Evaluation and Ranking of Risk Factors in Transnational Public–Private Partnerships Projects: Case Study Based on the Intuitionistic Fuzzy Analytic Hierarchy Process

Publication: Journal of Infrastructure Systems
Volume 24, Issue 4

Abstract

Due to the growing trend of world economic globalization and “The Belt and Road” initiative launched by the Chinese government, transnational public–private partnership (TPPP) has become a crucial way for construction and investment companies to invest in other countries. However, investing in another country for PPP projects is not free of risks, due mainly to unfamiliarity with different environments and conditions. This paper aims at identifying and evaluating risk factors in TPPP projects. Drawing on the X hydropower project, the identified 22 critical risk factors affecting the TPPP project were assessed by industry experts who had direct involvement in the project. The intuitionistic fuzzy analytic hierarchy process (IFAHP) technique was used in the assessment of the risk factors. The results indicated that technology, natural environment, construction, administrative, and political risk were the top five risk factors. The findings of this study improve the understanding of the risk factors in TPPP projects and could be useful for risk management professionals and researchers. Future research is needed to develop risk assessment and management models for TPPP projects based on current risk factors in TPPP projects.

Get full access to this article

View all available purchase options and get full access to this article.

References

Aliu, I. R., O. E. Adeyemi, and A. Adebayo. 2014. “Municipal household solid waste collection strategies in an African megacity: Analysis of public private partnership performance in Lagos.” Supplement, Waste Manage. Res. 32 (S9): 67–78. https://doi.org/10.1177/0734242X14544354.
Ameyaw, E. E., and A. P. Chan. 2015a. “Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach.” Expert Syst. Appl. 42 (12): 5102–5116. https://doi.org/10.1016/j.eswa.2015.02.041.
Ameyaw, E. E., and A. P. Chan. 2015b. “Risk ranking and analysis in PPP water supply infrastructure projects: An international survey of industry experts.” Facilities 33 (7–8): 428–453. https://doi.org/10.1108/F-12-2013-0091.
Ameyaw, E. E., A. P. Chan, D.-G. Owusu-Manu, D. J. Edwards, and F. Dartey. 2017. “A fuzzy-based evaluation of financial risks in build-own–operate-transfer water supply projects.” J. Infrastruct. Syst. 23 (4): 04017033. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000390.
Atanassov, K. 1999. Intuitionistic fuzzy sets: Theory and applications. New York: Physica.
Atanassov, K., and G. Gargov. 1989. “Interval valued intuitionistic fuzzy sets.” Fuzzy Sets Syst. 31 (3): 343–349. https://doi.org/10.1016/0165-0114(89)90205-4.
Atanassov, K., G. Pasi, and R. Yager. 2005. “Intuitionistic fuzzy interpretations of multi-criteria multi-person and multi-measurement tool decision making.” Int. J. Syst. Sci. 36 (14): 859–868. https://doi.org/10.1080/00207720500382365.
Babatunde, S. O., S. Perera, L. Zhou, and C. Udeaja. 2015. “Barriers to public private partnership projects in developing countries a case of Nigeria.” Eng. Constr. Archit. Manage. 22 (6): 669–691. https://doi.org/10.1108/ECAM-12-2014-0159.
Babovic, F., V. Babovic, and A. Mijic. 2017. “Antifragility and the development of urban water infrastructure.” Int. J. Water Resour. Dev. 34 (4): 499–509. https://doi.org/10.1080/07900627.2017.1369866.
