Technical Papers
Jan 21, 2020

Performance Analysis of Alternative Contracting Methods for Highway Construction Projects: Case Study for Iran

Publication: Journal of Infrastructure Systems
Volume 26, Issue 2

Abstract

The suitability of the project delivery system (PDS) selected for a project greatly influences the efficiency of project implementation. In Iran, traditional design-bid-build (DBB) is commonly used for highway construction projects; however, DBB leads to problems such as cost overruns, delays, and poor quality. This study aims to compare the performance of DBB with that of alternative contracting methods (ACM), including design-build (DB) and construction manager (CM) methods, for highway projects in Iran. A survey was conducted to determine the most important decision-making criteria for selecting the appropriate PDS to use in highway projects. The survey, conducted by postal questionnaire, aimed to empirically validate the reliability of the model. In the survey, all the conditions for imposing the effective criteria were considered, and ultimately a model using the analytical hierarchy process (AHP) was developed to rank the PDSs for highway construction projects in Iran. The results showed that DB is most often the optimal method. The research can be used to prepare a model that can help project owners make sound decisions about the best PDS.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and code generated or used during the study appear in the published article.

References

Abay, K. A. 2013. “Examining pedestrian-injury severity using alternative disaggregate models.” Res. Transport Econ. 43 (1): 123–136. https://doi.org/10.1016/j.retrec.2012.12.002.
Ahmad, I., N. Azhar, and A. Chowdhury. 2019. “Enhancement of IPD characteristics as impelled by information and communication technology.” J. Manage. Eng. 35 (1): 04018055. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000670.
Akadiri, P. O., P. O. Olomolaiye, and E. A. Chinyio. 2013. “Multi-criteria evaluation model for the selection of sustainable materials for building projects.” Autom. Constr. 30 (Mar): 113–125. https://doi.org/10.1016/j.autcon.2012.10.004.
Aladağ, H., and Z. Işik. 2017. “Role of financial risks in BOT megatransportation projects in developing countries.” J. Manage. Eng. 33 (4): 04017007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000527.
Alhazmi, T., and R. McCaffer. 2000. “Project procurement system selection model.” J. Constr. Eng. Manage. 126 (3): 176–184. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:3(176).
Al-Khalil, M. I. 2002. “Selecting the appropriate project delivery method using AHP.” Int. J. Project Manage. 20 (6): 469–474. https://doi.org/10.1016/S0263-7863(01)00032-1.
Alleman, D., A. Antoine, M. Schrilla, and K. Molenaar. 2016. “The use and performance of alternative contracting methods on small highway construction projects.” Procedia Eng. 145: 908–915. https://doi.org/10.1016/j.proeng.2016.04.118.
Anastasopoulos, P. C., S. Labi, B. G. McCullouch, M. G. Karlaftis, and F. Moavenzadeh. 2010. “Influence of highway project characteristics on contract type selection: Empirical assessment.” J. Infrastruct. Syst. 16 (4): 323–333. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000035.
Angulo, E., E. Castillo, R. García-Ródenas, and J. Sánchez-Vizcaíno. 2014. “A continuous bi-level model for the expansion of highway networks.” Comput. Oper. Res. 41 (Jan): 262–276. https://doi.org/10.1016/j.cor.2013.02.022.
Antoniou, F., G. N. Aretoulis, D. Konstantinidis, and G. P. Kalfakakou. 2012. “Selection criteria used for the choice of contract type for major highway construction projects.” Procedia Soc. Behav. Sci. 48: 3508–3517. https://doi.org/10.1016/j.sbspro.2012.06.1314.
Antoniou, F., G. N. Aretoulis, D. Konstantinidis, and G. P. Kalfakakou. 2013. “Complexity in the evaluation of contract types employed for the construction of highway projects.” Procedia Soc. Behav. Sci. 74 (Mar): 448–458. https://doi.org/10.1016/j.sbspro.2013.03.048.
