Abstract

Contractual governance is considered sufficient to govern particular types of exchanges. In the presence of well-known transaction hazards, however, relational governance is increasingly viewed as a necessary complement to limit transaction hazard risks in many circumstances such as public-private partnership (PPP) arrangements. Consequently, PPPs should employ different governance mechanisms such as trilateral governance and shadow of the future to achieve this complementarity. Relational contracting, which aims to govern transactions through mutual relationships within a project’s overall contractual framework, offers a specific avenue for this purpose. In particular, relational practices such as partnering and regular meetings between the client and concessionaire can be included in a project contract to improve relational governance. Different researchers have previously performed in-depth reviews and syntheses of governance mechanisms, but a similar synthesis related to relational practices is missing from the literature. Also, in theory, relational practices specified in contracts can act as enablers of governance mechanisms in PPP projects, so this linkage needs further investigation. Consequently, a review of the literature was completed to synthesize relational practices for inclusion in PPP contracts, and these practices were also linked with well-established governance mechanisms. Six categories of contractual relational practices were identified: communicating/negotiating, partnering, resolving conflicts, monitoring, executing changes, and allocating risks which were further linked with governance mechanisms. For instance, the trilateral governance mechanism was linked to dispute review board, mediation, and arbitration practices. This research provides insights into effective contractual designs by identifying relational practices that can trigger governance mechanisms and promote contractual and relational governance complementarity in PPP projects.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

No data, models, or code were generated or used during the study.

References

Abednego, M. P., and S. O. Ogunlana. 2006. “Good project governance for proper risk allocation in public–private partnerships in Indonesia.” Int. J. Project Manage. 24 (7): 622–634. https://doi.org/10.1016/j.ijproman.2006.07.010.
Acharya, N., Y. Dai Lee, and H. Man Im. 2006. “Conflicting factors in construction projects: Korean perspective.” Eng. Constr. Archit. Manage. 13 (6): 543–566. https://doi.org/10.1108/09699980610712364.
Adler, P. S. 2001. “Market, hierarchy, and trust: The knowledge economy and the future of capitalism.” Organ. Sci. 12 (2): 215–234. https://doi.org/10.1287/orsc.12.2.215.10117.
Antillon, E., M. Garvin, K. Molenaar, and A. Javernick-Will. 2018. “Influence of interorganizational coordination on lifecycle design decision making: Comparative case study of public–private partnership highway projects.” J. Manage. Eng. 34 (5): 05018007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000623.
Anvuur, A., and M. Kumaraswamy. 2007. “Conceptual model of partnering and alliancing.” J. Constr. Eng. Manage. 133 (3): 225–234. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:3(225).
Arranz, N., and J. de Arroyabe. 2011. “Effect of formal contracts, relational norms and trust on performance of joint research and development projects.” Br. J. Manage. 23 (4): 575–588. https://doi.org/10.1111/j.1467-8551.2011.00791.x.
Baker, G. P., R. Gibbons, and K. J. Murphy. 2008. “Strategic alliances: Bridges between Islands of conscious power.” J. Jpn. Int. Econ. 22 (2): 146–163. https://doi.org/10.1016/j.jjie.2008.03.001.
Barlow, J. 1996. “Partnering, lean production and the high performance workplace.” In Proc., 4th Annual Conf. of the Int. Group for Lean Construction, 24–37. Birmingham, UK: International Group for Lean Construction.
Bayliss, R., S. O. Cheung, H. C. Suen, and S. P. Wong. 2004. “Effective partnering tools in construction: A case study on MTRC TKE contract 604 in Hong Kong.” Int. J. Project Manage. 22 (3): 253–263. https://doi.org/10.1016/S0263-7863(03)00069-3.
Benítez-Ávila, C., A. Hartmann, and G. Dewulf. 2019. “Contractual and relational governance as positioned-practices in ongoing public–private partnership projects.” Project Manage. J. 50 (6): 716–733. https://doi.org/10.1177/8756972819848224.
