Technical Papers
May 8, 2017

Contractors’ Perspective of Construction Project Complexity: Definitions, Principles, and Relevant Contributors

Publication: Journal of Professional Issues in Engineering Education and Practice
Volume 143, Issue 4

Abstract

Although construction is a complex and challenging process, an extensive search of the literature revealed that little research on project complexity has been carried out. The objective of this investigation is therefore twofold: First, to establish the general consensus of large contractors operating in Kuwait on the perception of the complexity concept in the construction industry; and second, to identify and rank the perceived importance of the contributors underpinning the project complexity principles. A structured questionnaire survey was thus distributed to a statistically representative sample of contractors. The results obtained show that contractors discern projects with high degrees of interdependencies, interactions, and interrelationships among the parts as most complex to construct. On the other hand, uncertainty, organizational complexity, and inherent complexity are recognized as the most significant principles of the complexity concept, followed by overlapping of construction activities, number of trades, and rigidity of sequence, respectively. The findings further distinguish the following factors as primary contributors to project complexity: (1) lack of uniformity due to frequent changing orders; (2) poor communication channels; (3) shortage in availability of required skilled labor; (4) lack of efficiency in information generation, transmittal, usage, and feedback; (5) lack of working or detailed drawings; (6) managing a role for the first time; (7) shortage in availability of required site management technical staff; (8) interdependencies among the different trades; (9) number of cost-significant packages or activities requiring specialty subcontractors; and (10) discrepancy and obscurity in contract documents. The outcomes can provide useful insights into the main parameters differentiated to impact project complexity, which may further be used to develop a modus operandi for complexity measurement. This will assist in identifying and evaluating, at an early stage of a project, the complexity criteria, where effective planning and control systems can be efficiently applied. Even though the results represent the perception of industry practitioners in Kuwait, the principles of data collection, analysis, and use are generic, and hence could be applied to advantage in other settings.

Get full access to this article

View all available purchase options and get full access to this article.