ASCE. 2012. Quality in the constructed project: A guide for owners, designers, and constructors. 3rd ed. Reston, VA: ASCE.
Bayraktar, M. E., and M. Hastak. 2009. “A decision support system for selecting the optimal contracting strategy in highway work zone projects.” Autom. Constr. 18 (6): 834–843. https://doi.org/10.1016/j.autcon.2009.03.007.
Bingham, E., M. El Asmar, and G. E. Gibson, Jr. 2016. “Project delivery method selection: Analysis of user perceptions on transportation projects.” In Proc. Construction Research Congress 2016, 2110–2118. Reston, VA: ASCE.
Brown, T. L., M. Potoski, and D. V. Slyke. 2016. “Managing complex contracts: A theoretical approach.” J. Public Administration Res. Theory 26 (2): 294–308. https://doi.org/10.1093/jopart/muv004.
Capony, A., B. Muresan, M. Dauvergne, J. Auriol, V. Ferber, and A. Jullien. 2013. “Monitoring and environmental modeling of earthwork impacts: A road construction case study.” Resour. Conserv. Recycl. 74 (May): 124–133. https://doi.org/10.1016/j.resconrec.2013.03.007.
Cavallo, A., and V. Ireland. 2014. “Preparing for complex interdependent risks: A system of systems approach to building disaster resilience.” Int. J. Disaster Risk Reduct. 9 (Sep): 181–193. https://doi.org/10.1016/j.ijdrr.2014.05.001.
Chen, E., and A. P. Tarko. 2014. “Modeling safety of highway work zones with random parameters and random effects models.” Anal. Methods Accid. Res. 1: 86–95. https://doi.org/10.1016/j.amar.2013.10.003.
Chen, Q., Z. Jin, B. Xia, P. Wu, and M. Skitmore. 2016. “Time and cost performance of design-build projects.” J. Constr. Eng. Manage. 142 (2): 04015074. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001056.
Chen, Y. Q., J. Y. Liu, B. Li, and B. Lin. 2011. “Project delivery system selection of construction projects in China.” J. Expert Syst. Appl. 38 (5): 5456–5462. https://doi.org/10.1016/j.eswa.2010.10.008.
Cheung, S. O., T. I. Lam, Y. W. Wan, and K. C. Lam. 2001. “Improving objectivity in procurement selection.” J. Manage. Eng. 17 (3): 132–139. https://doi.org/10.1061/(ASCE)0742-597X(2001)17:3(132).
Chou, J. S., and J. T. O’Connor. 2007. “Internet-based preliminary highway construction cost estimating database.” Autom. Constr. 17 (1): 65–74. https://doi.org/10.1016/j.autcon.2007.03.001.
Chou, J.-S., A.-D. Pham, and H. Wang. 2013. “Bidding strategy to support decision-making by integrating fuzzy AHP and regression-based simulation.” Autom. Constr. 35 (Nov): 517–527. https://doi.org/10.1016/j.autcon.2013.06.007.
CII (Construction Industry Institute). 2014. CII glossary. Accessed March 19, 2014. https://www.constructioninstitute.org/scriptcontent/glossary.cfm?section=know.
Corey, G. 2013. “DBIA tells congress: Design-build is good for small businesses.” Accessed May 23, 2013. https://dbia.org/dbia-tells-congress-design-build-is-good-for-small-businesses/.
Cruz, C. O., and R. C. Marques. 2012. “Risk-sharing in highway concessions: Contractual diversity in Portugal.” J. Prof. Issues Eng. Educ. Pract. 139 (2): 99–108. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000131.
Cruz, C. O., and R. C. Marques. 2013. “Using the economic and financial reequilibrium model to decrease infrastructure contract incompleteness.” J. Infrastruct. Syst. 19 (1): 58–66. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000110.
