Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head
Publication: Journal of Water Resources Planning and Management
Volume 138, Issue 3
Abstract
Construction of huge hydropower plants in the southern region of China has been rapidly increasing in recent years. These plants usually have multiple vibration zones of high head that have a great effect on short-term scheduling and real-time operations. This paper presents a novel approach for optimizing short-term scheduling of large-scale cascaded hydropower systems with multivibration zones of high head. For the purpose of cutting down peak loads, standard deviation minimization relevant to the remaining load series for thermal systems was chosen as the objective nonlinear function. Before the optimization, unit forbidden operation zones were identified by assembled mathematical techniques and hydro unit commitments were optimized using dynamic programming. The combined sets of forbidden operation zones and hydro unit commitments were repeatedly used during the search process. An optimization framework that combined the progressive optimality algorithm with a vibration zone avoidance strategy was finally presented to solve the short-term hydropower scheduling problem. The proposed methodology was applied to a case study in China and the results obtained indicate that it is able to not only handle complex constraints of multivibration zones, but also provide efficient and feasible solutions for short-term scheduling of large plants.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This work was supported in part by National Natural Science Foundation of China (No. 51025934, 50979010) and 973 Program (No. 2009CB226111). The authors would like to acknowledge the constructive comments of two anonymous reviewers and editors.
References
Catalão, J. P. S., Mariano, S. J. P. S., Mendes, V. M. F., and Ferreira, L. A. F. M. (2008). “Nonlinear optimization method for short-term hydro scheduling considering head-dependency.” Eur. Trans. Electr. Power, 20(2), 172–183.
Catalão, J. P. S., Mariano, S. J. P. S., Mendes, V. M. F., and Ferreira, L. A. F. M. (2009). “Scheduling of head-sensitive cascaded hydro systems: a nonlinear approach.” IEEE Trans. Power Syst.ITPSEG, 24(1), 337–346.
Cheng, C. T., Liao, S. L., Tang, Z. T., and Zhao, M. Y. (2009). “Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch.” Energy Convers. Manage.ECMADL, 50(12), 3007–3014.
Cheng, C.-T., Liao, S.-L., Wu, X.-Y., and Zhang, S.-Q. (2010). “Key Technologies to optimize operation system for large-scale hydropower stations in provincial power systems.” J. Hydraul. Eng., 41(4), 477–482 (in Chinese).
El-Hawary, M. E., and Ravindranath, K. M. (1992). “Hydro-thermal power flow scheduling accounting for head variations.” IEEE Trans. Power Syst.ITPSEG, 7(3), 1232–1238.
Finardi, E. C., and da Silva, E. L. (2005). “Unit commitment of single hydroelectric plant.” Electr. Power Syst. Res., 75(2-3), 116–123.EPSRDN
Finardi, E. C., and da Silva, E. L. (2006). “Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming.” IEEE Trans. Power Syst.ITPSEG, 21(2), 835–844.
Georgakakos, A. P., Yao, H., and Yu, Y. (1997a). “Control models for hydroelectric energy optimization.” Water Resour. Res.WRERAQ, 33(10), 2367–2379.
Georgakakos, A. P., Yao, H., and Yu, Y. (1997b). “Control model for hydroelectric energy-value optimization.” J. Water Resour. Plann. Manage.JWRMD5, 123(1), 30–38.
Guan, X., Svoboda, A., and Li, C.-A. (1999). “Scheduling hydro power systems with restricted operating zones and discharge ramping constraints.” IEEE Trans. Power Syst.ITPSEG, 14(1), 126–131.
Howson, H. R., and Sancho, N. G. F. (1975). “A new algorithm for the solution of multi-state dynamic programming problems.” Math. Program.MHPGA4, 8(1), 104–116.
Johannesen, A., Gjelsvik, A., Fosso, O. B., and Flatabo, N. (1991). “Optimal short term hydro scheduling including security constraints.” IEEE Trans. Power Syst.ITPSEG, 6(2), 576–583.
Labadie, J. W. (2004). “Optimal operation of multireservoir systems: State-of-the-art review.” J. Water Resour. Plann. Manage.JWRMD5, 130(2), 93–111.
