Technical Papers
Nov 30, 2021

Joint Optimization of Forward Contract and Operating Rules for Cascade Hydropower Reservoirs

Publication: Journal of Water Resources Planning and Management
Volume 148, Issue 2

Abstract

Forward contract is a useful tool for hydropower producers to hedge revenue uncertainty sourced from varied spot prices. However, few studies have been explored to jointly derive the optimal forward contract and operating rules to guide hydropower operations. To address this issue, the following steps for cascade reservoirs are proposed: (1) a two-layer nested approach is used to derive optimal contract targets coordinated with operation trajectory (saying reservoir water level time series) by inputting deterministic inflows, (2) the forms of the operating rules are then identified based on the optimal operation trajectory from the first step, and (3) a simulation-based optimization approach is used to jointly refine the optimal contract and operating rules with the forms identified in the second step. With China’s Hubei Province as the market boundary, the Qing River cascade reservoir system was selected as the case study. The results show that (1) the two-layer nested approach could find the optimal deterministic operation together with contract targets; (2) the total cascade output is related to both available energy and spot price, with the coefficients of determination for each month mostly greater than 0.5; and (3) the refined operating rules and contract effectively improved the annual hydropower revenue by 3.65% ($14.15 million) compared to that of the conventional operating rules. The proposed method to jointly derive forward contract and operating rules is helpful for gaining more revenue under long-term hydropower operations.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, or code generated or used during the study are available from the corresponding author by request.

Acknowledgments

This study was supported by the National Natural Science Foundation of China (U1865201; 51861125102) and Hubei Qingjiang Hydroelectric Development Co. Ltd. (ENQJ-TD1-FW-2019185). Sincere gratitude is extended to the editor and anonymous reviewers for their professional comments and corrections, which greatly improved the presentation of the paper.