Forgues, D., and L. Koskela. 2008. “Can procurement affect design performance?” J. Constr. Procurement 14 (2): 130–142. 10.4018/IJ3DIM.2016040101.
Gad, G. M., S. A. Adamtey, and D. D. Gransberg. 2015. “Trends in quality management approaches to design–build transportation projects.” Transp. Res. Rec. 2504 (1): 87–92. https://doi.org/10.3141%2F2504-11.
Ghanbaripour, A. N., C. Langston, and A. Yousefi. 2017. “Implementation of 3D integration model for project delivery success: Case study.” J. Constr. Eng. Manage. 143 (8): 05017012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001305.
Gharouni Jafari, K., E. Noorzai, S. R. Makkiabadi, and R. HeshmatNezhad. 2014. “Providing a model to select a proper delivery system for railway projects in Iran.” In ISAHP 2014 Conf. Washington, DC: International Symposium on the Analytic Hierarchy Process.
Ghavamifar, K. 2009. “A decision support system for project delivery method selection in the transit industry.” Ph.D. dissertation, Dept. of Civil and Environmental Engineering, Northeastern Univ.
Ghoddousi, P., O. Poorafshar, N. Chileshe, and M. R. Hosseini. 2015. “Labour productivity in Iranian construction projects: Perceptions of chief executive officers.” Int. J. Productivity Perform. Manage. 64 (6): 811–830. https://doi.org/10.1108/IJPPM-10-2013-0169.
Goftar, V. N., E. A. Mounir, and E. Bingham. 2014. “A meta-analysis of literature comparing project performance between design-build and design-bid-build delivery systems.” In Proc., Construction Research Congress, 1389–1396. Reston, VA: ASCE.
Goh, K. C., H. H. Goh, and H. Y. Chong. 2019. “Integration model of fuzzy AHP and life-cycle cost analysis for evaluating highway infrastructure investments.” J. Infrastruct. Syst. 25 (1): 04018045. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000473.
Golabchi, M., and E. Noorzai. 2013. Projects delivery methods. Tehran, Iran: Univ. of Tehran Press.
Gordon, C. M. 1994. “Choosing appropriate construction contracting method.” J. Constr. Eng. Manage. 120 (1): 196–210. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:1(196).
Gransberg, D. D. 2014. “Applying alternative technical concepts to construction manager–general contractor project delivery.” Transp. Res. Rec. 2408 (1): 10–16. https://doi.org/10.3141/2408-02.
Gransberg, D. D., J. A. Koch, and K. R. Molenaar. 2006. Preparing for design-build projects: A primer for owners, engineers, and contractors. Reston, VA: ASCE.
Gudmundsson, H., and M. Hojer. 1996. “Sustainable development principles and their implications for transport.” Ecol. Econ. 19 (3): 269–282. https://doi.org/10.1016/S0921-8009(96)00045-6.
Guimarães, B., P. Simões, and R. C. Marques. 2010. “Does performance evaluation help public managers? A balanced scorecard approach in urban waste services.” J. Environ. Manage. 91 (12): 2632–2638. https://doi.org/10.1016/j.jenvman.2010.07.039.
Hall, D. M., and W. R. Scott. 2019. “Early stages in the institutionalization of integrated project delivery.” Project Manage. J. 50 (2): 128–143. https://doi.org/10.1177/8756972818819915.
Hanine, M., O. Boutkhoum, A. Tikniouine, and T. Agouti. 2017. “An application of OLAP/GIS-fuzzy AHP-TOPSIS methodology for decision making: Location selection for landfill of industrial wastes as a case study.” KSCE J. Civ. Eng. 21 (6): 2074–2084. https://doi.org/10.1007/s12205-016-0114-4.
Harris, N., T. Shealy, and L. Klotz. 2017. “Choice architecture as a way to encourage a whole systems design perspective for more sustainable infrastructure.” Sustainability 9 (1): 54. https://doi.org/10.3390/su9010054.
