Prediction of Transfer Lengths Inclusive of Conventional and High-Strength Strands
This article has been corrected.
VIEW CORRECTIONPublication: Journal of Structural Engineering
Volume 146, Issue 9
Abstract
Twelve concrete prisms pretensioned with 2,400-MPa strands were fabricated to investigate the effects of initial prestress (), concrete compressive strength at prestress release (), and the spacing of the lateral confining reinforcement () on the transfer length. Test results showed that the transfer length increased with an increase in and with decreases in and confinement level. A theoretical model incorporating rigid–linear local bond-slip relationships was developed and validated by its reasonable predictions of the distributions of the measured concrete strains in the transfer region. Based on the theoretical model, predictive formulas of transfer length were derived for both conventional and high-strength strands.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This research was supported by a Chung-Ang University research grant in 2019.
References
ACI (American Concrete Institute). 2014. Building code requirements for structural concrete (ACI 318-14) and commentary. ACI 318. Farmington Hills, MI: ACI.
BSI (British Standards Institution). 2004. Eurocode 2: Design of concrete structures. Part 1-1: General common rules for building and civil engineering structures. BS EN 1992-1-1. Chapter 8.10.2. London: BSI.
Carroll, J. C., T. E. Cousins, and C. L. Roberts-Wollmann. 2017. “The use of grade 300 prestressing strand in pretensioned, prestressed concrete beams.” PCI J. 62 (1): 49–65.
Dang, C. N., C. D. Murray, R. W. Floyd, W. M. Hale, and J. R. Martí-Vargas. 2014. “Analysis of bond stress distribution for prestressing strand by standard test for strand bond.” Eng. Struct. 72 (Aug): 152–159. https://doi.org/10.1016/j.engstruct.2014.04.040.
Den Uijl, J. A. 1998. “Bond modeling of prestressing strand.” In Bond and development of reinforcement, SP-180, edited by R. Leon, 145–169. Farmington Hills, MI: American Concrete Institute.
Han, S. J., D. H. Lee, S. H. Cho, S. B. Ka, and K. S. Kim. 2016a. “Estimation of transfer lengths in precast pretensioned concrete members based on a modified thick-walled cylinder model.” Struct. Concr. 17 (1): 52–62. https://doi.org/10.1002/suco.201500049.
Han, S. J., D. H. Lee, J. Y. Oh, K. S. Kim, and S. T. Yi. 2016b. “Transfer lengths of pretensioned concrete members reinforced with 2400 MPa high-strength prestressing tendons.” Comput. Concr. 18 (4): 779–792. https://doi.org/10.12989/cac.2016.18.6.779.
Janney, J. R. 1954. “Nature of bond in pretensioned prestressed concrete.” ACI J. 50 (9): 717–736.
Kaar, P. H., R. W. LaFraugh, and M. A. Mass. 1963. “Influence of concrete strength on strand transfer length.” PCI J. 8 (5): 47–67. https://doi.org/10.15554/pcij.10011963.47.67.
Kim, J. K., T. R. Seong, K. P. Jang, and S. H. Kwon. 2013. “Tensile behavior of new 2,200 MPa and 2,400 MPa strands according to various types of mono anchorage.” Struct. Eng. Mech. 47 (3): 383–399. https://doi.org/10.12989/sem.2013.47.3.383.
Kim, J. K., J. M. Yang, and H. J. Yim. 2016. “Experimental evaluation of transfer length in pretensioned concrete beams using 2,400-MPa prestressed strands.” J. Struct. Eng. 142 (11): 04016088. https://doi.org/10.1061/(ASCE)ST.1943-541X.0001567.
Lee, C., S. Lee, and S. Shin. 2017. “Modeling of transfer region with local bond-slip relationships.” ACI Struct. J. 114 (1): 187–196. https://doi.org/10.14359/51689253.
Lee, J. K. 2018. “Estimated transfer lengths of 0.6 in.(15.4 mm) grade 350 (2400 MPa) strands in high-strength concrete pretensioned members.” ACI Struct. J. 115 (3): 649–659. https://doi.org/10.14359/51701108.