Beisheim, M., and S. Campe. 2012. “Transnational public-private partnerships’ performance in water governance: Institutional design matters.” Environ. Plann. C Government Policy 30 (4): 627–642. https://doi.org/10.1068/c1194.
Bing, L., A. Akintoye, P. J. Edwards, and C. Hardcastle. 2005. “The allocation of risk in PPP/PFI construction projects in the UK.” Int. J. Project Manage. 23 (1): 25–35. https://doi.org/10.1016/j.ijproman.2004.04.006.
Buckley, J. J. 1985. “Fuzzy hierarchical analysis.” Fuzzy Sets Syst. 17 (3): 233–247. https://doi.org/10.1016/0165-0114(85)90090-9.
Buurman, J., and V. Babovic. 2017. “Adaptation pathways and real options analysis: An approach to deep uncertainty in climate change adaptation policies.” Policy Soc. 35 (2): 137–150. https://doi.org/10.1016/j.polsoc.2016.05.002.
Buurman, J., S. Zhang, and V. Babovic. 2009. “Reducing risk through real options in systems design: The case of architecting a maritime domain protection system.” Risk Anal. 29 (3): 366–379. https://doi.org/10.1111/j.1539-6924.2008.01160.x.
Cabaniss, K. 2002. “Computer-related technology use by counselors in the new millennium: A Delphi study.” J. Technol. Counseling 2 (2): 3–34.
Chan, A. P., P. T. Lam, Y. Wen, E. E. Ameyaw, S. Wang, and Y. Ke. 2014. “Cross-sectional analysis of critical risk factors for PPP water projects in China.” J. Infrastruct. Syst. 21 (1): 04014031. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000214.
Chan, F. T., and N. Kumar. 2007. “Global supplier development considering risk factors using fuzzy extended AHP-based approach.” Omega 35 (4): 417–431. https://doi.org/10.1016/j.omega.2005.08.004.
Chang, D.-Y. 1996. “Applications of the extent analysis method on fuzzy AHP.” Eur. J. Oper. Res. 95 (3): 649–655. https://doi.org/10.1016/0377-2217(95)00300-2.
Chou, J. S., and D. Pramudawardhani. 2015. “Cross-country comparisons of key drivers, critical success factors and risk allocation for public-private partnership projects.” Int. J. Project Manage. 33 (5): 1136–1150. https://doi.org/10.1016/j.ijproman.2014.12.003.
Dağdeviren, M., and İ. Yüksel. 2008. “Developing a fuzzy analytic hierarchy process (AHP) model for behavior-based safety management.” Inf. Sci. 178 (6): 1717–1733. https://doi.org/10.1016/j.ins.2007.10.016.
De, S. K., R. Biswas, and A. R. Roy. 2001. “An application of intuitionistic fuzzy sets in medical diagnosis.” Fuzzy Sets Syst. 117 (2): 209–213. https://doi.org/10.1016/S0165-0114(98)00235-8.
Deschrijver, G., and E. E. Kerre. 2003. “On the composition of intuitionistic fuzzy relations.” Fuzzy Sets Syst. 136 (3): 333–361. https://doi.org/10.1016/S0165-0114(02)00269-5.
Dey, P. K., and S. O. Ogunlana. 2004. “Selection and application of risk management tools and techniques for build-operate-transfer projects.” Ind. Manage. Data Syst. 104 (4): 334–346. https://doi.org/10.1108/02635570410530748.
Ebrahimnejad, S., S. M. Mousavi, and H. Seyrafianpour. 2010. “Risk identification and assessment for build-operate–transfer projects: A fuzzy multi attribute decision making model.” Expert Syst. Appl. 37 (1): 575–586. https://doi.org/10.1016/j.eswa.2009.05.037.
Hall, D. J. 2002. The water multinationals 2002: Financial and other problems. London: Public Services International Research Unit.
Herrera-Viedma, E., F. Chiclana, F. Herrera, and S. Alonso. 2007. “Group decision-making model with incomplete fuzzy preference relations based on additive consistency.” IEEE Trans. Syst. Man Cybern. Part B Cybern. 37 (1): 176–189. https://doi.org/10.1109/TSMCB.2006.875872.
Hodge, G. A., and C. Greve. 2007. “Public-private partnerships: An international performance review.” Public Administration Rev. 67 (3): 545–558. https://doi.org/10.1111/j.1540-6210.2007.00736.x.
