Technical Papers
Sep 20, 2013

Distribution Shift for Wind Power Development in China: Strategy Analysis

Publication: Journal of Energy Engineering
Volume 141, Issue 3

Abstract

With regard to the risks of investment planning during the construction process of wind power projects, this paper introduces the income risks of investment planning for wind power, analyzing wind power’s investment income through the establishment of a benefit-risk evaluation model. In accordance with China’s current wind power investment, this paper calculates the wind power benefit risk of different resource areas, taking the price risk, risk of project cost, and risk of abandoned wind as analysis factors. By comparative analysis of the economic benefits of each resource area, the economic benefits of investment in a wind power project in resource areas 3 and 4 are better than resource areas 1 and 2. Simultaneously, taking into account the future wind power project’s cost trends and China’s wind power investment planning trends, the writers suggest that China’s wind power project investment focus should shift from resource areas 1 and 2 to resource areas 3 and 4.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The research reported in this paper was supported by National Natural Science Foundation of China. (numbers 71071053 and 71273090). The writers also acknowledge the financial support provided by the CRG Project G-YK60 (RGC Reference PolyU 5237/11E).

References

Bird, L. (2005). “Policies and market factors driving wind power development in the United States.” Energy Pol., 33(11), 1397–1407.
Bürer, M. J., and Wüstenhagen, R. (2009). “Which renewable energy policy is a venture capitalists’ best friend? Empirical evidence from a survey of international cleantech investors.” Energy Pol., 37(12), 4997–5007.
Butler, L., and Neuhoff, K. (2008). “Comparison of feed-in tariff, quota and auction mechanisms to support wind power development.” Renew. Energy, 33(8), 1854–1867.
Chai, J. Y., and Zhang, S. Y. (2011). “Total cost and energy cost of wind turbine generation systems for low wind speeds.” J. Tsinghua Univ. Sci. Technol., 51(3), 356–360.
Chen, B. S., and Hu, H. L. (2008). “General situation and prospect of wind power in China.” Power Syst. Technol., 32(S2), 272–275.
Dong, D. D., Zhao, D. Q., and Liao, C. P. (2007). “Overview of wind turbines research and wind power development in China.” Renew. Energy, 25(3), 72–75.
Jiang, Z. M. (2008). “Reflections on energy issues in China.” J. Shanghai Jiaotong Univ., 13(3), 257–274.
Li, Y. F. (2005). “The system construction and choice of ‘renewable energy promoting law’ of China.” J. Renmin Univ. China, 1(1), 133–140.
Liang, F. C., and Chen, L. B. (2012). “Analysis of investment benefit based on benchmark tariff for wind power project.” Energy Technol. Econ., 24(5), 21–25.
Liao, S. B., Liu, K., and Li, Z. H. (2008). “Estimation of grid based spatial distribution of wind energy resource in China.” Geo-Inform. Sci., 10(5), 551–556.
Liu, D., and Pang, S. L. (2011). “System impacts analysis for interconnection of wind farm and power grid.” Proc. Chinese Society of Universities for Electric Power System and its Automation, 156–160.
Liu, M., and Wu, F. L. (2009). “Wind power investment decision-making strategy based on real option theory.” Automat. Electric Power Syst., 33(21), 19–23.
Liu, W., Lund, H., Mathiesen, B. V., and Zhang, X. (2011). “Potential of renewable energy systems in China.” Appl. Energy, 88(2), 518–525.
Liu, W. Q., Gan, L., and Zhang, X. L. (2002). “Cost-competitive incentives for wind energy development in China: Institutional dynamics and policy changes.” Energy Pol., 30(9), 753–765.