Marti-Vargas, J. R., P. Serna, J. Navarro-Gregori, and J. L. Bonet. 2012. “Effects of concrete composition on transmission length of prestressing strands.” Constr. Build. Mater. 27 (1): 350–356. https://doi.org/10.1016/j.conbuildmat.2011.07.038.
Martí-Vargas, J. R., L. A. Caro, and P. Serna-Ros. 2014a. “Size effect on strand bond and concrete strains at prestress transfer.” ACI Struct. J. 111 (2): 419–429. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000456.
Martí-Vargas, J. R., and W. M. Hale. 2013. “Predicting strand transfer length in pretensioned concrete: Eurocode versus North American practice.” J. Bridge Eng. 18 (12): 1270–1280. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000456.
Martí-Vargas, J. R., W. M. Hale, E. García-Taengua, and P. Serna. 2014b. “Slip distribution model along the anchorage length of prestressing strands.” Eng. Struct. 59 (Feb): 674–685. https://doi.org/10.1016/j.engstruct.2013.11.032.
Mitchell, D., W. D. Cook, A. A. Khan, and T. Tham. 1993. “Influence of high strength concrete on transfer and development length of pretensioning strand.” PCI J. 38 (3): 52–66. https://doi.org/10.15554/pcij.05011993.52.66.
Oh, B. H., E. S. Kim, and Y. C. Choi. 2006. “Theoretical analysis of transfer lengths in pretensioned prestressed concrete members.” J. Eng. Mech. 132 (10): 1057–1066. https://doi.org/10.1061/(ASCE)0733-9399(2006)132:10(1057).
Oh, B. H., S. N. Lim, M. K. Lee, and S. W. Yoo. 2012. “Analysis and prediction of transfer length in pretensioned, prestressed concrete members.” ACI Struct. J. 111 (3): 549–559. https://doi.org/10.14359/51686571.
Park, H., and J. Y. Cho. 2014. “Bond-slip-strain relationship in transfer zone of pretensioned concrete elements.” ACI Struct. J. 111 (3): 503–513. https://doi.org/10.14359/51686567.
Park, H., Z. U. Din, and J. Y. Cho. 2012. “Methodological aspects in the measurement of strand transfer length in pretensioned concrete.” ACI Struct. J. 109 (5): 625–634.
Ramirez, J. A., and B. W. Russell. 2008. Transfer, development, and splice length for strand/reinforcement in high-strength concrete. Washington, DC: Transportation Research Board.
Russell, B. W., and N. H. Burns. 1993. Design guidelines for transfer, development and debonding of large diameter seven wire strands in pretensioned concrete girders. FHWA/TX-93+1210-5F. Austin, TX: Center for Transportation Research, Univ. of Texas at Austin.
Russell, B. W., and N. H. Burns. 1997. “Measurement of transfer lengths on pretensioned concrete elements.” J. Struct. Eng. 123 (5): 541–549. https://doi.org/10.1061/(ASCE)0733-9445(1997)123:5(541).
Torre-Casanova, A., L. Jason, L. Davenne, and X. Pinelli. 2013. “Confinement effects on the steel-concrete bond strength and pull-out failure.” Eng. Fract. Mech. 97 (Jan): 92–104. https://doi.org/10.1016/j.engfracmech.2012.10.013.
Yang, J. M., H. J. Yim, and J. K. Kim. 2016. “Transfer length of 2400 MPa seven-wire 15.2 mm steel strands in high-strength pretensioned prestressed concrete beam.” Smart Struct. Syst. 17 (4): 577–591. https://doi.org/10.12989/sss.2016.17.4.577.
Zia, P., and T. Mostafa. 1977. “Development length of prestressing strands.” PCI J. 22 (5): 54–65. https://doi.org/10.15554/pcij.09011977.54.65.
Information & Authors
Information
Published In
Copyright
©2020 American Society of Civil Engineers.
History
Received: Nov 1, 2018
Accepted: Apr 8, 2020
Published online: Jun 29, 2020
Published in print: Sep 1, 2020
Discussion open until: Nov 29, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.