Benítez-Ávila, C., A. Hartmann, G. Dewulf, and J. Henseler. 2018. “Interplay of relational and contractual governance in public-private partnerships: The mediating role of relational norms, trust and partners’ contribution.” Int. J. Project Manage. 36 (3): 429–443. https://doi.org/10.1016/j.ijproman.2017.12.005.
Bresnen, M., and N. Marshall. 2000. “Partnering in construction: A critical review of issues, problems and dilemmas.” Construct. Manage. Econ. 18 (2): 229–237. https://doi.org/10.1080/014461900370852.
Bygballe, L., M. Jahre, and A. Swärd. 2010. “Partnering relationships in construction: A literature review.” J. Purchasing Supply Manage. 16 (4): 239–253. https://doi.org/10.1016/j.pursup.2010.08.002.
Chan, A., J. Yeung, C. Yu, S. Wang, and Y. Ke. 2011. “Empirical study of risk assessment and allocation of public-private partnership projects in China.” J. Manage. Eng. 27 (3): 136–148. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000049.
Chan, A. P. C., Y. Hu, L. Ma, M. Shan, and Y. Le. 2016. “Improving the outcomes of public drainage projects through NEC3-based relational contracting: Hong Kong case study.” J. Civ. Eng. Educ. 142 (2): 06015003. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000262.
Chan, C. H. F. 2010. “To talk or to fight?: Collective effects of strategic, cultural, and institutional factors on investors’ renegotiation approach in public-private concessions.” Ph.D. thesis, Dept. of Civil & Environmental Engineering, Stanford Univ.
Chan, E., and H. Suen. 2005. “Dispute resolution management for international construction projects in China.” Manage. Decis. 43 (4): 589–602. https://doi.org/10.1108/00251740510593576.
Chapman, P. H. 2009. “Dispute boards on major infrastructure projects.” Proc. Inst. Civ. Eng. Manage. Procure. Law 162 (1): 7–16. https://doi.org/10.1680/mpal.2009.162.1.7.
Chen, Y., Y. Chen, Z. Liu, and H. Yao. 2018. “Influence of prior ties on trust in contract enforcement in the construction industry: Moderating role of the shadow of the future.” J. Manage. Eng. 34 (2): 04017064. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000584.
Cheung, S. O. 2008. “Bounded rationality, opportunism and trust in co-operative contracting.” In Vol. 2 of Proc., 4th Int. Structural Engineering and Construction Conf., ISEC4—Innovations in Structural Engineering and Construction, 1537–1542. Hong Kong: City Univ.
Cheung, S. O., T. Ng, S.-P. Wong, and H. Suen. 2003. “Behavioral aspects in construction partnering.” Int. J. Project Manage. 21 (5): 333–343. https://doi.org/10.1016/S0263-7863(00)00052-2.
Cheung, S. O., K. Yiu, and P. Chim. 2006. “How relational are construction contracts?” J. Civ. Eng. Educ. 132 (1): 48–56. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:1(48).
Cheung, S. O., L. Zhu, and K. W. Lee. 2018. “Incentivization and interdependency in construction contracting.” J. Manage. Eng. 34 (3): 04018010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000601.
Colledge, B. 2005. “Relational contracting: Creating value beyond the project.” Lean Constr. J. 2 (1): 30–45.
Dal Bó, P., A. Foster, and L. Putterman. 2010. “Institutions and behavior: Experimental evidence on the effects of democracy.” Am. Econ. Rev. 100 (5): 2205–2229. https://doi.org/10.1257/aer.100.5.2205.
Delhi, V. S. K., A. Mahalingam, and S. Palukuri. 2012. “Governance issues in BOT based PPP infrastructure projects in India.” Built Environ. Project Asset Manage. 2 (2): 234–249. https://doi.org/10.1108/20441241211280864.
Demirel, H., L. Volker, W. Leendertse, and M. Hertogh. 2019. “Dealing with contract variations in PPPs: Social mechanisms and contract management in infrastructure projects.” J. Constr. Eng. Manage. 145 (11): 04019073. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001714.