References

Arvaniti, N. V., and J. Rosing. 1970. “Composite representation of a multireservoir hydroelectric power system.” IEEE Trans. Power Appar. Syst. 89 (2): 319–326. https://doi.org/10.1109/TPAS.1970.292595.
Bhaskar, N. R., and E. E. Whitlatch Jr. 1980. “Derivation of monthly reservoir release policies.” Water Resour. Res. 16 (6): 987–993. https://doi.org/10.1029/WR016i006p00987.
Bjorgan, R., C.-C. Liu, and J. Lawarree. 1999. “Financial risk management in a competitive electricity market.” IEEE Trans. Power Syst. 14 (4): 1285–1291. https://doi.org/10.1109/59.801886.
Campo, R. A. 2002. “Probabilistic optimality in long-term energy sales.” IEEE Trans. Power Syst. 17 (2): 237–242. https://doi.org/10.1109/TPWRS.2002.1007887.
Carrion, M., A. J. Conejo, and J. M. Arroyo. 2007. “Forward contracting and selling price determination for a retailer.” IEEE Trans. Power Syst. 22 (4): 2105–2114. https://doi.org/10.1109/TPWRS.2007.907397.
Celeste, A. B., and M. Billib. 2009. “Evaluation of stochastic reservoir operation optimization models.” Adv. Water Resour. 32 (9): 1429–1443. https://doi.org/10.1016/j.advwatres.2009.06.008.
Celeste, A. B., and M. Billib. 2012. “Improving implicit stochastic reservoir optimization models with long-term mean inflow forecast.” Water Resour. Manage. 26 (9): 2443–2451. https://doi.org/10.1007/s11269-012-0025-1.
Chang, Y.-T., L.-C. Chang, and F.-J. Chang. 2005. “Intelligent control for modeling of real-time reservoir operation, part II: Artificial neural network with operating rule curves.” Hydrol. Processes 19 (7): 1431–1444. https://doi.org/10.1002/hyp.5582.
Chatzigiannis, D. I., G. A. Dourbois, P. N. Biskas, and A. G. Bakirtzis. 2016. “European day-ahead electricity market clearing model.” Electr. Power Syst. Res. 140 (Nov): 225–239. https://doi.org/10.1016/j.epsr.2016.06.019.
Conejo, A. J., R. Garcia-Bertrand, M. Carrion, A. Caballero, and A. de Andres. 2008. “Optimal involvement in futures markets of a power producer.” IEEE Trans. Power Syst. 23 (2): 703–711. https://doi.org/10.1109/TPWRS.2008.919245.
Deb, K., A. Pratap, S. Agarwal, and T. A. M. T. Meyarivan. 2002. “A fast and elitist multiobjective genetic algorithm: NSGA-II.” IEEE Trans. Evol. Comput. 6 (2): 182–197. https://doi.org/10.1109/4235.996017.
El Khatib, S., and F. D. Galiana. 2007. “Negotiating bilateral contracts in electricity markets.” IEEE Trans. Power Syst. 22 (2): 553–562. https://doi.org/10.1109/TPWRS.2007.894858.
Fang, D., J. Wu, and D. Tang. 2012. “A double auction model for competitive generators and large consumers considering power transmission cost.” Int. J. Electr. Power Energy Syst. 43 (1): 880–888. https://doi.org/10.1016/j.ijepes.2012.05.041.
Feng, Z.-K., W.-J. Niu, C.-T. Cheng, and X.-Y. Wu. 2018. “Optimization of large-scale hydropower system peak operation with hybrid dynamic programming and domain knowledge.” J. Cleaner Prod. 171 (Jan): 390–402. https://doi.org/10.1016/j.jclepro.2017.09.257.
Gabriel, S. A., A. J. Conejo, M. A. Plazas, and S. Balakrishnan. 2006. “Optimal price and quantity determination for retail electric power contracts.” IEEE Trans. Power Syst. 21 (1): 180–187. https://doi.org/10.1109/TPWRS.2005.860920.
Gernaat, D. E. H. J., P. W. Bogaart, D. P. van Vuuren, H. Biemans, and R. Niessink. 2017. “High-resolution assessment of global technical and economic hydropower potential.” Nat. Energy 2 (10): 821–828. https://doi.org/10.1038/s41560-017-0006-y.
Giuliani, M., A. Castelletti, F. Pianosi, E. Mason, and P. M. Reed. 2016. “Curses, tradeoffs, and scalable management: Advancing evolutionary multiobjective direct policy search to improve water reservoir operations.” J. Water Resour. Plann. Manage. 142 (2): 04015050. https://doi.org/10.1061/(ASCE)WR.1943-5452.0000570.
Gong, Y., P. Liu, B. Ming, W. Xu, K. Huang, and X. Li. 2021. “Deriving pack rules for hydro-photovoltaic hybrid power systems considering diminishing marginal benefit of energy.” Appl. Energy 304 (1): 11785.
Guariso, G., and M. Sangiorgio. 2020. “Performance of implicit stochastic approaches to the synthesis of multireservoir operating rules.” J. Water Resour. Plann. Manage. 146 (6): 04020034. https://doi.org/10.1061/(ASCE)WR.1943-5452.0001200.
Han, J.-C., G.-H. Huang, H. Zhang, Y.-S. Zhuge, and L. He. 2012. “Fuzzy constrained optimization of eco-friendly reservoir operation using self-adaptive genetic algorithm: A case study of a cascade reservoir system in the Yalong River, China.” Ecohydrology 5 (6): 768–778. https://doi.org/10.1002/eco.267.
He, S., S. Guo, K. Chen, L. Deng, Z. Liao, F. Xiong, and J. Yin. 2019a. “Dataset for reservoir impoundment operation coupling parallel dynamic programming with importance sampling and successive approximation.” Data Brief 26 (Oct): 104440. https://doi.org/10.1016/j.dib.2019.104440.