Hasanzadeh, S., B. Esmaeili, S. Nasrollahi, M. Gad Ghada, and D. Gransberg Douglas. 2018. “Impact of owners’ early decisions on project performance and dispute occurrence in public highway projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (2): 04518004. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000251.
Hoseingholi, M., and M. Parchami Jalal. 2017. “Identification and analysis of owner-induced problems in design–build project lifecycle.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 9 (2): 04516013. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000206.
Hosseini, M. R., S. Banihashemi, I. Martek, H. Golizadeh, and F. Ghodoosi. 2018. “Sustainable delivery of megaprojects in Iran: Integrated model of contextual factors.” J. Manage. Eng. 34 (2): 05017011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000587.
Huang, R. Y., and C. H. Yeh. 2008. “Development of an assessment framework for green highway construction.” J. Chin. Inst. Eng. 31 (4): 573–585. https://doi.org/10.1080/02533839.2008.9671412.
Ibbs, W. C., Y. H. Kwak, T. Ng, and A. M. Odabasi. 2003. “Project delivery systems and project change: Quantitative analysis.” J. Constr. Eng. Manage. 129 (4): 382–387. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(382).
Ilbeigi, M., and D. Castro-Lacouture. 2017. “Effects of price-adjustment clauses on number of bidders and dispersion of bid prices in highway construction.” J. Manage. Eng. 33 (4): 04017013. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000533.
Inti, S., and V. Tandon. 2017. “Application of fuzzy preference–analytic hierarchy process logic in evaluating sustainability of transportation infrastructure requiring multi-criteria decision making.” J. Infrastruct. Syst. 23 (4): 04017014. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000373.
Ishizaka, A., and A. Labib. 2011. “Review of the main developments in the analytic hierarchy process.” Expert Syst. Appl. 38 (11): 14336–14345. https://doi.org/10.1016/j.eswa.2011.04.143.
John A. Volpe National Transportation Systems Center. 2011. Federal highway administration scenario planning guidebook. Washington, DC: Federal Highway Administration, Office of Planning.
Jones, L. V., D. R. Peryam, and L. L. Thurstone. 1955. “Development of a scale for measuring soldiers’ food preferences.” J. Food Res. 20 (5): 512–520. https://doi.org/10.1111/j.1365-2621.1955.tb16862.x.
Karimi Dehnavi, H., M. Rezvan, A. Shirmohammadli, and D. Vallée. 2013. “A solution for urban road selection and construction problem using simulation and goal programming—Case study of the City of Isfahan.” Transp. Policy 29 (Sep): 46–53. https://doi.org/10.1016/j.tranpol.2013.04.003.
Konchar, M., and V. Sanvido. 1998. “Comparison of U.S. project delivery systems.” J. Constr. Eng. Manage. 124 (6): 435–444. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(435).
Levy, P. S., and S. Lemeshow. 2008. Sampling of populations: Methods and applications. 4th ed. Hoboken, NJ: Wiley.
Li, M., and W. Chen. 2012. “Application of BP neural network algorithm in sustainable development of highway construction projects.” Phys. Procedia 25: 1212–1217. https://doi.org/10.1016/j.phpro.2012.03.222.
Liang, R., Z. Dong, Z. Sheng, X. Wang, and C. Wu. 2017. “Case study of selecting decision-making schemes in large-scale infrastructure projects.” J. Infrastruct. Syst. 23 (4): 06017001. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000364.
Love, P. E., M. Skitmore, and G. Earl. 1998. “Selecting a suitable procurement method for a building project.” Constr. Manage. Econ. 16 (2): 221–233. https://doi.org/10.1080/014461998372501.
Lu, Y., X. Lou, and H. Zhang. 2011. “A gene expression programming algorithm for highway construction cost prediction problems.” J. Transp. Syst. Eng. Inf. Technol. 11 (6): 85–92. https://doi.org/10.1016/S1570-6672(10)60150-X.