Demirel, H. Ç., W. Leendertse, L. Volker, and M. Hertogh. 2017. “Flexibility in PPP contracts–Dealing with potential change in the pre-contract phase of a construction project.” Construct. Manage. Econ. 35 (4): 196–206. https://doi.org/10.1080/01446193.2016.1241414.
Dewulf, G., and A. Kadefors. 2012. “Collaboration in public construction—Contractual incentives, partnering schemes and trust.” Eng. Project Organ. J. 2 (4): 240–250. https://doi.org/10.1080/21573727.2012.684876.
Doloi, H. 2009. “Relational partnerships: The importance of communication, trust and confidence and joint risk management in achieving project success.” Construct. Manage. Econ. 27 (11): 1099–1109. https://doi.org/10.1080/01446190903286564.
Dutton, J. E., J. M. Dukerich, and C. V. Harquail. 1994. “Organizational images and member identification.” Admin. Sci. Q. 39 (2): 239–263. https://doi.org/10.2307/2393235.
Dyer, J. H., and H. Singh. 1998. “The relational view: Cooperative strategy and sources of interorganizational competitive advantage.” Acad. Manage. Rev. 23 (4): 660–679. https://doi.org/10.5465/amr.1998.1255632.
Edkins, A., and H. Smyth. 2006. “Contractual management in PPP projects: Evaluation of legal versus relational contracting for service delivery.” J. Civ. Eng. Educ. 132 (1): 82–93. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:1(82).
El-adaway, I., I. Abotaleb, and S. Eteifa. 2017. “Framework for multiparty relational contracting.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 9 (3): 04517018. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000238.
Falagas, M., E. Pitsouni, G. Malietzis, and G. Pappas. 2008. “Comparison of PubMed, Scopus, Web of Science, and Google Scholar: Strengths and weaknesses.” FASEB J. 22 (2): 338–342. https://doi.org/10.1096/fj.07-9492LSF.
Garvin, M. J. 2009. “Governance of PPP projects through contract provisions.” In Proc., 4th Specialty Conf. of Leadership and Management of Construction, edited by P. S., Chinowsky and R. E. Levitt. South Lake Tahoe, CA: CD-ROM.
Granovetter, M. 1985. “Economic action and social structure: The problem of embeddedness.” Am. J. Sociol. 91 (3): 481–510. https://doi.org/10.1086/228311.
Gransberg, D. D., and E. Scheepbouwer. 2015. “US partnering programs and international partnering contracts and alliances: Comparative analysis.” Transp. Res. Rec. 2504 (1): 73–77. https://doi.org/10.3141/2504-09.
Grimsey, D., and M. K. Lewis. 2002. “Evaluating the risks of public private partnerships for infrastructure projects.” Int. J. Project Manage. 20 (2): 107–118. https://doi.org/10.1016/S0263-7863(00)00040-5.
Guevara, J., M. Garvin, and N. Ghaffarzadegan. 2020. “The forest and the trees: A systems map of governance interdependencies in the shaping phase of road public–private partnerships.” J. Manage. Eng. 36 (1): 04019031. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000726.
Guz, A. N., and J. J. Rushchitsky. 2009. “Scopus: A system for the evaluation of scientific journals.” Int. Appl. Mech. 45 (4): 351–362. https://doi.org/10.1007/s10778-009-0189-4.
Harper, C. M., and K. R. Molenaar. 2014. “Association between construction contracts and relational contract theory.” In Proc., Construction Research Congress 2014: Construction in a Global Network, 1329–1338. Reston, VA: ASCE. https://doi.org/10.1061/9780784413517.136.
Hart, O. 2003. “Incomplete contracts and public ownership: Remarks, and an application to public-private partnerships.” Econ. J. 113 (486): C69–C76. https://doi.org/10.1111/1468-0297.00119.
Hart, O. D. 1988. “Incomplete contracts and the theory of the firm.” J. Law Econ. Organ. 4 (1): 119–139.
Henisz, W. J., R. E. Levitt, and W. R. Scott. 2012. “Toward a unified theory of project governance: Economic, sociological and psychological supports for relational contracting.” Eng. Project Organ. J. 2 (1–2): 37–55. https://doi.org/10.1080/21573727.2011.637552.