References

Al-Tabtabai, H. (2002). “Causes for delays in construction projects in Kuwait.” Eng. J. Qatar Univ., 15, 19–37.
Antoniadis, D., Edum-Fotwe, F., Thorpe, A., and McCaffer, R. (2008). “Exploring complexity in construction projects.” PM-04-4th SCPM and 1st IPMA/MedNet Conf., Project Management Advances, Training and Certification in the Mediterranean, Chios, Greece.
Aram, E., and Noble, D. (1999). “Educating prospective managers in the complexity of organizational life.” Manage. Learn., 30(3), 321–342.
Axelrod, R. M., Axelrod, R., and Cohen, M. (2001). Harnessing complexity: Organizational implications of scientific frontier, Simon and Schuster, New York.
Baccarini, D. (1996). “The concept of project complexity—A review.” Int. J. Project Manage., 14(4), 201–204.
Baker, T. (1994). Doing social research, 2nd Ed., McGraw-Hill, New York.
Bertelsen, S. (2003). “Complexity—Construction in a new perspective.” 11th Annual Conf. of the Int. Group for Lean Construction, Blacksburg, VA.
Biton, N., and Howell, G. (2013). “The journey of lean construction theory review and reinterpretation.” ⟨http://www.iglc.net/papers/details/878⟩ (Oct. 14, 2016).
CII (Construction Industry Institute). (1986). “Constructability: A primer.” Univ. of Texas at Austin, Austin, TX.
Collins English Dictionary and Thesaurus. (2006). Harper Collins, Glasgow, U.K.
CTC (Central Tenders Committee). (2013). “Central Tenders Committee, Council of Ministers, Classified Companies, State of Kuwait.” ⟨http://www.ctc.gov.kw⟩ (Dec. 2, 2013).
Edmonds, B. (1999). “What is complexity?—The philosophy of complexity per se with application to some examples in evolution.” The evolution of complexity, F. Heylighen and D. Aerts, eds., Kluwer, Dordrecht, Netherlands.
Geraldi, J. (2008). “The balance between order and chaos in multi-project firms: A conceptual model.” Int. J. Project Manage., 26(4), 348–356.
Gidado, K. (1996). “Project complexity: The focal point of construction production planning.” Constr. Manage. Econ., 14(3), 213–225.
Gidado, K. (2004). “Enhancing the prime contractor’s pre construction planning.” J. Constr. Res., 5(1), 87–106.
Gidado, K., and Wood, H. (2008). “Project complexity in construction.” Int. Construction Conf., Royal Institute of Chartered Surveyors, RICS COBRA, RICS Foundation, Dublin, Ireland.
Gul, S., and Khan, S. (2011). “Revisiting project complexity: Towards a comprehensive model of project complexity.” 2nd Int. Conf. on Construction and Project Management, Vol. 15, IACSIT Press, Singapore, 148–155.
Hogg, R., and Tannis, E. (2009). Probability and statistical inferences, 8th Ed., Prentice Hall, New York.
Howitt, D., and Cramer, D. (2008). Introduction to statistics in psychology, 4th Ed., Pearson, Essex, U.K.
Jarkas, A. (2013). “Primary factors influencing bid mark-up size decisions of general contractors in Kuwait.” J. Financial Manage. Property Constr., 18(1), 53–75.
Jarkas, A. (2015). “Factors influencing labour productivity in Bahrain’s construction industry.” Int. J. Constr. Manage., 15(1), 94–108.
Jarkas, A., Al Balushi, R., and Raveendranath, P. (2015). “Determinants of construction labour productivity in Oman.” Int. J. Constr. Manage., 15(4), 332–344.
Jarkas, A., and Bitar, C. (2012). “Factors affecting construction labor productivity in Kuwait.” J. Constr. Eng. Manage., 811–820.
Jarkas, A., and Haupt, T. (2015). “Major construction risk factors considered by general contractors in Qatar.” J. Eng. Des. Technol., 13(1), 165–194.
Jarkas, A., Kadri, C., and Younes, J. (2012). “A survey of factors influencing the productivity of construction operatives in the State of Qatar.” Int. J. Constr. Manage., 12(3), 1–23.
Jarkas, A., and Marenjak, S. (2014). “Significant contributors to construction cost overruns: Findings of Kuwait.” Int. J. Built Environ. Asset Manage., 1(3), 193–220.
Jarkas, A., Mubarak, S., and Kadri, C. (2014). “Critical factors determining bid/no bid decisions of contractors in Qatar.” J. Manage. Eng., 05014007.
Jarkas, A., and Radosavljevic, M. (2013). “Motivational factors impacting the productivity of construction master craftsmen in Kuwait.” J. Manage. Eng., 446–454.
Jarkas, A., and Younes, J. (2014). “Factors contributing to construction delays in the State of Qatar.” Int. J. Constr. Project Manage., 6(1), 39–62.
Klir, G. (1985). “Complexity: Some general observations.” Syst. Res., 2(2), 131–140.
Koskela, L., Howell, G., Ballard, G., and Tommelein, I. (2002). “The foundations of lean construction.” Design and construction: Building in value, R. Best and G. De Valence, eds., Butterwort-Heinemann, Elsevier Science, Oxford, U.K., 211–226.
Maguire, S., and McKelvey, B. (1999). “Complexity and management: Moving from fad to firm foundations.” Emergence, 1(2), 19–61.
McComb, S., Green, S., and Compton, W. (2007). “Team flexibility’s relationship to staffing and performance in complex projects: An empirical analysis.” J. Eng. Technol. Manage., 24(4), 293–313.
Merry, U. (1995). Coping with uncertainty—Insights from the new sciences of chaos, self-organization and complexity, Praeger Publications, Santa Barbara, CA.
Mozaffari, M., Fazli, S., and Sedaghat-Seresht, A. (2012). “Identifying the most critical project complexity factors using delphi method: The Iranian construction industry.” Manage. Sci. Lett., 2(8), 2945–2952.
Nunnaly, J. (1978). Psychometric theory, McGraw-Hill, New York.
Parker, M. (2002). “Dynamics change for fast-tracking construction project.” Proc., 19th ISARC, International Association for Automation and Robotics in Construction, Washington, DC, 81–89.
PASW [Computer software]. SPSS, Inc., Chicago.
Richardson, K., Cilliers, P., and Lissack, M. (2000). “Complexity science: A grey science for the stuff in between.” 1st Int. Conf. on Systems Thinking in Management, Deakins Univ., Burwood, VIC, Australia.
Sincich, T., Levine, D., and Stephan, D. (2002). Practical statistics by example using Microsoft Excel and Minitab, 2nd Ed., Prentice Hall, Upper Saddle River, NJ.
Uhl-Bien, M., Marion, R., and McKelvey, B. (2007). “Complexity leadership theory: Shifting leadership from the industrial age to the knowledge era.” Leadersh. Q., 18(4), 298–318.
Vidal, L., Marle, F., and Bocquet, J. (2011). “Measuring project complexity using the analytic hierarchy process.” Int. J. Project Manage., 29(6), 718–727.
Waldrop, M. (1992). Complexity: The emerging science at the edge of chaos, Simon and Schuster, New York.
Webster’s. (1913). “Connoisseur’s reference to American English—A dictionary for writers and wordsmiths.” ⟨http://www.websters1913.com/⟩ (Sep. 7, 2014).
Whitty, S., and Maylor, H. (2009). “And then came complex project management.” Int. J. Project Manage., 27(3), 304–310.
Wood, H. (2010). “Modelling project complexity at the pre construction stage.” Ph.D. thesis, Faculty of Science and Engineering, School of Environment and Technology, Univ. of Brighton, Brighton, U.K.
Wood, H., and Ashton, P. (2009). “Factors of complexity in construction projects.” Proc., 25th Annual ARCOM Conf., A. Dainty, ed., Association of Researchers in Construction Management, Nottingham, U.K., 857–866.
Wood, H., and Ashton, P. (2010). “Modelling project complexity.” Proc., 26th Annual ARCOM Conf., C. Egbu, ed., Association of Researchers in Construction Management, Leeds, U.K., 1111–1120.

Information & Authors

Information

Published In

Go to Journal of Professional Issues in Engineering Education and Practice
Journal of Professional Issues in Engineering Education and Practice
Volume 143Issue 4October 2017

History

Received: Oct 20, 2015
Accepted: Feb 14, 2017
Published online: May 8, 2017
Published in print: Oct 1, 2017
Discussion open until: Oct 8, 2017

Permissions

Request permissions for this article.

Authors

Affiliations

Abdulaziz M. Jarkas, Ph.D. [email protected]
P.Eng.
C.Eng.
Chief Projects Officer, Al Mazaya Holding Co., KSCP (Holding), P.O. Box 3546, Safat 13036, Kuwait. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share