State-of-the-Art Reviews
Nov 11, 2022

Systematic Literature Review on Success Criteria for Dam Engineering Projects

Publication: Journal of Construction Engineering and Management
Volume 149, Issue 1

Abstract

Despite the huge amount of research and diversity of project management topics, there is no well-established research on success of projects. Thus it is necessary to create models of project success and rate project performance for specific fields. Dam engineering projects have significant economic, social, and environmental impact. However, their performance over the life cycle, including strategic planning, design, construction, and operation, has not been systematically studied. Improving the performance of dam engineering projects is an area unknown to researchers and project managers. Hence, the purpose of this paper is to fill in this knowledge gap with an extensive literature review, looking at primary studies for extraction of project success criteria. Systematic review of the literature reveals that 13 items are candidates for success criteria of dam engineering projects in Australia. In this systematic literature review process, data extraction and analysis and reporting, have been tailored to answer the research question. Analysis of the selected articles using two dimensions of publication and content characteristics offers a more comprehensive perspective of the publication set in this area of research. A growing trend in the publications indicates a still emerging and growing research area, as more researchers and project practitioners are interested in the area of project success. Analysis of the content characteristics shows that despite the still-dominant Iron Triangle (time, budget, and quality) cited most often as project success criteria, new criteria are emerging, because the researchers see project success as achieving long-term objectives of the projects as well. This state-of-the-art review paper presents a comprehensive list of potential success criteria related to success of the dam engineering industry.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

No data, models, or code were generated or used during the study.

Acknowledgments

This research is supported by Research Training Program of the Australian Commonwealth Government Department of Education and Training.

