Assessing the Impact of Construction Risks on Cost Overruns: A Risk Path Simulation–Driven Approach

Publication: Journal of Management in Engineering
Volume 38, Issue 6

Abstract

The lack of effective and comprehensive risk identification leads to ineffective risk management, which accordingly leads to failure in achieving project goals. Previous research efforts related to simulating risks in construction projects mostly have been limited to viewing risks as segregated factors, and thus providing static analysis. This paper addressed this knowledge gap through a risk path simulation–driven approach that addresses construction risks as a continuum of risk sources, events, and project characteristics. The authors (1) identified 131 construction project risks by conducting an extensive literature review, (2) designed a risk path by analyzing risk paths available in the literature, capitalizing on identified benefits, and avoiding drawbacks, (3) conducted a project-based survey to collect data from 53 construction projects related to the magnitude and impact of occurrence of the identified risks on cost overruns, (4) developed a series of two genetic algorithm (GA) models and one artificial neural network (ANN) model to quantify the impact of construction risks on cost overruns, and (5) created an ontology model to facilitate data structuring and retrieval. An ontology is a data modeling tool used to represent unstructured information into structured forms. Results show that 80% of the risks identified in this research were found to have a significant impact on cost overruns, and 89% can be recognized at project initiation. The contribution of this framework lies in its ability to represent the cost impact of a chain of conditions and events, rather than a single-point risk factor using GA and ANN modeling techniques. The proposed framework may help industry practitioners assess the impact of significant construction risks on cost overruns.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request.

Acknowledgments

The authors thank Dr. Islam H. El-adaway for his insights and comments that greatly improved the manuscript. The authors also express their gratitude to Sherin Elzeiny, Eng. Sherif Elbashbishy, and Dana Elbashbishy for their support during the course of this research.