Jacobs, J., and R. Franceys. 2008. “Better practice in supplying water to the poor in global PPPs.” Proc. Inst. Civ. Eng. Munic. Eng. 161 (4): 247–254.
Kaur, P. 2014. “Selection of vendor based on intuitionistic fuzzy analytical hierarchy process.” Adv. Oper. Res. 2014: 1–10.
Ke, Y., S. Wang, and A. P. Chan. 2011a. “Equitable risks allocation of projects inside China: Analyses from Delphi survey studies.” Chin. Manage. Stud. 5 (3): 298–310. https://doi.org/10.1108/17506141111163372.
Ke, Y., S. Wang, A. P. Chan, and E. Cheung. 2009. “Research trend of public-private partnership in construction journals.” J. Constr. Eng. Manage. 135 (10): 1076–1086. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:10(1076).
Ke, Y., S. Wang, A. P. Chan, and E. Cheung. 2011b. “Understanding the risks in China’s PPP projects: Ranking of their probability and consequence.” Eng. Constr. Archit. Manage. 18 (5): 481–496. https://doi.org/10.1108/09699981111165176.
Kulak, O., M. B. Durmuşoğlu, and C. Kahraman. 2005. “Fuzzy multi-attribute equipment selection based on information axiom.” J. Mater. Process. Technol. 169 (3): 337–345. https://doi.org/10.1016/j.jmatprotec.2005.03.030.
Kulak, O., and C. Kahraman. 2005. “Fuzzy multi-attribute selection among transportation companies using axiomatic design and analytic hierarchy process.” Inf. Sci. 170 (2): 191–210. https://doi.org/10.1016/j.ins.2004.02.021.
Kwong, C.-K., and H. Bai. 2010. “Determining the importance weights for the customer requirements in QFD using a fuzzy AHP with an extent analysis approach.” IIE Trans. 35 (7): 619–626. https://doi.org/10.1080/07408170304355.
Li, J., and P. X. Zou. 2011. “Fuzzy AHP-based risk assessment methodology for PPP projects.” J. Constr. Eng. Manage. 137 (12): 1205–1209. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000362.
Liu, J., and C. Y. Cheah. 2009. “Real option application in PPP/PFI project negotiation.” Constr. Manage. Econ. 27 (4): 331–342. https://doi.org/10.1080/01446190902807071.
Lobina, E. 2005. “Problems with private water concessions: A review of experiences and analysis of dynamics.” Int. J. Water Resour. Dev. 21 (1): 55–87. https://doi.org/10.1080/0790062042000313304.
Luehrman, T. A. 1998a. Investment opportunities as real options: Getting started on the numbers. Boston: Harvard Business Review.
Luehrman, T. A. 1998b. “Strategy as a portfolio of real options.” Harv. Bus. Rev. 76: 89–101.
Meduri, S. S., and T. R. Annamalai. 2012. “Unit costs of public and ppp road projects: evidence from india.” J. Constr. Eng. Manage. 139 (1): 35–43. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000546.
Meng, X., Q. Zhao, and Q. Shen. 2011. “Critical success factors for transfer-operate-transfer urban water supply projects in China.” J. Manage. Eng. 27 (4): 243–251. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000058.
Merna, A., and N. J. Smith. 1993. Guide to the preparation and evaluation of build-own-operate-transfer (BOOT) project tenders. Hong Kong: Asia Law and Practice.
Mitchell, H. 2004. “A correlation coefficient for intuitionistic fuzzy sets.” Int. J. Intell. Syst. 19 (5): 483–490. https://doi.org/10.1002/int.20004.
Muller, M. 2003. “Public-private partnerships in water: A South African perspective on the global debate.” J. Int. Dev. 15 (8): 1115–1125. https://doi.org/10.1002/jid.1055.
Ng, A., and M. Loosemore. 2007. “Risk allocation in the private provision of public infrastructure.” Int. J. Project Manage. 25 (1): 66–76. https://doi.org/10.1016/j.ijproman.2006.06.005.