He, S., S. Guo, K. Chen, L. Deng, Z. Liao, F. Xiong, and J. Yin. 2019b. “Optimal impoundment operation for cascade reservoirs coupling parallel dynamic programming with importance sampling and successive approximation.” Adv. Water Resour. 131 (Sep): 103375. https://doi.org/10.1016/j.advwatres.2019.07.005.
He, S. K., S. L. Guo, J. B. Yin, Z. Liao, H. Li, and Z. J. Liu. 2022. “A novel impoundment framework for a mega reservoir system in the upper Yangtze River basin.” Appl. Energy 305 (1): 117792.
Hubei Provincial Development and Reform Commission. 2017. “Notice on printing and distributing the 13th five year plan for energy development in Hubei Province.” Accessed October 28, 2017. http://fgw.hubei.gov.cn/fbjd/zc/gfwj/gf/201711/t20171113_1543925.shtml.
Hubei Provincial Development and Reform Commission. 2019. “Notice of the adjustment of electricity price from hydropower.” Accessed June 28, 2019. http://fgw.hubei.gov.cn/fbjd/zc/zcwj/tz/201907/t20190711_3763851.shtml.
Jamasb, T., and M. G. Pollitt. 2015. “Why and how to subsidise energy R + D: Lessons from the collapse and recovery of electricity innovation in the UK.” Energy Policy 83 (Aug): 197–205. https://doi.org/10.1016/j.enpol.2015.01.041.
Ji, C.-M., T. Zhou, and H.-T. Huang. 2014. “Operating rules derivation of jinsha reservoirs system with parameter calibrated support vector regression.” Water Resour. Manage. 28 (9): 2435–2451. https://doi.org/10.1007/s11269-014-0610-6.
Kelman, R., L. A. N. Barroso, and M. F. Pereira. 2001. “Market power assessment and mitigation in hydrothermal systems.” IEEE Trans. Power Syst. 16 (3): 354–359. https://doi.org/10.1109/59.932268.
Koutsoyiannis, D., and A. Economou. 2003. “Evaluation of the parameterization-simulation-optimization approach for the control of reservoir systems.” Water Resour. Res. 39 (6): 1–17. https://doi.org/10.1029/2003WR002148.
Labadie, J. W. 2004. “Optimal operation of multireservoir systems: State-of-the-art review.” J. Water Resour. Plann. Manage. 130 (2): 93–111. https://doi.org/10.1061/(ASCE)0733-9496(2004)130:2(93).
Lei, X., J. Zhang, H. Wang, M. Wang, S.-T. Khu, Z. Li, and Q. Tan. 2018. “Deriving mixed reservoir operating rules for flood control based on weighted non-dominated sorting genetic algorithm II.” J. Hydrol. 564 (Sep): 967–983. https://doi.org/10.1016/j.jhydrol.2018.07.075.
Li, H., P. Liu, S. Guo, L. Cheng, F. Huang, M. Feng, S. He, and B. Ming. 2021. “Deriving adaptive long-term complementary operating rules for a large-scale hydro-photovoltaic hybrid power plant using ensemble Kalman filter.” Appl. Energy 301 (1): 117482.
Li, L., P. Liu, D. E. Rheinheimer, C. Deng, and Y. Zhou. 2014. “Identifying explicit formulation of operating rules for multi-reservoir systems using genetic programming.” Water Resour. Manage. 28 (6): 1545–1565. https://doi.org/10.1007/s11269-014-0563-9.
Li, X., P. Liu, Z. Gui, B. Ming, Z. Yang, K. Xie, and X. Zhang. 2020. “Reducing lake water-level decline by optimizing reservoir operating rule curves: A case study of the Three Gorges Reservoir and the Dongting Lake.” J. Cleaner Prod. 264 (Aug): 121676. https://doi.org/10.1016/j.jclepro.2020.121676.
Liu, H., C. Jiang, and Y. Zhang. 2009. “Portfolio management of hydropower producer via stochastic programming.” Energy Convers. Manage. 50 (10): 2593–2599. https://doi.org/10.1016/j.enconman.2009.06.010.
Liu, P., S. Guo, L. Xiong, W. Li, and H. Zhang. 2006. “Deriving reservoir refill operating rules by using the proposed DPNS model.” Water Resour. Manage. 20 (3): 337–357. https://doi.org/10.1007/s11269-006-0322-7.
Liu, P., S. Guo, X. Xu, and J. Chen. 2011. “Derivation of aggregation-based joint operating rule curves for cascade hydropower reservoirs.” Water Resour. Manage. 25 (13): 3177–3200. https://doi.org/10.1007/s11269-011-9851-9.
Liu, P., L. Li, G. Chen, and D. E. Rheinheimer. 2014. “Parameter uncertainty analysis of reservoir operating rules based on implicit stochastic optimization.” J. Hydrol. 514 (Jun): 102–113. https://doi.org/10.1016/j.jhydrol.2014.04.012.
Lund, J. R., and J. Guzman. 1999. “Derived operating rules for reservoirs in series or in parallel.” J. Water Resour. Plann. Manage. 125 (3): 143–153. https://doi.org/10.1061/(ASCE)0733-9496(1999)125:3(143).
Ming, B., P. Liu, T. Bai, R. Tang, and M. Feng. 2017a. “Improving optimization efficiency for reservoir operation using a search space reduction method.” Water Resour. Manage. 31 (4): 1173–1190. https://doi.org/10.1007/s11269-017-1569-x.
Ming, B., P. Liu, J. Chang, Y. Wang, and Q. Huang. 2017b. “Deriving operating rules of pumped water storage using multiobjective optimization: Case study of the Han to Wei interbasin water transfer project, China.” J. Water Resour. Plann. Manage. 143 (10): 05017012. https://doi.org/10.1061/(ASCE)WR.1943-5452.0000828.
