Identification of Critical Success and Risk Factors for Public–Private Partnership Highway Projects

Publication: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 15, Issue 1

Abstract

A recent growing delivery method used in highway projects is public–private partnerships (PPPs). PPPs are when public agencies collaborate with private parties for private financing at risk or operating services, which makes PPPs significantly different from other delivery methods used by public agencies—for example, design-bid-build, construction management at risk, and design-build. Despite the efforts of previous studies, questions remain unanswered: What are the contributing critical success factors that fit PPP highway projects? What are the risk factors that play key roles in PPP highway projects? This study aimed to address these questions through a Delphi study approach with the help of experienced professionals at state departments of transportation. Participants participated in interviews in the first round and completed a survey questionnaire in the second round of a Delphi study. After achieving an acceptable level of consensus from the first round of responses, the study identified and ranked the top critical success and risk factors for PPP highway projects. The study found that the top three critical success factors were (1) proper risk assessment and allocation to private parties; (2) realistic assessment of project estimates, risks, and revenues; and (3) avoidance of ambiguous language in contracts. In addition, the top risk factors identified were (1) revenue stream projections; (2) construction risks; and (3) design risks. The primary contribution of this research to the body of knowledge is to draw the attention of professionals in both industry and academia to the PPP highway industry, critical factors for PPP success and risks, and the successful completion of future PPP projects.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and code generated or used during the study appear in the published article.

Acknowledgments

This research could not have been conducted without the help of the state DOT personnel; this applies particularly to the Delphi study’s long phone interviews and surveys. The authors would like to particularly thank the Texas, Florida, Colorado, and California DOTs, who spent a considerable amount of time on interviews and further discussions, as great contributors.

