Discharge Capacity of Piano Key Weirs
Publication: Journal of Hydraulic Engineering
Volume 138, Issue 2
Abstract
In recent years, spillway rehabilitation has increased in importance and become the subject of many projects worldwide. One solution for this problem is the implementation of a new type of labyrinth spillway, called Piano Key Weir (PK-Weir ). This is an excellent alternative for increasing the overflow capacity of existing dams. Similarly to traditional labyrinth weirs, the hydraulic capacity of a PK-Weir is a function of its geometrical characteristics. Currently, there is a lack of systematic experiments, and the existing data does not allow the proposition of a universal design procedure. This paper reviews the previous studies on the efficiency of planned and built PK-Weirs. The results are evaluated by comparing an actual PK-Weir’s discharge to that theoretically obtained for a sharp-crested spillway with crest length equal to the width of the PK-Weir for a given hydraulic head. On the basis of this evaluation, a preliminary design procedure is proposed.
Get full access to this article
View all available purchase options and get full access to this article.
References
Bieri, M., Leite Ribeiro, M., Boillat, J.-L., and Schleiss, A. J. (2009). “Réhabilitation de la capacité d’évacuation des crues—Intégration de PK-Weirs sur des barrages existants.” Proc., Colloque CFBR-SHF, Dimensionnement et fonctionnement des évacuateurs de crues (CD-ROM), Société Hydrotechnique de France (SHF), Paris (in French).
Chi Hien, T., Thanh Son, H., and Ho Ta Khanh, M. (2006). “Results of some ‘piano keys’ weir hydraulic model tests in Vietnam.” Proc., 22nd Int. Congress of Large Dams, Question 87, Response 39, Vol IV, International Commission on Large Dams (ICOLD), Paris, 581–595.
Darvas, L. A. (1971). “Discussion of ‘Performance and design of labyrinth weirs’ by Hay and Taylor.” J. Hydr. Div., 97(8), 1246–1251.
Falvey, H. T. (2003). Hydraulic design of labyrinth weirs, ASCE Press, Reston, VA.
Hager, W., and Schleiss, A. J. (2009). Traité de Génie Civil, Volume 15—Constructions Hydrauliques—Ecoulements Stationnaires, Presses polytechniques et universitaires romandes, Lausanne, Switzerland.
Hay, N., and Taylor, G. (1970). “Performance and design of labyrinth weirs.” J. Hydr. Div., 96(11), 2337–2357.
Laugier, F. (2007). “Design and construction of the first piano key weir (PKW) spillway at the Goulours dam.” The Int. J. of Hydropower and Dams, 5(2007), 94–101.
Laugier, F., Lochu, A., Gille, C., Leite Ribeiro, M., and Boillat, J.-L. (2009). “Design and construction of a labyrinth PKW spillway at St-Marc dam, France.” The Int. J. of Hydropower and Dams, 5(2009), 100–107.
Leite Ribeiro, M., Boillat, J.-L., Schleiss, A., Laugier, F., and Albalat, C. (2007). “Rehabilitation of St-Marc Dam—Experimental optimization of a piano key weir.” Proc., 32nd Congress of Int. Association for Hydro-Environment Engineering and Research (IAHR) (CD-ROM), Madrid, Spain.
Leite Ribeiro, M., Bieri, M., Boillat, J.-L., Schleiss, A., Delorme, F., and Laugier, F. (2009). “Hydraulic capacity improvement of existing spillways—Design of piano key weirs.” Proc., 23rd Congress of Large Dams. Question 90, Response 43 (CD-ROM), Int. Commission on Large Dams (ICOLD), Paris.
Lempérière, F., and Ouamane, A. (2003). “The piano keys weir: A new cost-effective solution for spillways.” The Int. J. of Hydropower and Dams, 5(2003), 144–149.
Lempérière, F., Sharma, N., Mourya, R. N., Shukla, R., and Gupta, U. P. (2003). “Experimental study on labyrinth spillways.” Proc., Int. Conf. on Engineering of Dams and Appurtenant Works Including Power Houses and Transmission Systems (CD-ROM), Council of Power Utilities, New Delhi, India.
Machiels, O., Erpicum, S., Archambeau, P., Dewals, B. J., and Pirotton, M. (2009). “Large scale experimental study of piano key weirs.” Proc., 33rd Congress of Int. Association for Hydro-Environment Engineering and Research (IAHR) (CD-ROM), Madrid, Spain.
Ouamane, A., and Lempérière, F. (2006). “Design of a new economic shape of weir.” Proc., International Symposium on Dams in the Societies of the 21st Century, Int. Commission on Large Dams (ICOLD), Paris, 463–470.
Sharma, N., and Singhal, G. (2008). “A dam safety solution by piano key weir for enhanced spillway capacity.” Proc., Int. Conf. on Hydrovision, National Hydropower Association (NHA), Washington, DC.
Taylor, G. (1968). “The performance of labyrinths weirs.” Ph.D. thesis, Univ. of Nottingham, Nottingham, UK.
Tullis, J. P., Amanian, N., and Waldron, D. (1995). “Design of labyrinth spillways.” J. Hydr. Eng., 121(3), 247–255.
Information & Authors
Information
Published In
Copyright
© 2012 American Society of Civil Engineers.
History
Received: Dec 11, 2009
Accepted: Jul 11, 2011
Published online: Jul 13, 2011
Published in print: Feb 1, 2012
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.