References

ABCNews. 2012. “Cotter Dam to cost more than $400m.” Accessed May 19, 2017. https://www.abc.net.au/news/2012-03-27/cotter-dam-cost-update/3915224.
Adedokun, O. A., T. Egbelakin, D. O. Adedokun, and J. Adafin. 2021. “Success criteria-based impacts of risk factors on education building projects in southwestern Nigeria.” J. Eng. Des. Technol. https://doi.org/10.1108/JEDT-09-2021-0458.
Ahadzie, D. K., D. G. Proverbs, and P. O. Olomolaiye. 2008. “Critical success criteria for mass house building projects in developing countries.” Int. J. Project Manage. 26 (6): 675–687. https://doi.org/10.1016/j.ijproman.2007.09.006.
Ahlemann, F., F. El Arbi, M. G. Kaiser, and A. Heck. 2013. “A process framework for theoretically grounded prescriptive research in the project management field.” Int. J. Project Manage. 31 (1): 43–56. https://doi.org/10.1016/j.ijproman.2012.03.008.
Ahmad, T., A. A. Aibinu, and A. Stephan. 2021. “Green building success criteria: Interpretive qualitative approach.” J. Archit. Eng. 27 (1): 04020045. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000448.
Ahmadabadi, A. A., and G. Heravi. 2019. “The effect of critical success factors on project success in public-private partnership projects: A case study of highway projects in Iran.” Transp. Policy 73 (Jan): 152–161. https://doi.org/10.1016/j.tranpol.2018.07.004.
Ahsan, K., and I. Gunawan. 2010. “Analysis of cost and schedule performance of international development projects.” Int. J. Project Manage. 28 (1): 68. https://doi.org/10.1016/j.ijproman.2009.03.005.
Akbari, S., F. P. Rahimian, M. Sheikhkhoshkar, S. Banihashemi, and M. Khanzadi. 2020. “Dynamic sustainable success prediction model for infrastructure projects: A rough set based fuzzy inference system.” Constr. Innovation 20 (4): 545–567. https://doi.org/10.1108/CI-04-2019-0034.
Alashwal, A. M., N. F. Fareed, and K. M. Al-Obaidi. 2017. “Determining success criteria and success factors for international construction projects for Malaysian contractors.” Construct. Econ. Build. 17 (2): 62–80. https://doi.org/10.5130/AJCEB.v17i2.5319.
Albert, M., P. Balve, and K. Spang. 2017. “Evaluation of project success: A structured literature review.” Int. J. Managing Projects Bus. 10 (4): 796–821. https://doi.org/10.1108/IJMPB-01-2017-0004.
Aleu, F. G., and E. M. Van Aken. 2016. “Systematic literature review of critical success factors for continuous improvement projects.” Int. J. Lean Six Sigma 7 (3): 214–232. https://doi.org/10.1108/IJLSS-06-2015-0025.
Al-Tmeemy, S. M. H. M., H. Abdul-Rahman, and Z. Harun. 2011. “Future criteria for success of building projects in Malaysia.” Int. J. Project Manage. 29 (3): 337–348. https://doi.org/10.1016/j.ijproman.2010.03.003.
Ansar, A., B. Flyvbjerg, A. Budzier, and D. Lunn. 2014. “Should we build more large dams? The actual costs of hydropower megaproject development.” Energy Policy 69 (Jun): 43–56. https://doi.org/10.1016/j.enpol.2013.10.069.
Ardito, L., A. Messeni Petruzzelli, and V. Albino. 2015. “From technological inventions to new products: A systematic review and research agenda of the main enabling factors.” Eur. Manage. Rev. 12 (3): 113–147. https://doi.org/10.1111/emre.12047.
Atkinson, R. 1999. “Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria.” Int. J. Project Manage. 17 (6): 337–342. https://doi.org/10.1016/S0263-7863(98)00069-6.
Awojobi, O., and G. P. Jenkins. 2016. “Managing the cost overrun risks of hydroelectric dams: An application of reference class forecasting techniques.” Renewable Sustainable Energy Rev. 63 (Sep): 19–32. https://doi.org/10.1016/j.rser.2016.05.006.
Basu, R. 2014. “Managing quality in projects: An empirical study.” Int. J. Project Manage. 32 (1): 178–187. https://doi.org/10.1016/j.ijproman.2013.02.003.
Baurzhan, S., G. P. Jenkins, and G. O. Olasehinde-Williams. 2021. “The economic performance of hydropower dams supported by the World Bank Group, 1975–2015.” Energies 14 (9): 2673. https://doi.org/10.3390/en14092673.
Bryde, D., M. Broquetas, and J. M. Volm. 2013. “The project benefits of building information modelling (BIM).” Int. J. Project Manage. 31 (7): 971–980. https://doi.org/10.1016/j.ijproman.2012.12.001.
Bryde, D. J., and L. Robinson. 2005. “Client versus contractor perspectives on project success criteria.” Int. J. Project Manage. 23 (8): 622–629. https://doi.org/10.1016/j.ijproman.2005.05.003.