References

Works Cited

Abdel Aziz, A. M. 2007. “Successful delivery of public-private partnerships for infrastructure development.” J. Constr. Eng. Manage. 133 (12): 918–931. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(918).
Adiyanti, N. P., and R. Fathurrahman. 2021. “Assessing critical success factors for PPP water project in Indonesia: Lessons from West Semarang.” Policy Governance Rev. 5 (2): 164–181. https://doi.org/10.30589/pgr.v5i2.372.
Adler, M., and E. Ziglio. 1996. Gazing into the oracle: The Delphi method and its application to social policy and public health. Philadelphia: Jessica Kingsley Publishers.
Ahmed, M., and M. Garvin. 2022. “Review of critical success factors and key performance indicators in performance assessment of P3 transportation projects.” J. Manage. Eng. 38 (5): 04022045. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001070.
Airoldi, M., J. Chua, P. Gerbert, J. Justus, and R. Rilo. 2013. Meeting the Infrastructure Challenge with Public-Private Partnerships: Bridging the Gap. Boston: Boston Consulting Group.
Almarri, K., and B. Abu-Hijleh. 2017. “Critical success factors for public private partnerships in the UAE construction industry: A comparative analysis between the UAE and the UK.” J. Eng. Project Prod. Manage. 7 (1): 21–32. https://doi.org/10.32738/jeppm.201701.0004.
Al-Saadi, R., and A. Abdou. 2016. “Factors critical for the success of public–private partnerships in UAE infrastructure projects: Experts’ perception.” Int. J. Construct. Manage. 16 (3): 234–248. https://doi.org/10.1080/15623599.2016.1146110.
Ameyaw, E. E., Y. Hu, M. Shan, A. P. Chan, and Y. Le. 2016. “Application of Delphi method in construction engineering and management research: A quantitative perspective.” J. Civil Eng. Manage. 22 (8): 991–1000.
Andrić, J. M., J. Wang, and R. Zhong. 2019. “Identifying the critical risks in railway projects based on fuzzy and sensitivity analysis: A case study of belt and road projects.” Sustainability 11 (5): 1302. https://doi.org/10.3390/su11051302.
ASCE. 2021. Report card for America’s infrastructure. Reston, VA: ASCE.
Aziz, N., Z. Zain, R. M. Z. R. Mafuzi, A. M. Mustapa, N. H. M. Najib, and N. F. N. Lah. 2016. “Relative importance index (RII) in ranking of procrastination factors among university students.” In Vol. 1761 of Proc., AIP Conf., 020022. Melville, NY: AIP Publishing LLC.
Babatunde, S. O., S. Perera, and O. Adeniyi. 2019. “Identification of critical risk factors in public-private partnership project phases in developing countries: A case of Nigeria.” Benchmarking Int. J. 26 (2): 334–355. https://doi.org/10.1108/BIJ-01-2017-0008.
Bayiley, Y. T., and G. K. Teklu. 2016. “Success factors and criteria in the management of international development projects: Evidence from projects funded by the European Union in Ethiopia.” Int. J. Managing Projects Bus. 9 (3): 562–582. https://doi.org/10.1108/IJMPB-06-2015-0046.
Cabaniss, K. 2002. “Computer-related technology use by counselors in the new millennium: A Delphi study.” J. Technol. Couns. 2 (2): 3–34.
Carbonara, N., N. Costantino, L. Gunnigan, and R. Pellegrino. 2015. “Risk management in motorway PPP projects: Empirical-based guidelines.” Transp. Rev. 35 (2): 162–182.
Chan, A. P., P. T. Lam, D. W. Chan, E. Cheung, and Y. Ke. 2010. “Potential obstacles to successful implementation of public-private partnerships in Beijing and the Hong Kong special administrative region.” J. Manage. Eng. 26 (1): 30–40.
Chan, A. P., E. H. Yung, P. T. Lam, C. M. Tam, and S. O. Cheung. 2001. “Application of Delphi method in selection of procurement systems for construction projects.” Constr. Manage. Econ. 19 (7): 699–718.
Chou, J. S., and D. Pramudawardhani. 2015. “Cross-country comparisons of key drivers, critical success factors and risk allocation for public-private partnership projects.” Int. J. Project Manage. 33 (5): 1136–1150. https://doi.org/10.1016/j.ijproman.2014.12.003.
Cicchetti, D. V. 1994. “Guidelines, criteria, and rules of thumb for evaluating normed and standardized assessment instruments in psychology.” Psychol. Assess. 6 (4): 284. https://doi.org/10.1037/1040-3590.6.4.284.
Cruz, C. O., and J. M. Sarmento. 2021. The renegotiations of public private partnerships in transportation: Theory and practice. Berlin: Springer.
Debela, G. Y. 2022. “Critical success factors (CSFs) of public–private partnership (PPP) road projects in Ethiopia.” Int. J. Construct. Manage. 22 (3): 489–500. https://doi.org/10.1080/15623599.2019.1634667.
