Practical Solutions for Concurrent Excavation of Neighboring Mega Basements Closely Surrounded by Utility Tunnels in Shanghai Hongqiao CBD
Publication: Practice Periodical on Structural Design and Construction
Volume 24, Issue 4
Abstract
The design and construction of four 15.3-m-deep neighboring basements in the Hongqiao Central Business District (CBD) in Shanghai, China, were made challenging by the mega excavation sizes () and the presence of pre-existing utility tunnels nearby. To safeguard the project, save project costs, and reduce construction duration, innovative design and construction solutions were implemented, which included composite earth supporting systems, comprehensive ground treatments, zoned construction methods, special soil removal and disposal procedures, and long-term field monitoring. Benefiting from these composite design and construction solutions, the existing utility tunnels underwent very limited lateral displacement, and their maximum settlements were just one third of the magnitudes estimated before construction. Several key findings were obtained: (1) zoned construction methods, combining zoned soil-removal and strut-casting procedures, proved to be cost effective for the concurrent excavation of mega basement groups; (2) by avoiding side-by-side excavation, adverse superimposing effects deriving from concurrent excavations were remarkably mitigated; (3) the left-in-place earth supporting structures for construction of utility tunnels helped restrain lateral tunnel displacement; and (4) if the soft subgrade below utility tunnels had been improved prior to the adjacent excavations, tunnel settlements could have been reduced significantly. The optimum treatment depth for the soft subgrade below utility tunnels should extend below the elevation at which the maximum lateral displacement of the adjacent multipropped retaining wall occurred.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
Financial support from the National Natural Science Foundation of China (Grant Nos. 41877286 and 41672269) and the National Basic Research Program (973 Program) (Grant No. 2015CB057800) is gratefully acknowledged. The comments and suggestions from the anonymous reviewer, the associate editor, and the editor in chief are sincerely appreciated.
References
Brinkgreve, R. B. J., et al. 2002. PLAXIS finite element code for soil and rock analyses. Rotterdam, Netherlands: A.A. Balkema.
Liu, J. H., and X. Y. Hou. 1997. Excavation engineering handbook. [In Chinese.] Beijing: Chinese Construction Industry.
Lu, Y., Y. Tan, and H. Lan. 2019. “Full-scale load testing of 75-90-m-long post-grouted drilled shafts in Suzhou stiff clay.” J. Test. Eval. 47 (1): 284–309. https://doi.org/10.1520/JTE20170442.
Ou, C. Y. 2006. Deep excavation: Theory and practice. London: Taylor & Francis Group.
Qiao, Y. F., and F. L. Peng. 2016. “Lessons learnt from urban underground space use in Shanghai: From Lujiazui Business District to Hongqiao Central Business District.” Tunnelling Underground Space Technol. 55: 308–319. https://doi.org/10.1016/j.tust.2015.12.001.
Shanghai Urban and Rural Construction and Management Committee. 2010. Technical code for excavation engineering. DG/TJ08-61. Shanghai, China: Shanghai Urban and Rural Construction and Management Committee.
Shen, S. L., Q. L. Cui, C. E. Ho, and Y. S. Xu. 2016. “Ground response to multiple parallel microtunneling operations in cemented silty clay and sand.” J. Geotech. Geoenviron. Eng. 142 (5): 04016001. https://doi.org/10.1061/(ASCE)GT.1943-5606.0001441.
Tan, Y., R. Huang, Z. Kang, and B. Wei. 2016. “Covered semi-top-down excavation of subway station surrounded by closely spaced buildings in downtown Shanghai: Building response.” J. Perform. Constr. Facil. 30 (6): 04016040. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000892.
Tan, Y., W. Jiang, W. Luo, Y. Lu, and C. Xu. 2018a. “Longitudinal sliding event during excavation of Feng-Qi Station of Hangzhou Metro Line 1: Postfailure investigation.” J. Perform. Constr. Facil. 32 (4): 04018039. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001181.
Tan, Y., and M. Li. 2011. “Measured performance of a 26 m deep top-down excavation in downtown Shanghai.” Can. Geotech. J. 48 (5): 704–719. https://doi.org/10.1139/t10-100.
Tan, Y., X. Li, Z. Kang, J. Liu, and Y. Zhu. 2015a. “Zoned excavation of an oversized pit close to an existing metro line in stiff clay: Case study.” J. Perform. Constr. Facil. 29 (6): 04014158. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000652.
Tan, Y., and Y. Lu. 2017a. “Forensic diagnosis of a leaking accident during excavation.” J. Perform. Constr. Facil. 31 (5): 04017061. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001058.
Tan, Y., and Y. Lu. 2017b. “Why excavation of a small air shaft caused excessively large displacements: Forensic investigation.” J. Perform. Constr. Facil. 31 (2): 04016083. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000947.