Nguyen, H. 2016. “An application of intuitionistic fuzzy analytic hierarchy process in ship system risk estimation.” J. KONES 23 (3): 365–372.
Ozdoganm, I. D., and M. Talat Birgonul. 2010. “A decision support framework for project sponsors in the planning stage of build-operate-transfer (BOT) projects.” Constr. Manage. Econ. 18 (3): 343–353. https://doi.org/10.1080/014461900370708.
Papageorgiou, E. I., and D. K. Iakovidis. 2013. “Intuitionistic fuzzy cognitive maps.” IEEE Trans. Fuzzy Syst. 21 (2): 342–354. https://doi.org/10.1109/TFUZZ.2012.2214224.
Parola, F., T. Notteboom, G. Satta, and J.-P. Rodrigue. 2013. “Analysis of factors underlying foreign entry strategies of terminal operators in container ports.” J. Transp. Geogr. 33: 72–84. https://doi.org/10.1016/j.jtrangeo.2013.09.010.
Rajaprakash, S., and R. Ponnusamy. 2015. “Ranking business scorecard factor using intuitionistic fuzzy analytical hierarchy process with fuzzy Delphi method in automobile sector.” In Proc. Int. Conf. on Mining Intelligence and Knowledge Exploration, 437–448. Cham: Springer.
Rajaprakash, S., and R. Ponnusamy. 2016. “Determining the balance scorecard in sheet metal industry using the intuitionistic fuzzy analytical hierarchy process with fuzzy Delphi method.” In Proc., Int. Conf. on Mining Intelligence and Knowledge Exploration, 105–118. Cham: Springer.
Ramakrishnan, T. S. 2014. “Financing infrastructure projects through public-private partnerships in India.” Transp. Res. Rec. 2450 (1): 118–126. https://doi.org/10.3141/2450-15.
Rebeiz, K. S. 2012. “Public-private partnership risk factors in emerging countries: BOOT illustrative case study.” J. Manage. Eng. 28 (4): 421–428. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000079.
Ritter, R. 2010. “Transnational governance in global finance: The principles for stable capital flows and fair debt restructuring in emerging markets.” Int. Stud. Perspect. 11 (3): 222–241. https://doi.org/10.1111/j.1528-3585.2010.00405.x.
Saaty, T. L. 1988. “What is the analytic hierarchy process?” In Mathematical models for decision support, 109–121. Cham: Springer.
Sadiq, R., and S. Tesfamariam. 2009. “Environmental decision-making under uncertainty using intuitionistic fuzzy analytic hierarchy process (IF-AHP).” Stochastic Environ. Res. Risk Assess. 23 (1): 75–91. https://doi.org/10.1007/s00477-007-0197-z.
Salman, A. F., M. J. Skibniewski, and I. Basha. 2007. “BOT viability model for large-scale infrastructure projects.” J. Constr. Eng. Manage. 133 (1): 50–63. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:1(50).
Schäferhoff, M., S. Campe, and C. Kaan. 2009. “Transnational public-private partnerships in international relations: Making sense of concepts, research frameworks, and results.” Int. Stud. Rev. 11 (3): 451–474. https://doi.org/10.1111/j.1468-2486.2009.00869.x.
Spector, P. E. 1994. “Using self-report questionnaires in OB research: A comment on the use of a controversial method.” J. Organ. Behav. 15 (5): 385–392. https://doi.org/10.1002/job.4030150503.
Szmidt, E., and J. Kacprzyk. 2009. “Amount of information and its reliability in the ranking of Atanassov’s intuitionistic fuzzy alternatives.” In Recent advances in decision making, 7–19. Springer.
Thomas, A., S. N. Kalidindi, and L. Ganesh. 2006. “Modelling and assessment of critical risks in BOT road projects.” Constr. Manage. Econ. 24 (4): 407–424. https://doi.org/10.1080/01446190500435275.
Tijhuis, W. 2015. “Managing public−private partnerships: Dealing with business-culture influences.” Built Environ. Project Asset Manage. 5 (1): 23–34. https://doi.org/10.1108/BEPAM-06-2013-0018.