Delmon, J. 2021. Private sector investment in infrastructure: Project finance, PPP projects and PPP frameworks. Alphen aan den Rijn, Netherlands: Kluwer Law International BV.
Dixon, T., G. Pottinger, and A. Jordan. 2005. “Lessons from the private finance initiative projects in the UK: Benefits, problems and critical success factors.” J. Property Invest. Finance 23 (5): 412–423. https://doi.org/10.1108/14635780510616016.
FHWA (Federal Highway Administration). 2019. “Center for innovative finance support: P3 projects.” Accessed may 11, 2022. https://www.fhwa.dot.gov/ipd/p3/p3_projects/.
Fleiss, J. L. 1975. “Measuring agreement between two judges on the presence or absence of a trait.” Biometrics 31 (3): 651–659. https://doi.org/10.2307/2529549.
Garvin, M. J. 2010. “Enabling development of the transportation public–private partnership market in the United States.” J. Constr. Eng. Manage. 136 (4): 402–411. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000122.
Gharaibeh, H. M. 2014. “Cost control in mega projects using the Delphi method.” J. Manage. Eng. 30 (5): 04014024. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000218.
Graham, M., A. Milanowski, and J. Miller. 2012. “Measuring and promoting inter-rater agreement of teacher and principal performance ratings.” Accessed August 15, 2021. https://files.eric.ed.gov/fulltext/ED532068.pdf.
Gündüz, M., Y. Nielsen, and M. Özdemir. 2013. “Quantification of delay factors using the relative importance index method for construction projects in Turkey.” J. Manage. Eng. 29 (2): 133–139.
Gunhan, S., and D. Arditi. 2005. “Factors affecting international construction.” J. Constr. Eng. Manage. 131 (3): 273–282. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(273).
Hai, D. T., N. Q. Toan, and N. Van Tam. 2022. “Critical success factors for implementing PPP infrastructure projects in developing countries: The case of Vietnam.” Innovative Infrastruct. Solutions 7 (1): 1–13. https://doi.org/10.1007/s41062-021-00688-6.
Hallgren, K. A. 2012. “Computing inter-rater reliability for observational data: An overview and tutorial.” Tutorials Quant. Methods Psychol. 8 (1): 23. https://doi.org/10.20982/tqmp.08.1.p023.
Hallowell, M. R., and J. A. Gambatese. 2009. “Construction safety risk mitigation.” J. Constr. Eng. Manage. 135 (12): 1316–1323. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000107.
Hallowell, M. R., and J. A. Gambatese. 2010. “Qualitative research: Application of the Delphi method to CEM research.” J. Constr. Eng. Manage. 136 (1): 99–107. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000137.
Hatmoko, J. U. D., and R. Susanti. 2017. “Risk management of West Semarang water supply PPP project: Public sector perspective.” IPTEK J. Proc. Ser. 3 (1): 48–54. https://doi.org/10.12962/j23546026.y2017i1.2191.
Henchion, M., and B. McIntyre. 2005. “Market access and competitiveness issues for food SMEs in Europe’s lagging rural regions (LRRs).” Br. Food J. 107 (6): 404–422. https://doi.org/10.1108/00070700510602183.
Hinks, J., and P. McNay. 1999. “The creation of a management-by-variance tool for facilities management performance assessment.” Facilities 17 (1–2): 31–53. https://doi.org/10.1108/02632779910248893.
Hodge, G. A., and C. Greve. 2007. “Public–private partnerships: An international performance review.” Public Administration Rev. 67 (3): 545–558. https://doi.org/10.1111/j.1540-6210.2007.00736.x.
Hsueh, C. M., and L. M. Chang. 2017. “Critical success factors for PPP infrastructure: Perspective from Taiwan.” J. Chin. Inst. Eng. 40 (5): 370–377. https://doi.org/10.1080/02533839.2017.1335619.
Hwang, B. G., X. Zhao, and M. J. S. Gay. 2013. “Public private partner- ship projects in Singapore: Factors, critical risks and preferred risk allocation from the perspective of contractors.” Int. J. Project Manage. 31 (3): 424–433. https://doi.org/10.1016/j.ijproman.2012.08.003.
Jacobson, C., and S. O. Choi. 2008. “Success factors: Public works and public-private partnerships.” Int. J. Publ. Sect. Manage. 21 (6): 637–657. https://doi.org/10.1108/09513550810896514.
Jamali, D. 2004. “Success and failure mechanisms of public private partnerships (PPPs) in developing countries: Insights from Lebanese context.” Int. J. Publ. Sect. Manage. 17 (5): 414–430. https://doi.org/10.1108/09513550410546598.
Jefferies, M. 2006. “Critical success factors of public private sector partnerships: A case study on the Sydney SuperDome.” Eng. Constr. Archit. Manage. 13 (5): 451–462. https://doi.org/10.1108/09699980610690738.