Tan, Y., and Y. Lu. 2018. “Responses of shallowly buried pipelines to adjacent deep excavations in Shanghai soft ground.” J. Pipeline Syst. Eng. Pract. 9 (2): 05018002. https://doi.org/10.1061/(ASCE)PS.1949-1204.0000310.
Tan, Y., Y. Lu, and D. Wang. 2018b. “Deep excavation of the Gate of the Orient in Suzhou stiff clay: Composite earth-retaining systems and dewatering plans.” J. Geotech. Geoenviron. Eng. 144 (3): 05017009. https://doi.org/10.1061/(ASCE)GT.1943-5606.0001837.
Tan, Y., Y. Lu, C. Xu, and D. Wang. 2018c. “Investigation on performance of a large circular pit-in-pit excavation in clay-gravel-cobble mixed strata.” Tunnelling Underground Space Technol. 79: 356–374. https://doi.org/10.1016/j.tust.2018.06.023.
Tan, Y., and D. Wang. 2013a. “Characteristics of a large-scale deep foundation pit excavated by the central-island technique in Shanghai soft clay. I: Bottom-up construction of the central cylindrical shaft.” J. Geotech. Geoenviron. Eng. 139 (11): 1875–1893. https://doi.org/10.1061/(ASCE)GT.1943-5606.0000928.
Tan, Y., and D. Wang. 2013b. “Characteristics of a large-scale deep foundation pit excavated by the central-island technique in Shanghai soft clay. II: Top-down construction of the peripheral rectangular pit.” J. Geotech. Geoenviron. Eng. 139 (11): 1894–1910. https://doi.org/10.1061/(ASCE)GT.1943-5606.0000929.
Tan, Y., D. Wang, Y. Lu, and T. Fang. 2017a. “Excavation of Middle Huai-Hai Road Station of Shanghai Metro Line 13: Challenges, risks, countermeasures and performance assessment.” Pract. Period. Struct. Des. Constr. 22 (3): 05017003. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000320.
Tan, Y., and B. Wei. 2012. “Observed behavior of a long and deep excavation constructed by cut-and-cover technique in Shanghai soft clay.” J. Geotech. Geoenviron. Eng. 138 (1): 69–88. https://doi.org/10.1061/(ASCE)GT.1943-5606.0000553.
Tan, Y., B. Wei, Y. Lu, and B. Yang. 2019. “Is basal reinforcement essential for long and narrow subway excavation bottoming out in Shanghai soft clay?” J. Geotech. Geoenviron. Eng. 145 (5): 05019002. https://doi.org/10.1061/(ASCE)GT.1943-5606.0002028.
Tan, Y., B. Wei, X. Zhou, and Y. Diao. 2015b. “Lessons learned from construction of Shanghai metro stations: Importance of quick excavation, prompt propping, timely casting and segmented construction.” J. Perform. Constr. Facil. 29 (4): 04014096. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000599.
Tan, Y., H. Zhu, F. Peng, K. Karlsrud, and B. Wei. 2017b. “Characterization of semi-top-down excavation for subway station in Shanghai soft ground.” Tunnelling Underground Space Technol. 68: 244–261. https://doi.org/10.1016/j.tust.2017.05.028.
Wang, Z. F., S. L. Shen, and G. Modoni. 2019. “Enhancing discharge of spoil to mitigate disturbance induced by horizontal jet grouting in clayey soil: Theoretical model and application.” Comput. Geotech. 111: 222–228. https://doi.org/10.1016/j.compgeo.2019.03.012.
Wu, Y. X., H. M. Lyu, J. Han, and S. L. Shen. 2019. “Dewatering-induced building settlement around a deep excavation in soft deposit in Tianjin, China.” J. Geotech. Geoenviron. Eng. 145 (5): 05019003. https://doi.org/10.1061/(ASCE)GT.1943-5606.0002045.
Wu, Y. X., J. S. Shen, W. C. Cheng, and T. Hino. 2017. “Semi-analytical solution to pumping test data with barrier, wellbore storage, and partial penetration effects.” Eng. Geol. 226: 44–51. https://doi.org/10.1016/j.enggeo.2017.05.011.
Zhang, Z. J., M. G. Li, J. J. Chen, J. H. Wang, and F. Y. Zeng. 2017. “Innovative construction method for oversized excavations with bipartition walls.” J. Constr. Eng. Manage. 143 (8): 04017056. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001357.
Information & Authors
Information
Published In
Copyright
©2019 American Society of Civil Engineers.
History
Received: Sep 19, 2018
Accepted: Mar 12, 2019
Published online: Aug 2, 2019
Published in print: Nov 1, 2019
Discussion open until: Jan 2, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.