Cost and Environmental Evaluation of Flexible Strategies for a Highway Construction Project under Traffic Growth Uncertainty
Publication: Journal of Infrastructure Systems
Volume 21, Issue 3
Abstract
Uncertainty about the scale of future demand presents a challenge for infrastructure design. The attraction of flexible strategies, incorporating upgrade options that can be exercised when and if required, has been recognized for a long time. The techniques of real options allowed the benefits of flexible strategies to be quantified for the first time. A new and simplified methodology for real options analysis has been developed and implemented in software. It performs evaluation in both cost and environmental impact terms. A case study of a real highway in Spain was evaluated using the new methodology and software. Seven alternative strategies for the roadway (subgrade, base course, and surface course) were evaluated, six with upgrade options that are exercised if the traffic demand crosses specified thresholds. The rate of traffic growth, and also the discount rate for financial evaluation, were treated as uncertain variables. The highway was designed when the Spanish economy was growing strongly and a high roadway specification performed best. Before the highway was built the economy crashed and construction was canceled. Recalculation for the posteconomic shock conditions with lower traffic growth and a higher interest rate favored a lower highway specification with upgrade options. Sensitivity analysis shows how the specification choice varies with the values taken by the uncertain variables. A novel specification was proposed to maximize flexibility when there is high uncertainty about traffic growth, and evaluation showed that it performed better in many conditions. The methodology of evaluating flexible strategies could be used in many applications, including infrastructure for climate change adaptation.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The case study was carried out as part of the collaborative CILECCTA project funded by the European Community’s Program FP7/2007-2013 for Research, Technological Development and Demonstration Activities, under EC Grant Agreement no. 229061. The project duration was 2009–2013. The full project name is A User-Oriented Knowledge-Based Suite of Construction Industry Life Cycle Cost and Assessment Software for Pan-European Determination and Costing of Sustainable Projects. See www.cileccta.eu. The case study data was provided by APIA XXI, an engineering company based in Santander, Spain, and a participant in the CILECCTA project. See www.apiaxxi.es
References
Amram, M., and Kulatilaka, N. (1999). Real options: Managing strategic investments in an uncertain world, Harvard Business School Press, Boston.
Barry, E. M. (1881). Lectures on architecture delivered at the Royal Academy, Murray, London.
Black, F., and Scholes, M. (1973). “The pricing of options and corporate liabilities.” J. Political Econ., 81(3), 637–654.
Chiara, N., Garvin, M. J., and Vecer, J. (2007). “Valuing simple multiple-exercise real options in infrastructure projects.” J. Infrastruct. Syst., 97–104.
Copeland, T., and Antikarov, V. (2001). Real options: A practitioner’s guide, Texere, New York.
Damnjanovic, I., Duthie, J., and Waller, S. T. (2008). “Valuation of strategic flexibility in development of toll road projects.” Constr. Manage. Econ., 26(9), 979–990.
de Neufville, R., and Scholtes, S. (2011). Flexibility in engineering design, MIT Press, Cambridge, MA.
de Neufville, R., Scholtes, S., and Wang, T. (2006). “Real options by spreadsheet: Parking garage case example.” J. Infrastruct. Syst., 107–111.
Ellingham, I., and Fawcett, W. (2006). New generation whole-life costing: Property and construction decision-making under uncertainty, Taylor and Francis, London.
European Commission. (2008). Guide to cost-benefit analysis of investment projects, Directorate General Regional Policy, Brussels, Belgium.
Fawcett, W., and Ellingham, I. (2001). “Options-based evaluation of façade refurbishment alternatives.” The whole-life performance of facades, S. Ledbetter and A. Keiller, eds., Univ. of Bath, U.K.
Fawcett, W., Hughes, M., Krieg, H., Albrecht, S., and Vennstrom, A. (2012). “Flexible strategies for long-term sustainability under uncertainty.” Build. Res. Inf., 40(5), 545–557.
Frey, R. L., ed. (1988). Encyclopedia of American business history and biography: Railroads in the nineteenth century, Facts on File, New York.
ISO. (2011). “Environmental management eco-efficiency assessment of product systems principles, requirements and guidelines.” Draft standard ISO/DIS 14045, Geneva.
König, H., Kohler, N., Kreissig, J., and Lützkendorf, T. (2010). A life cycle approach to buildings, Detail Books, Munich, Germany.
Krieg, H., Albrecht, S., Gantner, J., and Fawcett, W. (2013). “Integrated environmental and economic assessment in the construction sector.” Green design, materials and manufacturing processes, H. Bartolo, et al., eds., CRC, Abingdon, Oxfordshire, U.K., 675–680.
Kulatilaka, N. (1993). “The value of flexibility: The case of a dual-fuel industrial steam boiler.” Financial Manage., 22(3), 271–280.
Leung, B. Y. P., and Hui, E. C. M. (2002). “Option pricing for real estate development: Hong Kong Disneyland.” J. Property Investment Finance, 20(6), 473–495.
Longstaff, F. A., and Schwartz, E. S. (2001). “Valuing American options by simulation: A simple least-squares approach.” Rev. Financial Stud., 14(1), 113–147.
Mun, J. (2006). Real options analysis, 2nd Ed., Wiley, Hoboken, NJ.
Schaefer, A. (1998). “The global demand for motorized mobility.” Transp. Res. Part A Policy Pract., 32(6), 455–477.
Trigeorgis, L. (1993). “Real options and interactions with flexibility.” Financial Manage., 22(3), 202–222.
United Kingdom Treasury. (2009). “Accounting for the effects of climate change.” United Kingdom Treasury and Dept. for Environment Food and Rural Affairs, 〈https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/191501/Accounting_for_the_effects_of_climate_change.pdf〉 (Aug. 12, 2013).
Zhao, T., Sundararajan, S. K., and Tseng, C. L. (2004). “Highway development decision-making under uncertainty: A real options approach.” J. Infrastruct. Syst., 23–32.
Zhao, T., and Tseng, C. L. (2003). “Valuing flexibility in infrastructure expansion.” J. Infrastruct. Syst., 89–97.
Information & Authors
Information
Published In
Copyright
© 2014 American Society of Civil Engineers.
History
Received: Nov 26, 2013
Accepted: Jul 2, 2014
Published online: Sep 8, 2014
Discussion open until: Feb 8, 2015
Published in print: Sep 1, 2015
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.