Mafakheri, F., L. Dai, D. Slezak, and F. Nasiri. 2007. “Project delivery system selection under uncertainty: Multicriteria multilevel decision aid model.” J. Constr. Eng. Manage. 23 (4): 200–206. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:4(200).
Mahdi, I., and K. Alreshaid. 2005. “Decision support system for selecting the proper delivery method using analytical hierarchy process AHP.” Int. J. Project Manage. 23 (7): 564–572. https://doi.org/10.1016/j.ijproman.2005.05.007.
Marques, R. C. 2018. “Is arbitration the right way to settle conflicts in PPP arrangements?” J. Manage. Eng. 34 (1): 05017007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000564.
Marques, R. C., and S. Berg. 2010. “Revisiting the strengths and limitations of regulatory contracts in infrastructure industries.” J. Infrastruct. Syst. 16 (4): 334–342. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000029.
Mehany, M. S. H. M., G. Bashettiyavar, B. Esmaeili, and G. Gad. 2018. “Claims and project performance between traditional and alternative project delivery methods.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (3): 04518017. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000266.
Miller, J. B., M. J. Garvin, C. W. Ibbs, and S. E. Mahoney. 2000. “Toward a new paradigm: Simultaneous use of multiple project delivery methods.” J. Manage. Eng. 16 (3): 58–67. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:3(58).
Molenaar, K., C. Zimring, and G. Augenbroe. 1998. Guide to project delivery for federal buildings. Washington, DC: U.S. General Services Administration.
Molenaar, K. R., A. D. Songer, and M. Barash. 1999. “Public-sector design/build evolution and performance.” J. Manage. Eng. 15 (2): 54–62. https://doi.org/10.1061/(ASCE)0742-597X(1999)15:2(54).
Morris, P. W. G., and G. H. Hough. 1987. The anatomy of major projects: A study of the reality of project management. Chichester, UK: Wiley.
Mostafavi, A., and M. Karamouz. 2010. “Selecting appropriate project delivery system: Fuzzy approach with risk analysis.” J. Constr. Eng. Manage. 136 (8): 923–930. https://doi.org/10.1061/ASCECO.1943-7862.0000190.
MPO (Management and Planning Organization of Iran). 2005. The rules and standards of the design-build method. Tehran, Iran: MPO.
MPO (Management and Planning Organization of Iran). 2006. Study and investigation of various delivery methods. Tehran, Iran: MPO.
Mungle, S., L. Benyoucef, Y. Son, and M. K. Tiwari. 2013. “A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project.” Eng. Appl. Artif. Intell. 26 (8): 1953–1966. https://doi.org/10.1016/j.engappai.2013.05.006.
Nazari, A., S. Vandadian, and H. Abdirad. 2017. “Fuzzy AHP model for prequalification of engineering consultants in the Iranian public procurement system.” J. Manage. Eng. 33 (2): 04016042. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000489.
Noorzai, E., K. Gharouni Jafari, R. Heshmatnezhad, and B. Vahedi. 2015. “Implementing AHP approach to select an appropriate financing method for PPP highway projects in Iran.” Int. J. Struct. Civ. Eng. Res. 5 (1): 74–79. https://doi.org/10.18178/ijscer.5.1.67-73.
Noorzai, E., A. Hosseini, K. Gharouni Jafari, and M. Aghaeipoor. 2016. “Providing a model to select an optimum multifamily housing method in Iran.” J. Archit. Eng. 23 (2): 04016019. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000236.
Okunlola Ojo, S., O. Aina, and A. Yakeen Adeyemi. 2011. “A comparative analysis of the performance of traditional contracting and design-build procurements on client objectives in Nigeria.” J. Civ. Eng. Manage. 17 (2): 227–233. https://doi.org/10.3846/13923730.2011.574449.