Bulk Water Alliance. 2015. Act Auditor–General’s Report. Canberra, Australia: Australian Capital Territory Government.
Callegari, C., A. Szklo, and R. Schaeffer. 2018. “Cost overruns and delays in energy megaprojects: How big is big enough?” Energy Policy 114 (Mar): 211–220. https://doi.org/10.1016/j.enpol.2017.11.059.
Carvalho, M. M. D., and R. Rabechini Jr. 2015. “Impact of risk management on project performance: The importance of soft skills.” Int. J. Prod. Res. 53 (2): 321–340. https://doi.org/10.1080/00207543.2014.919423.
Chan, A., and A. P. L. Chan. 2004. “Key performance indicators for measuring construction success.” Benchmarking: Int. J. 11 (2): 203–221. https://doi.org/10.1108/14635770410532624.
Chan, A. P. C., D. Scott, and E. W. M. Lam. 2002. “Framework of success criteria for design/build projects.” J. Manage. Eng. 18 (3): 120–128. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:3(120).
Chevrier, S. 2003. “Cross-cultural management in multinational project groups.” J. World Bus. 38 (2): 141–149. https://doi.org/10.1016/S1090-9516(03)00007-5.
Chou, J.-S., N. Irawan, and A.-D. Pham. 2013. “Project management knowledge of construction professionals: Cross-country study of effects on project success.” J. Constr. Eng. Manage. 139 (11): 04013015. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000766.
Chou, J.-S., and D. Pramudawardhani. 2014. “Cross-country comparisons of key drivers, critical success factors and risk allocation for public-private partnership projects.” Int. J. Project Manage. 33 (5): 1136–1150. https://doi.org/10.1016/j.ijproman.2014.12.003.
Cooke-Davis, T. 2002. “The real success factors on projects.” Int. J. Project Manage. 20 (3): 185–190.
Crossan, M. M., and M. Apaydin. 2010. “A multi-dimensional framework of organizational innovation: A systematic review of the literature.” J. Manage. Stud. 47 (6): 1154–1191. https://doi.org/10.1111/j.1467-6486.2009.00880.x.
de Carvalho, M., L. Patah, and D. Bido. 2015, “Project management and its effects on project success: Cross-country and cross-industry comparisons.” Int. J. Project Manage. 33 (7): 1509. https://doi.org/10.1016/j.ijproman.2015.04.004.
Doloi, H. 2009. “Analysis of pre-qualification criteria in contractor selection and their impacts on project success.” Construct. Manage. Econ. 27 (12): 1245–1263. https://doi.org/10.1080/01446190903394541.
Egwunatum, S. 2017. “A review of construction project performance estimators.” MOJ Civ. Eng. 3 (4): 00075. https://doi.org/10.15406/mojce.2017.03.00075.
Frefer, A., M. Mahmoud, H. Haleema, and R. Almamlook. 2018. “Overview success criteria and critical success factors in project management.” Ind. Eng. Manage. 7 (1): 1–6.
Friday, D. 2018. “Collaborative risk management: A systematic literature review.” Int. J. Phys. Distrib. Logist. Manage. 48 (3): 231–253. https://doi.org/10.1108/IJPDLM-01-2017-0035.
Frödell, M., P. E. Josephson, and G. Lindahl. 2008. “Swedish construction clients’ views on project success and measuring performance.” J. Eng. Des. Technol. 6 (1): 21–32. https://doi.org/10.1108/17260530810863316.
Gomersall, J. S., Y. T. Jadotte, Y. Xue, S. Lockwood, D. Riddle, and A. Preda. 2015. “Conducting systematic reviews of economic evaluations.” Int. J. Evidence-Based Healthcare 13 (3): 170–178. https://doi.org/10.1097/XEB.0000000000000063.
Gomezdelcampo, E. 2014. Vol. 52 of The hydropolitics of dams: Engineering or ecosystems? 293. Middletown, NJ: American Library Association dba CHOICE.
Hallinger, P. 2013. “A conceptual framework for systematic reviews of research in educational leadership and management.” J. Educ. Administration 51 (2): 126–149. https://doi.org/10.1108/09578231311304670.
Heravi, G., and A. Gholami. 2018. “The influence of project risk management maturity and organizational learning on the success of power plant construction projects.” Project Manage. J. 49 (5): 22–37. https://doi.org/10.1177/8756972818786661.
Idrus, A., M. Sodangi, and M. H. Husin. 2011. “Prioritizing project performance criteria within client perspective.” Res. J. Appl. Sci. Eng. Technol. 3 (10): 1142–1151.
Ika, L. A. 2009. “Project success as a topic in project management journals.” Project Manage. J. 40 (4): 6–19. https://doi.org/10.1002/pmj.20137.