Jefferies, M., R. Gameson, and S. Rowlinson. 2002. “Critical success factors of the BOOT procurement system: Reflections from the Stadium Australia case study.” Eng. Constr. Archit. Manage. 9 (4): 352–361. https://doi.org/10.1108/eb021230.
Jiang, X., K. Lu, B. Xia, Y. Liu, and C. Cui. 2019. “Identifying significant risks and analyzing risk relationship for construction PPP projects in China using integrated FISM-MICMAC approach.” Sustainability 11 (19): 5206. https://doi.org/10.3390/su11195206.
Karas, O. 2019. The concept and role of infrastructure in economic development of country scientific development of new Eastern Europe, 72. Latvia: Baltija Publishing.
Kavishe, N., I. Jefferson, and N. Chileshe. 2018. “An analysis of the delivery challenges influencing public private partnership in housing projects: The case of Tanzania.” Eng. Constr. Archit. Manage. 25 (2): 202–240. https://doi.org/10.1108/ECAM-12-2016-0261.
Ke, Y., S. Wang, A. P. Chan, and P. T. Lam. 2010. “Preferred risk allocation in China’s public–private partnership (PPP) projects.” Int. J. Project Manage. 28 (5): 482–492.
Kometa, S. T., P. O. Olomolaiye, and F. C. Harris. 1994. “Attributes of UK construction clients influencing project consultants’ performance.” Construct. Manage. Econ. 12 (5): 433–443. https://doi.org/10.1080/01446199400000053.
Kukah, A. S. K., D. G. Owusu-Manu, E. Badu, and D. J. Edwards. 2022. “Delphi study for evaluating key risk factors inherent in public-private partnership (PPP) power projects in Ghana.” J. Facil. Manage. https://doi.org/10.1108/JFM-09-2021-0098.
Kwak, Y. H., Y. Chih, and C. W. Ibbs. 2009. “Towards a comprehensive understanding of public private partnerships for infrastructure development.” Calif. Manage. Rev. 51 (2): 51–78. https://doi.org/10.2307/41166480.
Lam, K. C., and W. S. Chow. 1999. “The significance of financial risks in BOT procurement.” Build. Res. Inf. 27 (2): 84–95. https://doi.org/10.1080/096132199369552.
Landeta, J. 2006. “Current validity of the Delphi method in social sciences.” Technol. Forecasting Social Change. 73 (5): 467–482.
Le, P. T., K. Kirytopoulos, N. Chileshe, and R. Rameezdeen. 2022. “Taxonomy of risks in PPP transportation projects: A systematic literature review.” Int. J. Construct. Manage. 22 (2): 166–181. https://doi.org/10.1080/15623599.2019.1615756.
Li, B., A. Akintoye, P. J. Edwards, and C. Hardcastle. 2005. “Critical success factors for PPP/PFI projects in the UK construction industry.” Construct. Manage. Econ. 23 (5): 459–471. https://doi.org/10.1080/01446190500041537.
Li, S., D. Abraham, and H. Cai. 2017. “Infrastructure financing with project bond and credit default swap under public–private partnerships.” Int. J. Project Manage. 35 (3): 406–419.
Liang, Y., and H. Jia. 2018. “Key success indicators for PPP projects: Evidence from Hong Kong.” Adv. Civ. Eng. 2018: 1–10. https://doi.org/10.1155/2018/9576496.
Linstone, H. A., and M. Turoff. 1975. “Introduction to the Delphi method: Techniques and applications.” In The Delphi method: Techniques and applications, 3–12. Boston: Addison-Wesley.
Lucko, G., and E. M. Rojas. 2010. “Research validation: Challenges and opportunities in the construction domain.” J. Constr. Eng. Manage. 136 (1): 127–135. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000025.
Ludwig, B. 1997. “Predicting the future: Have you considered using the Delphi methodology.” J. Extension 35 (5): 1–4.
Luo, L., Q. He, J. Xie, D. Yang, and G. Wu. 2017. “Investigating the relationship between project complexity and success in complex construction projects.” J. Manage. Eng. 33 (2): 04016036. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000471.
Luzon, B., and S. M. El-Sayegh. 2016. “Evaluating supplier selection criteria for oil and gas projects in the UAE using AHP and Delphi.” Int. J. Construct. Manage. 16 (2): 175–183. https://doi.org/10.1080/15623599.2016.1146112.
MacCarthy, B. L., and W. Atthirawong. 2003. “Factors affecting location decisions in international operations—A Delphi study.” Int. J. Oper. Prod. Manage. 23 (7): 794–818. https://doi.org/10.1108/01443570310481568.
Meng, X., Q. Zhao, and Q. Shen. 2011. “Critical success factors for transfer-operate-transfer urban water supply project in China.” J. Manage. Eng. 27 (4): 243–251. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000058.
Migliaccio, G. C. 2007. “Planning for strategic change in the project delivery strategy.” Ph.D. dissertation, Civil, Architectural and Environmental Engineering, Univ. of Texas at Austin.