Omar, H. A., W. Zhuang, and L. Li. 2014. “On multihop communications for in-vehicle Internet access based on a TDMA MAC protocol.” In Proc., IEEE INFOCOM 2014: IEEE Conf. on Computer Communications, 1770–1778. New York: IEEE.
Omar, H. A., W. Zhuang, and L. Li. 2015. “Gateway placement and packet routing for multihop in-vehicle internet access.” IEEE Trans. Emerging Top. Comput. 3 (3): 335–351. https://doi.org/10.1109/TETC.2015.2395077.
Oyetunji, A. A., and S. D. Anderson. 2006. “Relative effectiveness of project delivery and contract strategies.” J. Constr. Eng. Manage. 132 (1): 3–13. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(3).
Pacagnella, A. C., S. L. Silva, O. Pacifico, P. S. A. Ignacio, and A. L. Silva. 2019. “Critical success factors for project manufacturing environments.” Project Manage. J. 50 (2): 243–258. https://doi.org/10.1177/8756972819827670.
Pakkala, P. 2002. Innovative project delivery methods for infrastructure. International perspective. Helsinki, Finland: Finnish Road Enterprise.
Parchami Jalal, M., E. Noorzai, and T. Yavari Roushan. 2019. “Root cause analysis of the most frequent claims in the building industry through the SCoP3E Ishikawa Diagram.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (2). https://doi.org/10.1061/(ASCE)LA.1943-4170.0000289.
Park, H. S., D. Lee, S. Kim, and J. L. Kim. 2015. “Comparing project performance of design-build and design-bid-build methods for large-sized public apartment housing projects in Korea.” J. Asian Arch. Build. Eng. 14 (2): 323–330. https://doi.org/10.3130/jaabe.14.323.
Pradeep, J., and V. C. Nair. 2013. “A scientific approach to prioritizing highway infrastructure investment schemes.” Procedia Social Behav. Sci. 104 (Dec): 932–941. https://doi.org/10.1016/j.sbspro.2013.11.188.
Ribreau, N. 2004. “Highway maintenance outsourcing experience: Synopsis of Washington State department of transportation’s review.” Transp. Res. Rec. 1877 (1): 3–9. https://doi.org/10.3141/1877-01.
Saaty, T. L., and L. G. Vargas. 2000. Models, methods, concepts and applications of the analytic hierarchy process. Boston: Kluwer Academic Publishers.
Salamat, V., A. Aliahmadi, M. Pishvaee, and K. Hafeez. 2018. “A robust fuzzy possibilistic AHP approach for partner selection in international strategic alliance.” Decis. Sci. Lett. 7 (4): 481–502. https://doi.org/10.5267/j.dsl.2017.12.002.
Segal, G. F., A. T. Moore, and S. McCarthy. 2003. Contracting for road and highway maintenance. Los Angeles: Reason Public Policy Institute.
Shrestha, P. P., and J. D. Fernane. 2016. “Performance of design-build and design-bid-build projects for public universities.” J. Constr. Eng. Manage. 143 (3): 04016101. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001241.
Shrestha, P. P., J. T. O’Connor, and G. E. Gibson. 2012. “Performance comparison of large design-build and design-bid-build highway projects.” J. Constr. Eng. Manage. 138 (1): 1–13. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000390.
Söderlund, J. 2018. “A reflection of the state-of-the-art in megaproject research: The Oxford Handbook of Megaproject Management.” Project Manage. J. 48 (6): 132–137. https://doi.org/10.1177/875697281704800610.
Tang, P., D. Cass, and A. Mukherjee. 2013. “Investigating the effect of construction management strategies on project greenhouse gas emissions using interactive simulation.” J. Cleaner Prod. 54 (Sep): 78–88. https://doi.org/10.1016/j.jclepro.2013.03.046.
TCRP (Transit Cooperative Research Program). 2009. A guidebook for the evaluation of project delivery methods. Washington, DC: Transportation Research Board of the National Academies.