References

Ahmed, M. M., M. Georgy, and H. Osman. 2014. “Ontology-based investigation of construction delay analysis methodologies in Egypt.” In Proc., Construction Research Congress 2014. Reston, VA: ASCE. https://doi.org/10.1061/9780784413517.146.
Alsharqawi, M., S. Abu Dabous, T. Zayed, and S. Hamdan. 2021. “Budget optimization of concrete bridge decks under performance-based contract settings.” J. Constr. Eng. Manage. 147 (6): 04021040. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002043.
Asghari, V., S. C. Hsu, and H. H. Wei. 2021. “Expediting life cycle cost analysis of infrastructure assets under multiple uncertainties by deep neural networks.” J. Manage. Eng. 37 (6): 04021059. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000950.
Assaad, R., and M. A. Abdul-Malak. 2020. “Legal perspective on treatment of delay liquidated damages and penalty clauses by different jurisdictions: Comparative analysis.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (2): 04520013. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000387.
Bedford, T., J. Quigley, and L. Walls. 2006. “Expert elicitation for reliable system design.” Stat. Sci. 21 (4): 428–450.
Beltrão, L. M. P., and M. T. P. Carvalho. 2019. “Prioritizing construction risks using fuzzy AHP in Brazilian public enterprises.” J. Constr. Eng. Manage. 145 (2): 05018018. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001606.
Bing, L., A. Akintoye, P. Edwards, and C. Hardcastle. 2005. “The allocation of risk in PPP/PFI construction projects in the UK.” Int. J. Project Manage. 23 (1): 25–35. https://doi.org/10.1016/j.ijproman.2004.04.006.
Cárdenas, I. C., S. S. H. Al-jibouri, J. I. M. Halman, and F. A. van Tol. 2012. “Capturing and integrating knowledge for managing risks in tunnel works.” Risk Anal. 33 (1): 92–108. https://doi.org/10.1111/j.1539-6924.2012.01829.x.
Charkhakan, M. H., and G. Heravi. 2018. “Risk manageability assessment to improve risk response plan: Case study of construction projects in Iran.” J. Constr. Eng. Manage. 144 (11): 05018012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001562.
Chou, J.-S., and D. Pramudawardhani. 2015. “Cross-country comparisons of key drivers, critical success factors and risk allocation for public-private partnership projects.” Int. J. Project Manage. 33 (5): 1136–1150. https://doi.org/10.1016/j.ijproman.2014.12.003.
Cochran, W. G. 1977. Sampling techniques. New York: Wiley.
Ding, L. Y., B. T. Zhong, S. Wu, and H. B. Luo. 2016. “Construction risk knowledge management in BIM using ontology and semantic web technology.” Saf. Sci. 87 (Aug): 202–213. https://doi.org/10.1016/j.ssci.2016.04.008.
Dursun, O., and C. Stoy. 2016. “Conceptual estimation of construction costs using the multistep ahead approach.” J. Constr. Eng. Manage. 142 (9): 04016038. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001150.
Elbashbishy, T. S., A. F. Waly, O. A. Hosney, and E. M. Dorra. 2019. “Addressing cost overruns through risk path modeling.” In Proc., CSCE 2019 Annual Conf. Montréal: Canadian Society of Civil Engineers.
Fan, S.-L., I.-C. Yeh, and W.-S. Chi. 2021. “Improvement in estimating durations for building projects using artificial neural network and sensitivity analysis.” J. Constr. Eng. Manage. 147 (7): 04021050. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002036.
Fidan, G., I. Dikmen, M. Tanyer, and T. Birgonul. 2011. “Ontology for relating risk and vulnerability to cost overrun in international projects.” J. Comput. Civ. Eng. 25 (4): 302–315. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000090.
Flyvbjerg, B., M. S. Holm, and S. Buhl. 2002. “Underestimating costs in public works projects: Error or lie?J. Am. Plann. Assoc. 68 (3): 279–295. https://doi.org/10.1080/01944360208976273.
Garg, S., and S. Misra. 2021. “Distribution of rework issues in various reinforced concrete building components.” J. Perform. Constr. Facil. 35 (4): 04021033. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001596.
Georgy, M. E., L.-M. Chang, and L. Zhang. 2005. “Prediction of engineering performance: A neurofuzzy approach.” J. Constr. Eng. Manage. 131 (5): 548–557. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:5(548).
Hassanein, A. A. G., and H. M. F. Afify. 2007. “A risk identification procedure for construction contracts—A case study of power station projects in Egypt.” Civ. Eng. Environ. Syst. 24 (1): 3–14. https://doi.org/10.1080/10286600600910104.
Jiang, S., N. Wang, and J. Wu. 2018. “Combining BIM and ontology to facilitate intelligent green building evaluation.” J. Comput. Civ. Eng. 32 (5): 04018039. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000786.
Jiang, S., and J. Zhang. 2013. “Development of an ontology-based semantic retrieval method for construction project risk management.” In Proc., Int. Conf. on Construction and Real Estate Management 2013. Reston, VA: ASCE. https://doi.org/10.1061/9780784413135.070.
Kangari, R. 1995. “Risk management perceptions and trends of U.S. construction.” J. Constr. Eng. Manage. 121 (4): 422–429. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:4(422).
Lattouf, M. G., F. J. Srour, and I. M. Srour. 2014. “Construction workforce management strategies to reduce absenteeism: A survey study.” In Proc., Construction Research Congress 2014, 827–836. Reston, VA: ASCE.
Liu, J., X. Zhao, and P. Yan. 2016. “Risk paths in international construction projects: Case study from Chinese contractors.” J. Constr. Eng. Manage. 142 (6): 05016002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001116.