Lucas, N. J. D., and Perera, P. J. (1985). “Short-term hydroelectric scheduling using the progressive optimality algorithm.” Water Resour. Res.WRERAQ, 21(9), 1456–1458.
Mariño, M. A., and Loaiciga, H. A. (1985a). “Dynamic model for multireservoir operation.” Water Resour. Res.WRERAQ, 21(5), 619–630.
Mariño, M. A., and Loaiciga, H. A. (1985b). “Quadratic model for reservoir management: Application to the Central Valley Project.” Water Resour. Res.WRERAQ, 21(5), 631–641.
Momoh, J. A., Adapa, R., and El-Hawary, M. E. (1999a). “A review of selected optimal power flow literature to 1993, Part I: Nonlinear and quadratic programming approaches.” IEEE Trans. Power Syst.ITPSEG, 14(1), 96–104.
Momoh, J. A., El-Hawary, M. E., and Adapa, R. (1999b). “A review of selected optimal power flow literature to 1993. II. Newton, linear programming and interior point methods.” IEEE Trans. Power Syst.ITPSEG, 14(1), 105–111.
Nanda, J., and Bijwe, P. R. (1981). “Optimal hydrothermal scheduling with cascaded plants using progressive optimality algorithm.” IEEE Trans. Power Appar. Syst.IEPSA9, PAS-100(4), 2093–2099.
Nanda, J., Bijwe, P. R., and Kothari, D. P. (1986). “Application of progressive optimality algorithm to optimal hydrothermal scheduling considering deterministic and stochastic data.” Int. J. Electr. Power Energy Syst., 8(1), 61–64.
Naresh, R., and Sharma, J. (2000). “Hydro system scheduling using ANN approach.” IEEE Trans. Power Syst.ITPSEG, 15(1), 388–395.
Ponnambalam, K., Karray, F., and Mousavi, S. J. (2003). “Minimizing variance of reservoir systems operations benefits using soft computing tools.” Fuzzy Sets Syst.FSSYD8, 139(2), 451–461.
Piekutowski, M. Litwinowicz, T., and Frowd, R. J. (1994). “Optimal short-term scheduling for a large-scale cascaded hydro system.” IEEE Trans. Power Syst.ITPSEG, 9(2), 805–811.
Shawwash, Z. K., Siu, T. K., and Russell, D. (2000). “The B. C. Hydro short term hydro scheduling optimization model.” IEEE Trans. Power Syst.ITPSEG, 15(3), 1125–1131.
Simonovic, S. P. (1992). “Reservoir systems analysis: Closing gap between theory and practice.” J. Water Resour. Plann. Manage.JWRMD5, 118(3), 262–280.
Teegavarapu, R. S. V., and Simonovic, S. P. (2000). “Short-term operation model for coupled hydropower reservoirs.” J. Water Resour. Plann. Manage.JWRMD5, 126(2), 98–106.
Tejada-Guibert, J. A., Stedinger, J. R., and Staschus, K. (1990). “Optimization of value of CVP's hydropower production.” J. Water Resour. Plann. Manage.JWRMD5, 116(1), 52–70.
Turgeon, A. (1981). “Optimal short-term hydro scheduling from the principle of progressive optimality.” Water Resour. Res.WRERAQ, 17(3), 481–486.
Wurbs, R. A. (1993). “Reservoir-system simulation and optimization models.” J. Water Resour. Plann. Manage.JWRMD5, 119(4), 455–472.
Xi, E., Guan, X., and Li, R. (1999). “Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs.” IEEE Trans. Power Syst.ITPSEG, 14(3), 1127–1132.
Yeh, W. W.-G. (1985). “Reservoir management and operations models: A state-of—the-art review.” Water Resour. Res.WRERAQ, 21(12), 1797–1818.
Yi, J., Labadie, J. W., and Stitt, S. (2003). “Dynamic optimal unit commitment and loading in hydropower systems.” J. Water Resour. Plann. Manage.JWRMD5, 129(5), 388–398.
Information & Authors
Information
Published In
Copyright
© 2012. American Society of Civil Engineers.
History
Received: Jan 19, 2011
Accepted: Jul 8, 2011
Published online: Jul 11, 2011
Published in print: May 1, 2012
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.