Montgomery, A. A., A. Graham, P. H. Evans, and T. Fahey. 2002. “Inter-rater agreement in the scoring of abstracts submitted to a primary care research conference.” BMC Health Serv. Res. 2 (1): 1–4.
Ng, S. T., Y. M. W. Wong, and J. M. W. Wong. 2012. “Factors influencing the success of PPP at feasibility stage—A tripartite comparison study in Hong Kong.” Habitat Int. 36 (4): 423–432. https://doi.org/10.1016/j.habitatint.2012.02.002.
Nunnally, J. C. 1994. Psychometric theory 3E. New York: Tata McGraw-Hill Education.
Okoli, C., and S. D. Pawlowski. 2004. “The Delphi method as a research tool: An example, design considerations and applications.” Inf. Manage. 42 (1): 15–29.
Okudan, O., and C. Budayan. 2020. “Determination of the critical success criteria for public-private partnership (PPP) projects in Turkey.” Politeknik Dergisi 24 (4): 1675–1689.
Olawumi, T. O., and D. W. Chan. 2018. “Critical success factors (CSFs) for amplifying the integration of BIM and sustainability principles in construction projects: A Delphi study.” In Proc., RICS COBRA, Conf. 2018 RICS, 23–25. London: Univ. College London.
Orndoff, C. J. 2005. “Promising new tool for stakeholder interaction.” J. Archit. Eng. 11 (4): 139–146. https://doi.org/10.1061/(ASCE)1076-0431(2005)11:4(139).
Osei-Kyei, R., and A. P. Chan. 2015. “Review of studies on the critical success factors for public–private partnership (PPP) projects from 1990 to 2013.” Int. J. Project Manage. 33 (6): 1335–1346. https://doi.org/10.1016/j.ijproman.2015.02.008.
Osei-Kyei, R., X. Jin, C. Nnaji, I. Akomea-Frimpong, and I. Y. Wuni. 2022. “Review of risk management studies in public-private partnerships: A scientometric analysis.” Int. J. Construct. Manage. 1–12. https://doi.org/10.1080/15623599.2022.2063013.
Oyetunji, A., and S. Anderson. 2006. “Relative effectiveness of project delivery and contract strategies.” J. Constr. Eng. Manage. 132 (1): 3–13. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(3).
Perera, B. A. K. S., R. Rameezdeen, N. Chileshe, and M. R. Hosseini. 2014. “Enhancing the effectiveness of risk management practices in Sri Lankan road construction projects: A Delphi approach.” Int. J. Construct. Manage. 14 (1): 1–14. https://doi.org/10.1080/15623599.2013.875271.
PWF (Public Works Financing). 2016. “Report.” Accessed March 5, 2020. https://azdot.gov/sites/default/files/2019/08/p3-pwf-feb-2016.pdf.
Qiao, L., S. Q. Wang, R. L. K. Tiong, and T. S. Chan. 2001. “Framework for critical success factors of BOT projects in China.” J. Struct. Finance 7 (1): 53–61. https://doi.org/10.3905/jsf.2001.320244.
Rahman, I. A., I. B. Ismail, and M. M. Jaber. 2018. “Risk assessment of time and cost overrun factors throughout construction project lifecycle: Pilot study.” Int. J. Eng. Technol. 7 (3.20): 717–723.
Roman, A. V. and C. A. San Bernardino. 2015. A guide to public-private partnerships (PPPs): What public procurement specialists need to know. Herndon, VA: National Institute of Governmental Purchasing (NIGP) Business Council.
Sambasivan, M., and Y. W. Soon. 2007. “Causes and effects of delays in Malaysian construction industry.” Int. J. Project Manage. 25 (5): 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007.
Sarkar, D., N. Bhatt, K. Singh, and G. Dutta. 2021. “Critical success factors (CSFS) for public private partnership road projects in Western India.” Int. J. Constr. Project Manage. 13 (1): 89–114.
Sarmento, J., L. Renneboog, and P. V. Matos. 2017. “Measuring highway efficiency by a DEA approach and the Malmquist index.” Eur. J. Transp. Infrastruct. Res. 17 (4): 530–551.
Sehgal, R., and A. M. Dubey. 2019. “Identification of critical success factors for public–private partnership projects.” J. Public Aff. 19 (4): e1956. https://doi.org/10.1002/pa.1956.
Shrestha, K. 2016. “Framework of performance-based contracting for chip seal and striping maintenance activities.” Ph.D. thesis, Dept. of Civil and Environmental Engineering and Construction, Univ. of Nevada, Las vegas.
Shrout, P. E., and J. L. Fleiss. 1979. “Intraclass correlations: Uses in assessing rater reliability.” Psychol. Bull. 86 (2): 420. https://doi.org/10.1037/0033-2909.86.2.420.
Skulmoski, G. J., F. T. Hartman, and J. Krahn. 2007. “The Delphi method for graduate research.” J. Inf. Technol. Educ. Res. 6 (1): 1–21.
Sohu, S., A. A. Jhatial, K. Ullah, M. T. Lakhiar, and J. Shahzaib. 2018. “Determining the critical success factors for highway construction projects in Pakistan.” Eng. Technol. Appl. Sci. Res. 8 (2): 2685–2688. https://doi.org/10.48084/etasr.1866.