Liu, Y., Wang, L., and Ma, G. W. (2007). “On-grid price risk identification to the generation company.” Water Power, 33(1), 4–6.
National Development and Reform Commission of China (NDRC). (2007). “The policy of coal industry.” 〈http://www.sdpc.gov.cn/zcfb/zcfbgg/2007gonggao/t20071128_175124.htm〉 (Dec. 10, 2013).
National Energy Administration (NEA). (2012). China 12th five-year plan for wind power development, Beijing.
Nevitt, P. K., and Fabozzi, F. J. (2000). Project financing, Euromoney Books, London.
Shen, Y. X., Liu, L., and Zeng, M. (2009). “Social benefit evaluation models for wind power and their applications.” East China Electric Power, 37(5), 852–855.
Sun, T., Zhao, H. X., Shen, H., Wang, W. S., Dai, H. Z., and Yang, Y. H. (2003). “Structure and analysis of wind power farm capital investment in China.” Electric Power, 36(4), 64–67.
Wang, C. X., and Zhang, Y. (2003). Wind power generation, China Electric Power, Beijing.
Wang, Z. M., and Lu, Z. N. (2008). “The economic analysis on the investment and operation of the wind power project.” Renew. Energy Resour., 26(6), 21–24.
Wu, Q., and Wu, Z. H. (2006). “On the method of engineering project risk evaluation.” J. Xi’an Univ. Arch. Technol. Nat. Sci. Ed., 38(2), 258–262.
Yu, H. Q. (2009). “China’s wind power development study of the cost and wind power generators selection.” M.S. thesis, North China Electric Power Univ., Beijing.
Zhang, B. Y., and Zhao, X. S. (2006). “Economic analysis of China wind power CDM project.” Renew. Energy, 2(1), 68–71.
Zhang, G. W., Gong, G. C., and Wu, Z. (2007). “State of the art and prospects on wind energy.” Energy Conserv. Technol., 25(1), 71–76.
Zhang, L. Y., Ye, T. L., Xin, Y. Z., Han, F., and Fan, G. (2010). “Problems and measures of power grid accommodating large scale wind power.” Proc., Chinese Society for Electrical Engineering, Beijing, 1–9.
Zhang, L. Z., Zheng, H., and Cheng, Y. (2004). Price mechanism for the regional power market, China Electric Power, Beijing.
Zhao, H. F., Qiu, W. H., and Wang, X. Z. (1997). “Fuzzy integrative evaluation method of the risk factor.” Syst. Eng. Theory Prac., 7(1), 93–96.
Zhao, S. S., Zhang, D. X., Yin, Y. H., and Shen, H. (2011). “Pricing policy and risk management strategy for wind power considering wind integration.” Power Syst. Technol., 35(5), 142–145.
Zhou, H. (2003). “Techno-economic analysis of wind power generation policy in China.” Electric Power, 36(9), 79–82.
Zhu, L., and Fan, Y. (2010). “Optimization of China’s generating portfolio and policy implications based on portfolio theory.” Energy, 35(3), 1391–1402.
Zhu, L., and Fan, Y. (2011). “A real options-based CCS investment evaluation model: Case study of China’s power generation sector.” Appl. Energy, 88(12), 4320–4333.

Information & Authors

Information

Published In

Go to Journal of Energy Engineering
Journal of Energy Engineering
Volume 141Issue 3September 2015

History

Received: Jan 29, 2013
Accepted: Sep 18, 2013
Published online: Sep 20, 2013
Discussion open until: Jul 24, 2014
Published in print: Sep 1, 2015

Permissions

Request permissions for this article.

Authors

Affiliations

Zhongfu Tan [email protected]
Professor, School of Economics and Management, North China Electric Power Univ., Beijing 102206, China (corresponding author). E-mail: [email protected]
Ph.D. Student, School of Economics and Management, North China Electric Power Univ., Beijing 102206, China. E-mail: [email protected]
Yihang Song [email protected]
Ph.D. Student, School of Economics and Management, North China Electric Power Univ., Beijing 102206, China. E-mail: [email protected]
Postgraduate Student, School of Economics and Management, North China Electric Power Univ., Beijing 102206, China. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share