Formwork is a major contributor to profitability—or the lack of it—on most large and complex concrete jobs. Furthermore, formwork has major consequences for the project schedule, as well as all related trades, such as ironworkers and cement finishers. Consequently, selecting a formwork system and planning its field operations must consider the effects of the system on the overall project. However, due to competitive pressures and limited recourses, contractors seldom have the time to think through the construction phase specifics, and enter bids with carryover estimates adjusted for inflation. This may result in significant difficulties in meeting the project requirements. The paper illustrates the complexities involved in the selection and deployment of a formwork system through a study of the concrete formwork selection on the Bird Island Flats Tunnel project. This $290 million project was a part of the Central Artery/Tunnel project in Boston, Massachusetts. Because the conventional shoring methods could not produce the output needed to meet the project schedule and budget, the contractor solicited proposals from formwork manufacturers and chose the system from CONESCO Industries. This study has two objectives: first to identify the issues involved in the selection and sequencing of a custom-made formwork system and second to formulate a detailed analysis method to improve decision-making. The study shows that the planning of the formwork method involves two important decisions: First, the selection of a formwork system, and second the decisions regarding the sequencing and quantities of the formwork to be used on the project. The study presents the quantity/cost analysis for selecting a formwork system, and then illustrates the value of simulation in optimizing the sequencing scheme for the formwork operations. The study shows that indirect project cost plays an important role in the overall analysis, and that selection and sequencing of a formwork system can be improved using a time-cost trade-off technique.

Get full access to this article

View all available purchase options and get full access to this article.

References

Doka Systems. (2008). ⟨www.doka.com⟩ (June 2008).
ENR. (1995). “State awards contract after 3-months hiatus.” 25–26.
Hurd, H. L. (1994a). “Massive tunnel under runway built to support jet aircraft: Innovative forming system improve construction efficiency and save costs.” Concr. Constr., 184–187.
Hurd, M. K. (1991). “Aluminum wall forms speed pour down for high-rise buildings.” Concr. Constr., 818–822.
Hurd, M. K. (1993a). “Avoiding form failures.” Concr. Constr., 683–686.
Hurd, M. K. (1993b). “Nonmetallic form ties.” Concr. Constr., 695–699.
Hurd, M. K. (1994b). “Coping with formwork specifications: Read carefully and ask questions early.” Concr. Constr., 870–876.
Koski, J. A. (1993). “Building a concrete tunnel-one piece at a time.” Concr. Constr., 407–413.
Martinez, J. C. (1996). “STROBOSCOPE: State and resource based simulation of construction processes.” Ph.D. dissertation, Univ. of Michigan, Ann Arbor, Mich.
NOVA. (1995). “CONESCO corporation documents.” NOVA award nominations, Construction Innovation Forum.
Peurifoy, R. L., and Oberlender, G. D. (1996). Formwork for concrete structures, McGraw-Hill, New York.
Proverbs, D. G., Holt, G. D., and Olomolaiye, P. O. (1999). “Factors in formwork selection: A comparative investigation.” Build. Res. Inf., 27(2), 109–119.
Tam, C. M., Tong, T., Lau, T., and Chan, K. K. (2005). “Selection of vertical formwork system by probabilistic neural networks models.” Construction Management and Economics, 23(3), 245–254.

Information & Authors

Information

Published In

Go to Practice Periodical on Structural Design and Construction
Practice Periodical on Structural Design and Construction
Volume 14Issue 4November 2009
Pages: 224 - 241

History

Received: Aug 6, 2008
Accepted: Oct 20, 2008
Published online: Mar 24, 2009
Published in print: Nov 2009

Permissions

Request permissions for this article.

Authors

Affiliations

Tariq Abdelhamid, Ph.D. [email protected]
Construction Management Program, School of Planning, Design and Construction, Michigan State Univ., 116, Human Ecology, East Lansing, MI 48824-1030 (corresponding author). E-mail: [email protected]
Mohamed El-Gafy, Ph.D.
P.E.
Construction Management Program, School of Planning, Design and Construction, Michigan State Univ., 114, Human Ecology, East Lansing, MI 48824-1030.
Panagiotis Mitropoulos, Ph.D.
Del E. Webb School of Construction, Arizona State Univ., Main Campus, P.O. Box 0204, Tempe, AZ 85287-0204.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share