Ming, B., P. Liu, S. Guo, X. Zhang, M. Feng, and X. Wang. 2017c. “Optimizing utility-scale photovoltaic power generation for integration into a hydropower reservoir by incorporating long- and short-term operational decisions.” Appl. Energy 204 (Oct): 432–445. https://doi.org/10.1016/j.apenergy.2017.07.046.
Mo, B., A. Gjelsvik, and A. Grundt. 2001. “Integrated risk management of hydro power scheduling and contract management.” IEEE Trans. Power Syst. 16 (2): 216–221. https://doi.org/10.1109/59.918289.
National Development and Reform Commission. 2020. “Reply to recommendation No. 8689 of the third session of the 13th National People's Congress.” Accessed October 13, 2020. https://www.ndrc.gov.cn/xxgk/jianyitianfuwen/qgrddbjyfwgk/202107/t20210708_1289939.html?code=&state=123.
National Energy Administration. 2015. “Notice on printing and distributing supporting materials for power system reform.” Accessed November 31, 2015. http://www.nea.gov.cn/2015-11/30/c_134867851.htm.
Oliveira, R., and D. P. Loucks. 1997. “Operating rules for multireservoir systems.” Water Resour. Res. 33 (4): 839–852. https://doi.org/10.1029/96WR03745.
Palamarchuk, S. I. 2007. “Bilateral contracts for electricity delivery: Scheduling and arrangement.” In Vol. 1–5 of Proc., 2007 IEEE Lausanne Power Tech, 843–848. New York: IEEE.
Prabavathi, M., and R. Gnanadass. 2015. “Energy bidding strategies for restructured electricity market.” Int. J. Electr. Power Energy Syst. 64 (Jan): 956–966. https://doi.org/10.1016/j.ijepes.2014.08.018.
Saad, M., A. Turgeon, P. Bigras, and R. Duquette. 1994. “Learning disaggregation technique for the operation of long-term hydroelectric power-systems.” Water Resour. Res. 30 (11): 3195–3202. https://doi.org/10.1029/94WR01731.
Sahu, R. K., and D. B. McLaughlin. 2018. “An ensemble optimization framework for coupled design of hydropower contracts and real-time reservoir operating rules.” Water Resour. Res. 54 (10): 8401–8419. https://doi.org/10.1029/2018WR022753.
Sangiorgio, M., and G. Guariso. 2018. “NN-based implicit stochastic optimization of multi-reservoir systems management.” Water 10 (3): 303. https://doi.org/10.3390/w10030303.
Shrestha, G. B., B. K. Pokharel, T. T. Lie, and S. E. Fleten. 2005. “Medium term power planning with bilateral contracts.” IEEE Trans. Power Syst. 20 (2): 627–633. https://doi.org/10.1109/TPWRS.2005.846239.
State Grid Hubei Electric Power. 2020. “Annual reports on power supply information (2008-2019).” Accessed April 24, 2020. http://www.hb.sgcc.com.cn/html/main/col2753/column_2753_1.html.
Terry, L. A., M. V. F. Pereira, T. A. Araripe Neto, L. F. C. A. Silva, and P. R. H. Sales. 1986. “Coordinating the energy generation of the brazilian national hydrothermal electrical generating-system.” Interfaces 16 (1): 16–38. https://doi.org/10.1287/inte.16.1.16.
Tilmant, A., D. Pinte, and Q. Goor. 2008. “Assessing marginal water values in multipurpose multireservoir systems via stochastic programming.” Water Resour. Res. 44 (12): W12431. https://doi.org/10.1029/2008WR007024.
Turgeon, A. 1981. “A decomposition method for the long-term scheduling of reservoirs in series.” Water Resour. Res. 17 (6): 1565–1570. https://doi.org/10.1029/WR017i006p01565.
Xu, W., P. Liu, L. Cheng, Y. Zhou, X. Xia, Y. Gong, and Y. Liu. 2021. “Multi-step wind speed prediction by combining a WRF simulation and an error correction strategy.” Renewable Energy 163 (1): 772–782.
Yi, J., J. W. Labadie, and S. Stitt. 2003. “Dynamic optimal unit commitment and loading in hydropower systems.” J. Water Resour. Plann. Manage. 129 (5): 388–398. https://doi.org/10.1061/(ASCE)0733-9496(2003)129:5(388).
Zhang, J., Z. Li, X. Wang, X. Lei, P. Liu, M. Feng, S. Khu, and H. Wang. 2019. “A novel method for deriving reservoir operating rules based on flood classification-aggregation-decomposition.” J. Hydrol. 568 (Jan): 722–734. https://doi.org/10.1016/j.jhydrol.2018.10.032.
Zhang, W., P. Liu, X. Chen, L. Wang, X. Ai, M. Feng, D. Liu, and Y. Liu. 2016. “Optimal operation of multi-reservoir systems considering time-lags of flood routing.” Water Resour. Manage. 30 (2): 523–540. https://doi.org/10.1007/s11269-015-1175-8.
Zhong, P., W. Zhang, and B. Xu. 2013. “A risk decision model of the contract generation for hydropower generation companies in electricity markets.” Electr. Power Syst. Res. 95 (Feb): 90–98. https://doi.org/10.1016/j.epsr.2012.06.016.
Zhou, Y., S. Guo, P. Liu, C.-Y. Xu, and X. Zhao. 2016. “Derivation of water and power operating rules for multi-reservoirs.” Hydrol. Sci. J. 61 (2): 359–370. https://doi.org/10.1080/02626667.2015.1035656.