Sourani, A., and M. Sohail. 2015. “The Delphi method: Review and use in construction management research.” Int. J. Constr. Educ. Res. 11 (1): 54–76. https://doi.org/10.1080/15578771.2014.917132.
Tallaki, M., and E. Bracci. 2021. “Risk allocation, transfer and management in public–private partnership and private finance initiatives: A systematic literature review.” Int. J. Public Sector Manage. 34 (7): 709–731. https://doi.org/10.1108/IJPSM-06-2020-0161.
Tiong, R. L. K. 1996. “CSFs in competitive tendering and negotiation model for BOT projects.” J. Constr. Eng. Manage. 122 (3): 205–211. https://doi.org/10.1061/(ASCE)0733-9364(1996)122:3(205).
Tiong, R. L. K., K. T. Yeo, and S. C. McCarthy. 1992. “Critical success factors in winning BOT contracts.” J. Constr. Eng. Manage. 118 (2): 217–228. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:2(217).
Vesković, S., Ž. Stević, G. Stojić, M. Vasiljević, and S. Milinković. 2018. “Evaluation of the railway management model by using a new integrated model DELPHI-SWARA-MABAC.” Dec. Making: Appl. Manage. Eng. 1 (2): 34–50.
Vidal, L. A., F. Marle, and J. C. Bocquet. 2011. “Using a Delphi process and the analytic hierarchy process (AHP) to evaluate the complexity of projects.” Expert Syst. Appl. 38 (5): 5388–5405. https://doi.org/10.1016/j.eswa.2010.10.016.
Wang, Y., Y. Wang, X. Wu, and J. Li. 2020. “Exploring the risk factors of infrastructure PPP projects for sustainable delivery: A social network perspective.” Sustainability. 12 (10): 4152.
Wang, Y., and Z. J. Zhao. 2018. “Evaluating the effectiveness of public–private partnerships in highway development: The case of Virginia.” Transp. Res. Rec. 2672 (4): 43–53. https://doi.org/10.1177/0361198118791629.
Xia, B., and A. P. Chan. 2012a. “Identification of selection criteria for operational variations of the design-build system: A Delphi study in China.” J. Civ. Eng. Manage. 18 (2): 173–183. https://doi.org/10.3846/13923730.2012.657417.
Xia, B., and A. P. Chan. 2012b. “Measuring complexity for building projects: A Delphi study.” Eng. Constr. Archit. Manage. 19 (1): 7–24. https://doi.org/10.1108/09699981211192544.
Xia, B., A. P. Chan, and J. F. Yeung. 2011. “Developing a fuzzy multicriteria decision-making model for selecting design-build operational variations.” J. Constr. Eng. Manage. 137 (12): 1176–1184. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000381.
Xia, B., K. Molenaar, A. Chan, M. Skitmore, and J. Zuo. 2013. “Determining optimal proportion of design in design-build request for proposals.” J. Constr. Eng. Manage. 139 (6): 620–627. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000643.
Yeung, J. F., A. P. Chan, and D. W. Chan. 2009. “Developing a performance index for relationship-based construction projects in Australia: Delphi study.” J. Manage. Eng. 25 (2): 59–68. https://doi.org/10.1061/(ASCE)0742-597X(2009)25:2(59).
Yong, H. K. 2010. Public-private partnerships policy and practice: A reference guide. London: Commonwealth Secretariat.
Zaiontz, C. 2015. “Real statistics using excel.” Accessed October 14, 2022. https://www.real-statistics.com/.
Zayed, T. M., and L. M. Chang. 2002. “Prototype model for build-operate-transfer risk assessment.” J. Manage. Eng. 18 (1): 7–16. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:1(7).
Zhang, L., X. Sun, and H. Xue. 2019. “Identifying critical risks in Sponge City PPP projects using DEMATEL method: A case study of China.” J. Cleaner Prod. 226: 949–958.
Zhang, X. 2005. “Critical success factors for public-private partnerships in infrastructure development.” J. Constr. Eng. Manage. 131 (1): 3–14.

Information & Authors

Information

Published In

Go to Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 15Issue 1February 2023

History

Received: May 9, 2022
Accepted: Aug 13, 2022
Published online: Nov 14, 2022
Published in print: Feb 1, 2023
Discussion open until: Apr 14, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Assistant Professor, Dept. of Civil and Environmental Engineering, Manhattan College, NY 10471 (corresponding author). ORCID: https://orcid.org/0000-0001-8274-8431. Email: [email protected]
Pramen P. Shrestha, Ph.D., F.ASCE [email protected]
P.E.
Professor, Dept. of Civil and Environmental Engineering & Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, 4505 S. Maryland Parkway, Las Vegas, NV 89154. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share