Jha, K. N., and C. T. Chockalingam. 2009. “Prediction of quality performance using artificial neural networks: Evidence from Indian construction projects.” J. Adv. Manage. Res. 6 (1): 70–86. https://doi.org/10.1108/09727980910972172.
Jha, K. N., and K. C. Iyer. 2007. “Commitment, coordination, competence and the Iron Triangle.” Int. J. Project Manage. 25 (5): 527–540. https://doi.org/10.1016/j.ijproman.2006.11.009.
Jugdev, K., and R. Müller. 2005. “A retrospective look at our evolving understanding of project success.” Project Manage. J. 36 (4): 19–31. https://doi.org/10.1177/875697280503600403.
Kerzner, H. 2014. Project management 2.0: Leveraging tools, distributed collaboration, and metrics for project success. Hoboken, NJ: Wiley.
Khan, K., J. R. Turner, T. Maqsood, and K. Hill. 2013, “Factors that influence the success of public sector projects in Pakistan.” In Proc., IRNOP 2013 Conf., 17–19. Oslo, Norway: BI Norwegian Business School.
Khang, D. B., and T. L. Moe. 2008. “Success criteria and factors for international development projects: A life-cycle-based framework.” Project Manage. J. 39 (1): 72–84. https://doi.org/10.1002/pmj.20034.
Kissi, E., K. Agyekum, B. K. Baiden, R. A. Tannor, G. E. Asamoah, and E. T. Andam. 2019. “Impact of project monitoring and evaluation practices on construction project success criteria in Ghana.” Built Environ. Project Asset Manage. 9 (3): 364–382. https://doi.org/10.1108/BEPAM-11-2018-0135.
Koops, L., M. Bosch-Rekveldt, L. Coman, M. Hertogh, and H. Bakker. 2016. “Identifying perspectives of public project managers on project success: Comparing viewpoints of managers from five countries in North-West Europe.” Int. J. Project Manage. 34 (5): 874–889. https://doi.org/10.1016/j.ijproman.2016.03.007.
Kuwaiti, E. A., M. M. Ajmal, and M. Hussain. 2018. “Determining success factors in Abu Dhabi health care construction projects: Customer and contractor perspectives.” Int. J. Constr. Manage. 18 (5): 430–445. https://doi.org/10.1080/15623599.2017.1333401.
Lam, E. W., A. P. Chan, and D. W. Chan. 2008. “Determinants of successful design-build projects.” J. Constr. Eng. Manage. 134 (5): 333–341. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:5(333).
Lam, E. W. M., A. P. C. Chan, and D. W. M. Chan. 2007. “Benchmarking the performance of design-build projects: Development of project success index.” Benchmarking 14 (5): 624–638. https://doi.org/10.1108/14635770710819290.
Lamprou, A., and D. G. Vagiona. 2022. “Identification and evaluation of success criteria and critical success factors in project success.” Global J. Flexible Syst. Manage. 23 (2): 237–253. https://doi.org/10.1007/s40171-022-00302-3.
Langston, C., and C. Crowley. 2021. “Evaluation of transportation infrastructure: A case study of gold coast light rail stage 1 and 2.” Construct. Econ. Build. 21 (4): 1–20. https://doi.org/10.5130/AJCEB.v21i4.7738.
Lim, C. S., and M. Zain Mohamed. 2000. “An exploratory study into recurring construction problems.” Int. J. Project Manage. 18 (4): 267–273. https://doi.org/10.1016/S0263-7863(99)00016-2.
Lin, T. C. 2016. Compliance, technology, and modern finance. New York: Brooklyn Law School.
Ludvigsen, M. S., E. O. Hall, G. Meyer, L. Fegran, H. Aagaard, and L. Uhrenfeldt. 2016. “Using Sandelowski and Barroso’s meta-synthesis method in advancing qualitative evidence.” Qual. Health Res. 26 (3): 320–329. https://doi.org/10.1177/1049732315576493.
Maghsoodi, A. I., and M. Khalilzadeh. 2018. “Identification and evaluation of construction projects’ critical success factors employing fuzzy-TOPSIS approach.” KSCE J. Civ. Eng. 22 (5): 1593–1605. https://doi.org/10.1007/s12205-017-1970-2.
Mahamadu, A. M., L. Mahdjoubi, C. Booth, P. Manu, and E. Manu. 2019. “Building information modelling (BIM) capability and delivery success on construction projects.” Constr. Innovation 19 (2): 170–192. https://doi.org/10.1108/CI-03-2018-0016.
Mereu, S., J. Sušnik, A. Trabucco, A. Daccache, L. Vamvakeridou-Lyroudia, S. Renoldi, A. Virdis, D. Savić, and D. Assimacopoulos. 2016. “Operational resilience of reservoirs to climate change, agricultural demand, and tourism: A case study from Sardinia.” Sci. Total Environ. 543 (Feb): 1028–1038. https://doi.org/10.1016/j.scitotenv.2015.04.066.