Ma, G., and M. Wu. 2020. “A big data and FMEA-based construction quality risk evaluation model considering project schedule for Shanghai apartment projects.” Int. J. Qual. Reliab. Manage. 37 (1): 18–33. https://doi.org/10.1108/IJQRM-11-2018-0318.
Mahdavian, A., and A. Shojaei. 2021. “Hybrid genetic algorithm and constraint-based simulation framework for building construction project planning and control.” J. Constr. Eng. Manage. 146 (12): 04020140. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001939.
Mohammadi, S., M. Tavakolan, and B. Zahraie. 2018. “An ontological framework for identification of construction resources using BIM information.” In Proc., Construction Research Congress 2018. Reston, VA: ASCE. https://doi.org/10.1061/9780784481264.068.
Musen, M. 2015. “The Protégé project: A look back and a look forward.” AI Matters 1 (4): 4–12. https://doi.org/10.1145/2757001.2757003.
Niu, J., and R. R. A. Issa. 2013. “Conceptualizing methodology for building an ontology for construction claim knowledge.” In Proc., ASCE Int. Workshop on Computing in Civil Engineering. Reston, VA: ASCE. https://doi.org/10.1061/9780784413029.062.
Pamučar, D., S. Ljubojević, D. Kostadinović, and B. Đorović. 2016. “Cost and risk aggregation in multi-objective route planning for hazardous materials transportation—A neuro-fuzzy and artificial bee colony approach.” Expert Syst. Appl. 65 (Dec): 1–15. https://doi.org/10.1016/j.eswa.2016.08.024.
Petroutsatou, K., E. Georgopoulos, S. Lambropoulos, and J. P. Pantouvakis. 2012. “Early cost estimating of road tunnel construction using neural networks.” J. Constr. Eng. Manage. 138 (6): 679–687. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000479.
Shen, L. Y., G. W. C. Wu, and C. S. K. Ng. 2001. “Risk assessment for construction joint ventures in China.” J. Constr. Eng. Manage. 127 (1): 76–81. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:1(76).
Su, G., M. Hastak, X. Deng, and R. Khallaf. 2021. “Risk sharing strategies for IPD projects: Interactional analysis of participants’ decision-making.” J. Manage. Eng. 37 (1): 04020101. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000853.
Tang, W., M. Qiang, C. F. Duffield, D. M. Young, and Y. Lu. 2007. “Risk management in the Chinese construction industry.” J. Constr. Eng. Manage. 133 (12): 944–956. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(944).
Tserng, H. P., S. Y. L. Yin, R. J. Dzeng, B. Wou, M. D. Tsai, and W. Y. Chen. 2009. “A study of ontology-based risk management framework of construction projects through project life cycle.” Autom. Constr. 18 (7): 994–1008. https://doi.org/10.1016/j.autcon.2009.05.005.
Uher, T., and R. Toakley. 1999. “Risk management in the conceptual phase of a project.” Int. J. Project Manage. 17 (3): 161–169. https://doi.org/10.1016/S0263-7863(98)00024-6.
Venugopal, M., C. M. Eastman, and J. Teizer. 2012. “An ontological approach to building information model exchanges in the precast/pre-stressed concrete industry.” In Proc., Construction Research Congress 2012. Reston, VA: ASCE. https://doi.org/10.1061/9780784412329.112.
Wearne, S. 2008. “Organisational lessons from failures.” Proc. Inst. Civ. Eng. Civ. Eng. 161 (6): 4–7. https://doi.org/10.1680/cien.2008.161.6.4.
Williams, T. P. 2002. “Predicting completed project cost using bidding data.” Construct. Manage. Econ. 20 (3): 225–235. https://doi.org/10.1080/01446190110112838.
Williams, T. P., and J. Gong. 2014. “Predicting construction cost overruns using text mining, numerical data and ensemble classifiers.” Autom. Constr. 43 (Jul): 23–29. https://doi.org/10.1016/j.autcon.2014.02.014.
Xhafa, F., J. Kolodziej, L. Barolli, V. Kolici, R. Miho, and M. Takizawa. 2011. “Evaluation of hybridization of GA and TS algorithms for independent batch scheduling in computational grids.” In Proc., 2011 Int. Conf. on P2P, Parallel, Grid, Cloud and Internet Computing, 148–155. New York: IEEE.
Xiao, J., X. Li, Z. Zhang, and J. Zhang. 2017. “Ontology-based knowledge model to support construction noise control in China.” J. Comput. Civ. Eng. 144 (2): 04017103. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001425.
Xie, Y. 2010. “Cost controller for construction projects based on fuzzy least squares support vector machines.” In Proc., 2010 Int. Conf. on Intelligent Computation Technology and Automation, 1058–1062. New York: IEEE.
Yang, L., J. Lou, and X. Zhao. 2021. “Risk response of complex projects: Risk association network method.” J. Manage. Eng. 37 (4): 05021004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000916.
Yip, H.-L., H. Fan, and Y.-H. Chiang. 2014. “Predicting the maintenance cost of construction equipment: Comparison between general regression neural network and Box–Jenkins time series models.” Autom. Constr. 38 (Mar): 30–38. https://doi.org/10.1016/j.autcon.2013.10.024.
Zhang, J., T. Wang, and L. Zhang. 2021. “Legal risk assessment framework for international PPP projects based on metanetwork.” J. Constr. Eng. Manage. 147 (8): 04021090. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002110.
Zhang, Y., L. Zhang, and X. Wu. 2019. “Hybrid BN approach to analyzing risk in tunnel-induced bridge damage.” J. Perform. Constr. Facil. 33 (5): 04019048. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001310.
Zhong, B. T., L. Y. Ding, H. B. Luo, Y. Zhou, Y. Z. Hu, and H. M. Hu. 2012. “Ontology-based semantic modeling of regulation constraint for automated construction quality compliance checking.” Autom. Constr. 28 (Dec): 58–70. https://doi.org/10.1016/j.autcon.2012.06.006.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 38Issue 6November 2022

