Univ. of Edinburgh, Edinburgh, EH9 3JN, U.K. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share