Meshref, A. N., E. Elkasaby, and O. Wageh. 2021. “Identifying innovative reliable criteria governing the selection of infrastructures construction project delivery systems.” Open Eng. 11 (1): 269–280. https://doi.org/10.1515/eng-2021-0028.
Müller, R., and J. R. Turner. 2010. “Attitudes and leadership competences for project success.” Baltic J. Manage. 5 (3): 307–329. https://doi.org/10.1108/17465261011079730.
Mustajoki, J., and M. Marttunen. 2019. “Improving resilience of reservoir operation in the context of watercourse regulation in Finland.” EURO J. Decis. Processes 7 (3–4): 359–386. https://doi.org/10.1007/s40070-019-00099-0.
Nguyen, P. T., P. Van Nguyen, Q. L. H. T. To Nguyen, and V. D. B. Huynh. 2016. “Project success evaluation using TOPSIS algorithm.” J. Eng. Appl. Sci. 11 (8): 1876–1879. https://doi.org/10.3923/jeasci.2016.1876.1879.
Noorzai, E., and M. Golabchi. 2020. “Selecting a proper construction system in small and medium mass housing projects, considering success criteria and construction volume and height.” J. Eng. Des. Technol. 18 (4): 883–903. https://doi.org/10.1108/JEDT-09-2019-0227.
NSW Dams Safety Committee. 2015. Compliance & enforcement policy. Sydney, Australia: New South Wales Government.
Ojiako, U., E. Johansen, and D. Greenwood. 2008. “A qualitative re-construction of project measurement criteria.” Ind. Manage. Data Syst. 108 (3): 405–417. https://doi.org/10.1108/02635570810858796.
Okoli, C., and K. Schabram. 2010. “A guide to conducting a systematic literature review of information systems research.” Sprouts: Working Papers on Information Systems. 10 (26).
Olugboyega, O., D. J. Edwards, A. O. Windapo, E. D. Omopariola, and I. Martek. 2020. “Development of a conceptual model for evaluating the success of BIM-based construction projects.” Smart Sustainable Built Environ. 10 (4): 681–701. https://doi.org/10.1108/SASBE-02-2020-0013.
Petheram, C., and T. McMahon. 2019. “Dams, dam costs and damnable cost overruns.” J. Hydrol. 3 (Apr): 100026. https://doi.org/10.1016/j.hydroa.2019.100026.
Pinter, U., and I. Pšunder. 2013. “Evaluating construction project success with use of the M-TOPSIS method.” J. Civ. Eng. Manage. 19 (1): 16–23. https://doi.org/10.3846/13923730.2012.734849.
Pollack, J., J. Helm, and D. Adler. 2018. “What is the Iron Triangle, and how has it changed?” Int. J. Managing Projects Bus. 11 (2): 527–547. https://doi.org/10.1108/IJMPB-09-2017-0107.
Prasad, S., J. Tata, L. Herlache, and E. McCarthy. 2013. “Developmental project management in emerging countries.” Adv. Pract. Through Theory 6 (1): 53–73. https://doi.org/10.1007/s12063-013-0078-1.
Purvis, B., Y. Mao, and D. Robinson. 2019. “Three pillars of sustainability: In search of conceptual origins.” Sustainability Sci. 14 (3): 681–695. https://doi.org/10.1007/s11625-018-0627-5.
Radujković, M., M. Sjekavica Klepo, and M. Bosch-Rekveldt. 2021. “Breakdown of engineering projects’ success criteria.” J. Constr. Eng. Manage. 147 (11): 04021144. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002168.
Shdid, C. A., E. Andary, A. G. Chowdhury, and I. U. Ahmad. 2019. “Project performance rating model for water and wastewater treatment plant public projects.” J. Manage. Eng. 35 (2): 04018064. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000678.
Silva, G., B. Warnakulasooriya, and B. Arachchige. 2016. “Criteria for construction project success: A literature review.” In Proc., 13th Int. Conf. on Business Management (ICBM). Nugegoda, Sri Lanka: Univ. of Sri Jayewardenepura.
Soderlund, J. 2004. “Building theories of project management: Past research, questions for the future.” Int. J. Project Manage. 22 (3): 183–191.
Stewart, M. 2016. Engineers Australia ACT infrastructure investment update 2016, 28. Canberra, Australia: Institution of Engineers Australia.
Tabish, S. Z. S., and K. N. Jha. 2018. “Beyond the Iron Triangle in public construction projects.” J. Constr. Eng. Manage. 144 (8): 04018067. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001517.
Tang, Z., M. Skitmore, and S. T. Thomas. 2020. “Factors and criteria influencing the success of sustainable buildings in Hong Kong.” Proc. Inst. Civ. Eng. Eng. Sustainability 173 (1): 20–29. https://doi.org/10.1680/jensu.18.00032.