Touran, A., D. D. Gransberg, K. R. Molenaar, and K. Ghavamifar. 2011. “Selection of project delivery method in transit: Drivers and objectives.” J. Manage. Eng. 27 (1): 21–27. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000027.
Tran, D., and Molenaar, K. 2012. “Critical risk factors in project delivery method selection for highway projects.” In Proc., Construction Research Congress 2012: Construction Challenges in a Flat World, 331–340. Reston, VA: ASCE.
Tran, D. Q., C. M. Harper, K. R. Molenaar, N. F. Haddad, and M. M. Scholfield. 2013. “Project delivery selection matrix for highway design and construction.” Transp. Res. Rec. 2347 (1): 3–10. https://doi.org/10.3141/2347-01.
Tran, D. Q., and K. R. Molenaar. 2015. “Risk-based project delivery selection model for highway design and construction.” J. Constr. Eng. Manage. 141 (12): 04015041. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001024.
Transportation Research Institute. 2011. Selection procedure of type of contracts in construction projects of highway, freeway and railway in corporation of construction and development of national transportation infrastructures. Tehran, Iran: Iran’s Ministry of Roads and Urban Development.
Tsai, C. Y., and A. S. Chang. 2012. “Framework for developing construction sustainability items: The example of highway design.” J. Cleaner Prod. 20 (1): 127–136. https://doi.org/10.1016/j.jclepro.2011.08.009.
Williams, T. 2017. “The nature of risk in complex projects.” Project Manage. J. 48 (4): 55–66. https://doi.org/10.1177/875697281704800405.
Xia, B., A. Chan, K. Molenaar, and M. Skitmore. 2012. “Determining the appropriate proportion of owner-provided design in design-build contracts: Content analysis approach.” J. Constr. Eng. Manage. 138 (9): 1017–1022. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000522.
Xiaowei, L. 2013. “Decision-making method of highway network planning based on prospect theory.” Procedia Social Behav. Sci. 96 (Nov): 2042–2050. https://doi.org/10.1016/j.sbspro.2013.08.230.
Yu, T., G. Q. Shen, and Q. Shi. 2016. “Comparing the performance quality of design-bid-build and design-build delivery methods.” J. Constr. Eng. Manage. 143 (4): 04016111. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001262.
Zavadskas, E. K., Z. Turskis, and J. Tamosaitiene. 2011. “Selection of construction enterprises management strategy based on the SWOT and multi-criteria analysis.” J. Arch. Civ. Mech. Eng. 11 (4): 1063–1082. https://doi.org/10.1016/S1644-9665(12)60096-X.
Zhao, X., L. Chen, W. Pan, and Q. Lu. 2017. “AHP-ANP–fuzzy integral integrated network for evaluating performance of innovative business models for sustainable building.” J. Constr. Eng. Manage. 143 (8): 04017054. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001348.
Zheng, S., and J. Chen. 2012. “The study of the core concept of safety culture in highway engineering construction projects.” Syst. Eng. Procedia 4: 460–467. https://doi.org/10.1016/j.sepro.2012.01.011.
Zhou, H., H. Zhou, and Z. Tian. 2013. “An analysis of internal control problem of state-owned highway construction enterprise: Take Huanyu Highway Construction & Development Co., Ltd. as an example.” Procedia Comput. Sci. 17: 314–323. https://doi.org/10.1016/j.procs.2013.05.041.

Information & Authors

Information

Published In

Go to Journal of Infrastructure Systems
Journal of Infrastructure Systems
Volume 26Issue 2June 2020

History

Received: Dec 6, 2018
Accepted: Aug 20, 2019
Published online: Jan 21, 2020
Published in print: Jun 1, 2020
Discussion open until: Jun 21, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Lecturer, Faculty of Architecture, Dept. of Project and Construction Management, Univ. of Tehran, Tehran 1415564583, Iran. ORCID: https://orcid.org/0000-0001-5547-1158. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share