Information & Authors

Information

Published In

Go to Journal of Water Resources Planning and Management
Journal of Water Resources Planning and Management
Volume 148Issue 2February 2022

History

Received: Mar 22, 2021
Accepted: Oct 14, 2021
Published online: Nov 30, 2021
Published in print: Feb 1, 2022
Discussion open until: Apr 30, 2022

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Ph.D. Student, State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan Univ., Wuhan 430072, China. Email: [email protected]
Professor, State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan Univ., Wuhan 430072, China (corresponding author). ORCID: https://orcid.org/0000-0002-3777-6561. Email: [email protected]
Professor, State Key Laboratory of Eco-hydraulics in Northwest Arid Region, Xi’an Univ. of Technology, Xi’an 710048, China. Email: [email protected]
Kangdi Huang [email protected]
Ph.D. Student, State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan Univ., Wuhan 430072, China. Email: [email protected]
Ph.D. Student, State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan Univ., Wuhan 430072, China. ORCID: https://orcid.org/0000-0002-2332-5364. Email: [email protected]
Engineer, Hubei Qingjiang Hydropower Development Co. Ltd., Dongshan Ave., Xiling District, Yichang 443000, China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Optimal dispatching rules of hydropower reservoir in flood season considering flood resources utilization: A case study of Three Gorges Reservoir in China, Journal of Cleaner Production, 10.1016/j.jclepro.2023.135975, 388, (135975), (2023).
  • A model coupling current non-adjustable, coming adjustable and remaining stages for daily generation scheduling of a wind-solar-hydro complementary system, Energy, 10.1016/j.energy.2022.125737, 263, (125737), (2023).
  • Impacts of Yield and Seasonal Prices on the Operation of Lancang Cascaded Reservoirs, Energies, 10.3390/en15093247, 15, 9, (3247), (2022).
  • Improving complementarity of a hybrid renewable energy system to meet load demand by using hydropower regulation ability, Energy, 10.1016/j.energy.2022.123535, 248, (123535), (2022).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share