Templier, M., and G. Paré. 2015. “A framework for guiding and evaluating literature reviews.” Commun. Assoc. Inf. Syst. 37 (1): 6.
The Canberra Times. 2015. “$50 million cost blowout of Cotter Dam expansion.” Accessed September 9, 2017. https://www.canberratimes.com.au/act-news/50-million-cost-blowout-of-cotter-dam-expansion-20150624-ghwbt5.html.
Turner, J. R. 2009. The handbook of project-based management leading strategic change in organizations. 3rd ed. New York: McGraw-Hill.
Viswanathan, S. K., K. K. Tripathi, and K. N. Jha. 2020. “Influence of risk mitigation measures on international construction project success criteria—A survey of Indian experiences.” Construct. Manage. Econ. 38 (3): 207–222. https://doi.org/10.1080/01446193.2019.1577987.
Volden, G. H. 2018. “Public project success as seen in a broad perspective: Lessons from a meta-evaluation of 20 infrastructure projects in Norway.” Eval. Program Plann. 69 (Aug): 109–117. https://doi.org/10.1016/j.evalprogplan.2018.04.008.
Wai, S. H., A. M. Yusof, and S. Ismail. 2012. “Exploring success criteria from the developers’ perspective in Malaysia.” Int. J. Eng. Bus. Manage. 4 (Nov): 33. https://doi.org/10.5772/51096.
Walker, A. 2015. Project management in construction. Somerset, UK: Wiley.
Wanden-Berghe, C., and J. Sanz-Valero. 2012. “Systematic reviews in nutrition: Standardized methodology.” Supplement, Br. J. Nutr. 107 (S2): S3–S7. https://doi.org/10.1017/S0007114512001432.
Wang, T., J. Xu, Q. He, A. P. C. Chan, and E. K. Owusu. 2022. “Studies on the success criteria and critical success factors for mega infrastructure construction projects: A literature review.” Eng. Constr. Archit. Manage. https://doi.org/10.1108/ECAM-12-2020-1042.
World Commission on Dams. 2000. Dams and development: A new framework for decision-making: The report of the world commission on dams. Cape Town, South Africa: World Commission on Dams, Earthscan.
Wuni, I. Y., G. Q. Shen, and R. Osei-Kyei. 2021. “Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects.” J. Financ. Manage. Property Constr. 26 (2): 279–297. https://doi.org/10.1108/JFMPC-03-2020-0013.
Xiao, Y., and M. Watson. 2017. “Guidance on conducting a systematic literature review.” J. Plann. Educ. Res. 39 (1): 93–112. https://doi.org/10.1177/0739456X17723971.
Youneszadeh, H., A. Ardeshir, and M. H. Sebt. 2020. “Predicting project success in residential building projects (RBPs) using artificial neural networks (ANNs).” Civ. Eng. J. 6 (11): 2203–2219. https://doi.org/10.28991/cej-2020-03091612.
Zavadskas, E. K., T. Vilutienė, Z. Turskis, and J. Šaparauskas. 2014. “Multi-criteria analysis of Projects’ performance in construction.” Arch. Civ. Mech. Eng. 14 (1): 114–121. https://doi.org/10.1016/j.acme.2013.07.006.
Zwikael, O. 2009. “The uniqueness of management in New Zealand—The project management case.” Probl. Perspect. Manage. 7 (1): 15–20.
Zwikael, O., and M. Ahn. 2011. “The effectiveness of risk management: An analysis of project risk planning across industries and countries.” Risk Anal. 31 (1): 25–37. https://doi.org/10.1111/j.1539-6924.2010.01470.x.
Zwikael, O., K. Shimizu, and S. Globerson. 2005. “Cultural differences in project management capabilities: A field study.” Int. J. Project Manage. 23 (6): 454–462. https://doi.org/10.1016/j.ijproman.2005.04.003.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 149Issue 1January 2023

History

Published online: Nov 11, 2022
Published in print: Jan 1, 2023
Discussion open until: Apr 11, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Doctoral Researcher, School of Engineering, Design and Built Environment, Kingswood Campus, Western Sydney Univ., Second Ave., Kingswood, NSW 2747, Australia (corresponding author). ORCID: https://orcid.org/0000-0002-2530-4831. Email: [email protected]
Associate Professor, School of Engineering, Design and Built Environment, Kingswood Campus, Western Sydney Univ., Second Ave., Kingswood, NSW 2747, Australia. ORCID: https://orcid.org/0000-0003-0877-9533. Email: [email protected]
Associate Professor, School of Engineering, Design and Built Environment, Parramatta South Campus, Western Sydney Univ., Victoria Rd., Rydalmere, NSW 2116, Australia. ORCID: https://orcid.org/0000-0002-9252-7306. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share