Hazard-Based Analysis of Highway Project Development Times
Publication: Journal of Transportation Engineering
Volume 138, Issue 10
Abstract
Transport agencies around the world recognize the importance of on-time on-budget delivery of highway projects and understand the need for an efficient transport development process. Past studies of highway project duration and cost estimation were focused on construction, and few studies have focused on preconstruction project delivery from an agency’s perspective. This paper proposes the use of hazard-based duration models for investigating the potential risk factors that could affect project development time from planning to letting. A database containing over 35 years of highway project data from the state of Indiana was used to develop appropriate models. Of the three model forms (Weibull, Weibull with gamma heterogeneity, and log-logistic) considered in the paper, it was found that the log-logistic model is the most appropriate for modeling project development time. For each work category (pavement, bridge, and road/interchange projects), risk factors were identified, and their influences on project development time (and consequently, on letting time) were investigated. The developed hazard-based duration models were further applied to demonstrate their ability to predict expected project development time for delivery and the project-related factors that influence this duration, thereby providing the agency with a useful interpretation of associated delivery risks.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This study was conducted under the Joint Transportation Research Program. The authors acknowledge the support of the Federal Highway Administration and the Indiana Department of Transportation. The contents of this paper reflect the views of the authors, who are responsible for the facts and the accuracy of the data presented. The contents do not necessarily reflect the official views or policies of the Indiana Department of Transportation or the Federal Highway Administration. This paper does not constitute a standard, specification, or regulation.
References
Anastsopoulous, P. Ch., Labi, S., Bhargava, A., Bordat, C., and Mannering, F. L. (2010a). “Frequency of change orders in highway construction using alternate count-data modeling Methods.” J. Constr. Eng. Manage., 136(8), 886–893.
Anastsopoulous, P. Ch., Labi, S., McCullouch, B. G., Karlaftis, M. G., and Moavenzadeh, F. (2010b). “Influence of highway project characteristics on contract type selection.” J. Infrastruct. Syst., 16(4), 323–333.
Anderson, S. D., and Blaschke, B. C. (2004). “State Highway Letting Program Management.”, Transportation Research Board, Washington, DC.
Bordat, C., Labi, S., McCullouch, B., and Sinha, K. C. (2004). “An analysis of cost overruns and time delays of INDOT projects.”, Purdue Univ., West Lafayette, IN.
DeWitt, S., et al. (2005). “Construction management practices in Canada and Europe.”, Federal Highway Administration, U.S. Dept. of Transportation, Washington, DC.
Federal Highway Administration (FHWA). (2010). “Project delivery.” Innovative Program Delivery Office, 〈〉 (Dec. 25, 2010).
Fitzpatrick, V., and Sinha, K. C. (2010). “An assessment of delivery risk in transportation projects.”, Joint Transportation Research Program, Purdue Univ., West Lafayette, IN.
Gkritza, K., and Labi, S. (2008). “Estimating cost discrepancies in highway contracts: A multistep econometric approach.” J. Constr. Eng. Manage., 134(12), 953–962.
Gourieroux, C., Monfort, A., and Trogon, A. (1984). “Pseudo maximum likelihood methods: Theory.” Econometrica: J. Economet. Soc., 52(3), 681–700.
Greene, W. H. (2008). Econometric Analysis, 6th Ed., Pearson, NJ.
Heckman, J., and Singer, B. (1984). “A method for minimizing the impact of distributional assumptuons on econometric models for duration data.” Econometrica: J. Economet. Soc., 52(2), 271–320.
Hegab, M. Y., and Smith, G. R. (2007). “Delay time analysis in Microtunneling Projects.” J. Constr. Eng. Manage., 133(2), 191–195.
Hendrickson, C., Martinelli, D., and Rehak, D. (1987). “Hierarchial rule-based activity duration estimation.” J. Constr. Eng. Manage., 113(2), 288–301.
Hoffman, G. J., Thal, A. E., Timothy, S., and Weir, J. D. (2007). “Estimating performance time for construction projects.” J. Manage. Eng., 23(4), 193–199.
Indiana Department of Transportation. (2007). “INDOT 2030 Long range transportation plan 2007 update.” Office of Urban and Corridor Planning, Indiana Dept. of Transportation, Indianapolis, IN.
Kicinski, G., and Mroczka, G. (2006). “Project development process for major and minor projects.” Proc., 92nd Purdue Road School, Purdue Univ., West Lafayette, IN.
Mickelson, R. P. (1998). “Transportation Development Process.”, Transportation Research Board, Washington, DC.
Nam, D., and Mannering, F. L. (2000). “Hazard based analysis of highway incident duration.” Transport. Res. Part A: Policy and Practice, 34(2), 85–102.
Nassar, K. M., Gunnarsson, H. G., and Hegab, M. Y. (2005). “Using Weibull analysis for evaluation of cost and schedule performance.” J. Constr. Eng. Manage., 131(12), 1257–1262.
O’Connor, J. T., O’Brien, W., Sohn, T., and Azambuja, M. (2008). “Findings on determining durations of right-of-way acquisition and utility adjustment on highway projects.”, Texas Dept. of Transportation, Austin, TX.
Sinha, K. C., and Labi, S. (2007). Transportation decision making: Principles of project evaluation and programming, Wiley, New York.
Sukumaran, P., Bayraktar, M. E., Hong, T. H., and Hastak, M. (2006). “Model for analysis affecting construction schedule in highway work zones.” J. Transport. Eng., 132(6), 508–517.
U.S. Government Accountability Office (GAO). (2005). “Federal Aid Highways: FHWA needs a comprehensive approach to improving project oversight.”, Washington, DC.
Washington, S., Karlaftis, M., and Mannering, F. (2011). Statistical and Econometric Methods for Transportation Data Analysis, 2nd Ed., Chapman & Hall/CRC, Boca Raton, FL.
Zhong, M., and Hunt, J. D. (2010). “Exploring best-fit hazard functions and lifetime regression models for urban weekend activities: Case study” J. Transport. Eng., 136(3), 255–266.
Information & Authors
Information
Published In
Copyright
© 2012 American Society of Civil Engineers.
History
Received: Aug 16, 2011
Accepted: Mar 6, 2012
Published online: Mar 8, 2012
Published in print: Oct 1, 2012
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.