Technical Papers
Feb 17, 2017

Sequential Irrigation Scheduling Avoiding Night Irrigation

Publication: Journal of Irrigation and Drainage Engineering
Volume 143, Issue 7

Abstract

The sequential irrigation scheduling problem is one where a set of irrigation jobs have to be scheduled sequentially. In this paper, an integer program is presented to solve this problem. The objective function is a dual-goal function that avoids night irrigation and minimizes earliness or tardiness, with the former objective taking priority over the latter. A scheduled start time cost function is introduced and is user defined to reflect the behavior and preferences (and aversions) of farmers. In this paper, the scheduled start time cost function is a piecewise linear function and uses techniques from operations research. It is linearized using the disjunctive method. The integer program is implemented in a general-purpose solver and applied to a 16-job problem to demonstrate that a schedule can be prepared that avoids night irrigation and minimizes earliness and tardiness. There is a trade-off between avoiding night irrigation and earliness and tardiness compared to earlier models that minimize only earliness and tardiness. However, the increase in earliness and tardiness for the example presented is modest.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The International Water Management Institute (IWMI) acknowledges the financial support from the Embassy of the Kingdom of Netherlands, Islamabad, Pakistan, through Grant #22294 and the CGIAR Research Program on Water, Land, and Ecosystems (WLE), which were used in part to support this study. The study design, data collection, analysis, and interpretation of the results are exclusively those of the authors and do not necessarily represent the views or opinion of IWMI.

References

Anwar, A. A., Ahmad, W., Bhatti, M. T., and Haq, Z. U. (2016). “The potential of precision surface irrigation in the Indus basin irrigation system.” Irrig. Sci., 34(5), 379–396.
Anwar, A. A., and Clarke, D. (2001). “Irrigation scheduling using mixed integer linear programming.” J. Irrig. Drain. Eng., 63–69.
Anwar, A. A., Clarke, D., and Vries, T. T. (2006). “Channel capacity under arranged demand irrigation.” Agric. Water Manage., 82(1–2), 148–160.
Arkin, E. M., and Roundy, R. O. (1991). “Weighted-tardiness scheduling on parallel machines with proportional weights.” Oper. Res., 39(1), 64–81.
Belaqziz, S., et al. (2014). “Irrigation scheduling of a classical gravity network based on the covariance matrix adaptation—Evolutionary strategy algorithm.” Comput. Electr. Agric., 102, 64–72.
Bishop, A. A., and Long, A. K. (1983). “Irrigation water delivery for equity between users.” J. Irrig. Drain. Eng., 349–356.
Clemmens, A. J., and Bos, M. G. (1990). “Statistical methods for irrigation system water delivery performance evaluation.” Irrig. Drain. Syst., 4(4), 345–365.
de Vries, T. T., and Anwar, A. A. (2004). “Irrigation scheduling. I: Integer programming approach.” J. Irrig. Drain. Eng., 9–16.
de Vries, T. T., and Anwar, A. A. (2006). “Irrigation scheduling with travel times.” J. Irrig. Drain. Eng., 220–227.
de Vries, T. T., and Anwar, A. A. (2015). “Irrigation scheduling using complex machine scheduling.” J. Irrig. Drain. Eng., .
Hess, T. (1996). “A microcomputer scheduling program for supplementary irrigation.” Comput. Electron. Agric., 15(3), 233–243.
Khepar, S. D., Gulati, H. S., Yadav, A. K., and Brar, T. P. (2000). “A model for equitable distribution of canal water.” Irrig. Sci. Irrigation Science, 19(4), 191–197.
Latif, M., and Sarwar, S. (1994). “Proposal for equitable water allocation for rotational irrigation in Pakistan.” Irrig. Drain. Syst., 8(1), 35–48.
Laycock, A., Swayne, C., and Marques, J. E. J. (2005). “Pehur high level canal, NWFP, Pakistan.” J. Water Manage., 158(3), 93–102.
Liaw, C. (1999). “A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem.” Comput. Oper. Res., 26(7), 679–693.
LINDO. (2015). Optimization modelling with LINGO, LINDO Systems, Chicago, 267–342.
Malhotra, S. P. (1982). The warabandi system and its infrastructure, Central Board of Irrigation and Power, New Delhi, India.
Marler, T. R., and Arora, J. S. (2010). “The weighted sum method for multi-objective optimization: New insights.” Struct. Multi. Optim., 41(6), 853–862.
Mohamed, H., Ahmed, E., Abbas, O., and Mohamed, A. M. (2010). “Water allocation and optimization of minor canal operation.” Agric. Biol. J. N. Am., 1(5), 1031–1043.
Nixon, J. B., Dandy, G. C., and Simpson, A. R. (2001). “A genetic algorithm for optimizing off-farm irrigation scheduling.” J. Hydroinf., 3(1), 11–22.
Palmer, J. D., Clemmens, A. J., Dedrick, A. R., Replogle, J. A., and Clyma, W. (1991). “Delivery system performance case study: Wellton-Mohawk irrigation and drainage district, USA.” Irrig. Drain. Syst., 5(1), 89–109.
Salvador, R., Latorre, B., Paniagua, P., and Playan, E. (2011). “Farmer’s scheduling patterns in on-demand pressurized irrigation.” Agric. Water Manage., 102(1), 86–96.
Shah, M. H., and Willardson, L. S. (1993). “Equitable distribution in a rotation irrigation system.” Management of Irrigation Systems: Integrated Perspectives, Conf., Park City, Utah, ASCE, Reston, VA, 24–31.
Sharma, D., and Oad, R. (1990). “Variable-time model for equitable irrigation water distribution.” Agric. Water Manage., 17(4), 367–377.
Suryavanshi, A., and Reddy, J. (1986). “Optimal operation schedule of irrigation distribution systems. Agric.” Water Manage., 11(1), 23–30.
Upcraft, M. J., Noble, D. H., and Carr, M. K. (1989). “A mixed linear programme for short-term irrigation scheduling.” J. Oper. Res. Soc., 40(10), 923–931.
Wardlaw, R., and Bhaktikul, K. (2001). “Application of a genetic algorithm for water allocation in an irrigation system.” Irrig. Drain., 50(2), 159–170.

Information & Authors

Information

Published In

Go to Journal of Irrigation and Drainage Engineering
Journal of Irrigation and Drainage Engineering
Volume 143Issue 7July 2017

History

Received: Jul 28, 2016
Accepted: Nov 28, 2016
Published online: Feb 17, 2017
Published in print: Jul 1, 2017
Discussion open until: Jul 17, 2017

Permissions

Request permissions for this article.

Authors

Affiliations

Arif A. Anwar, Ph.D., M.ASCE [email protected]
P.E.
Principal Researcher, Irrigation and Head of Office, International Water Management Institute, 12 km Multan Rd. Chowk, Thokar Niaz Baig, Lahore 5370, Pakistan (corresponding author). E-mail: [email protected]
Tonny T. de Vries, Ph.D. [email protected]
Lecturer, Dept. of Civil and Natural Resources Engineering, Univ. of Canterbury, Private Bag 4800, Christchurch 8014, New Zealand. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share