History

Received: Nov 14, 2021
Accepted: May 23, 2022
Published online: Jul 23, 2022
Published in print: Nov 1, 2022
Discussion open until: Dec 23, 2022

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Tamima S. Elbashbishy, S.M.ASCE [email protected]
Student, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, 218 Butler-Carlton Hall, 1401 N. Pine St., Rolla, MO 65409 (corresponding author). Email: [email protected]
Professor of Construction Engineering, Dept. of Construction Engineering, American Univ. in Cairo, AUC Ave., New Cairo, Cairo 11835, Egypt. ORCID: https://orcid.org/0000-0003-1087-0520. Email: [email protected]
Ahmed F. Waly, Ph.D. [email protected]
Assistant Professor, Dept. Architecture Engineering, Faculty of Engineering–Mataria, Helwan Univ., Ibrahim Abd El-Razik St., Ein Shams, Cairo 33570, Egypt. Email: [email protected]
Elkhayam M. Dorra, Ph.D. [email protected]
Adjunct Assistant Professor, Dept. of Construction Engineering, American Univ. in Cairo, AUC Ave., New Cairo, Cairo 11835, Egypt. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Identification of Key Safety Risk Factors and Coupling Paths in Mega Construction Projects, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5926, 40, 4, (2024).
  • Sensitivity of Cost Overrun Propensity and Severity to Highway Project Bundling, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5425, 40, 2, (2024).
  • Benchmarking of construction projects performance for comparative assessment and performance improvement: a statistical quantitative approach, Engineering, Construction and Architectural Management, 10.1108/ECAM-06-2022-0552, (2023).
  • Knowledge Graph Improved Dynamic Risk Analysis Method for Behavior-Based Safety Management on a Construction Site, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5306, 39, 4, (2023).
  • Defining the Success Status of Construction Projects Based on Quantitative Performance Metrics Thresholds, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5123, 39, 2, (2023).
  • Predicting the Cost Outcome of Construction Quality Problems Using Case-Based Reasoning (CBR), Buildings, 10.3390/buildings12111946, 12, 11, (1946), (2022).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share