Van Laarhoven, P., and W. Pedrycz. 1983. “A fuzzy extension of Saaty’s priority theory.” Fuzzy Sets Syst. 11 (1–3): 229–241. https://doi.org/10.1016/S0165-0114(83)80082-7.
Wang, S. Q., and L. K. Tiong. 2000. “Case study of government initiatives for PRC’s BOT power plant project.” Int. J. Project Manage. 18 (1): 69–78. https://doi.org/10.1016/S0263-7863(98)00072-6.
Wang, S. Q., R. L. K. Tiong, S. K. Ting, and D. Ashley. 2000. “Evaluation and management of foreign exchange and revenue risks in China’s BOT projects.” Constr. Manage. Econ. 18 (2): 197–207. https://doi.org/10.1080/014461900370825.
Wang, S. Q., R. L. K. Tiong, S. K. Ting, D. Chew, and D. Ashley. 1998. “Evaluation and competitive tendering of BOT power plant project in China.” J. Constr. Eng. Manage. 124 (4): 333–341 https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(333).
Wibowo, A., and H. W. Alfen. 2015. “Government-led critical success factors in PPP infrastructure development.” Built Environ. Project Asset Manage. 5 (1): 121–134. https://doi.org/10.1108/BEPAM-03-2014-0016.
Xu, Y., J. F. Yeung, A. P. Chan, D. W. Chan, S. Q. Wang, and Y. Ke. 2010. “Developing a risk assessment model for PPP projects in China—A fuzzy synthetic evaluation approach.” Autom. Constr. 19 (7): 929–943. https://doi.org/10.1016/j.autcon.2010.06.006.
Xu, Z. 2007. “Intuitionistic preference relations and their application in group decision making.” Inf. Sci. 177 (11): 2363–2379. https://doi.org/10.1016/j.ins.2006.12.019.
Xu, Z., and H. Liao. 2014. “Intuitionistic fuzzy analytic hierarchy process.” IEEE Trans. Fuzzy Syst. 22 (4): 749–761. https://doi.org/10.1109/TFUZZ.2013.2272585.
Yu, Y., A. P. Chan, C. Chen, and A. Darko. 2018. “Critical risk factors of transnational public-private partnership projects: Literature review.” J. Infrastruct. Syst. 24 (1): 04017042. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000405.
Zavala, A. H., and O. C. Nieto. 2012. “Fuzzy hardware: A retrospective and analysis.” IEEE Trans. Fuzzy Syst. 20 (4): 623–635. https://doi.org/10.1109/TFUZZ.2011.2181179.
Zeng, S., T. Wan, C. M. Tam, and D. Liu. 2008. “Identifying risk factors of BOT for water supply projects.” In Proc., Institution of Civil Engineers-Water Management, 73–81. London: Institution of Civil Engineers Water Management.

Information & Authors

Information

Published In

Go to Journal of Infrastructure Systems
Journal of Infrastructure Systems
Volume 24Issue 4December 2018

History

Received: Nov 15, 2017
Accepted: May 10, 2018
Published online: Aug 22, 2018
Published in print: Dec 1, 2018
Discussion open until: Jan 22, 2019

Permissions

Request permissions for this article.

Authors

Affiliations

Joint Ph.D. Candidate, Business School, Sichuan Univ., Chengdu, Sichuan 610065, China; Joint Ph.D. Candidate, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong 999077, China. Email: [email protected]
Ph.D. Candidate, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong 999077, China. Email: [email protected]
Albert P. C. Chan [email protected]
Chair Professor and Head, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong 999077, China. Email: [email protected]
Chuan Chen, A.M.ASCE [email protected]
Professor, Business School, Sichuan Univ., Chengdu, Sichuan 610065, China (corresponding author). Email: [email protected]
Joint Ph.D. Candidate, Institute for Disaster Management and Reconstruction, Sichuan Univ., Chengdu, Sichuan 610065, China; Joint Ph.D. Candidate, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong 999077, China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share