Hölmstrom, B. 1979. “Moral hazard and observability.” Bell J. Econ. 10 (1): 74–91. https://doi.org/10.2307/3003320.
Hosseini, A., P. A. Wondimu, A. Bellini, N. Haugseth, B. Andersen, and O. Lædre. 2016. “Project partnering in Norwegian construction industry.” Energy Procedia 96 (Jun): 241–252. https://doi.org/10.1016/j.egypro.2016.09.132.
Ismail, S., A. Yusof, and W. Han. 2012. “Elements of relational contract in the delivery of public infrastructure in Malaysia.” IBIMA Bus. Rev. 2012: 1–11. https://doi.org/10.5171/2012.991384.
Jacobson, C., and S. Choi. 2008. “Success factors: Public works and public-private partnerships.” Int. J. Public Sect. Manage. 21 (6): 637–657. https://doi.org/10.1108/09513550810896514.
Jobidon, G., P. Lemieux, and R. Beauregard. 2019. “Comparison of Quebec’s project delivery methods: Relational contract law and differences in contractual language.” Laws 8 (2): 9. https://doi.org/10.3390/laws8020009.
Kadefors, A. 2004. “Trust in project relationships—Inside the black box.” Int. J. Project Manage. 22 (3): 175–182. https://doi.org/10.1016/S0263-7863(03)00031-0.
Ke, Y., F. Y. Ling, and P. X. Zou. 2015. “Effects of contract strategy on interpersonal relations and project outcomes of public-sector construction contracts in Australia.” J. Manage. Eng. 31 (4): 04014062. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000273.
Kerf, M., R. Gray, T. Irwin, C. Levesque, R. Taylor, and M. Klein. 1998. Concessions for infrastructure: A guide to their design and award. Washington, DC: The World Bank.
Khalfan, M. M., P. McDermott, and W. Swan. 2007. “Building trust in construction projects.” Supply Chain Manage. 12 (6): 385–391. https://doi.org/10.1108/13598540710826308.
Khurana, M., and M. Garvin. 2019. “Relationship management in public private partnership projects: Literature synthesis and path forward.” In Proc., Engineering Project Organization Conf. Vail, CO: Engineering Project Organization Society.
Kumaraswamy, M., F. Ling, A. Anvuur, and M. Motiar Rahman. 2007. “Targeting relationally integrated teams for sustainable PPPS.” Eng. Constr. Archit. Manage. 14 (6): 581–596. https://doi.org/10.1108/09699980710829030.
Kumaraswamy, M. M. 1997. “Conflicts, claims and disputes in construction.” Eng. Constr. Archit. Manage. 4 (2): 95–111. https://doi.org/10.1108/eb021042.
Larson, E. 1995. “Project partnering: Results of study of 280 construction projects.” J. Manage. Eng. 11 (2): 30–35. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(30).
Lau, E., and S. Rowlinson. 2009. “Interpersonal trust and inter-firm trust in construction projects.” Construct. Manage. Econ. 27 (6): 539–554. https://doi.org/10.1080/01446190903003886.
Laursen, M., and P. Svejvig. 2016. “Taking stock of project value creation: A structured literature review with future directions for research and practice.” Int. J. Project Manage. 34 (4): 736–747. https://doi.org/10.1016/j.ijproman.2015.06.007.
Lima, B., and C. O. Cruz. 2019. “The challenge of monitoring PPP projects: Proposal of a conceptual 5-dimension KPI’s model.” J. Mod. Project Manage. 7 (2): 108–117. https://doi.org/10.19255/JMPM02006.
Ling, F., S. Ong, Y. Ke, S. Wang, and P. Zou. 2014a. “Drivers and barriers to adopting relational contracting practices in public projects: Comparative study of Beijing and Sydney.” Int. J. Project Manage. 32 (2): 275–285. https://doi.org/10.1016/j.ijproman.2013.04.008.
Ling, F., M. Rahman, and T. Ng. 2006. “Incorporating contractual incentives to facilitate relational contracting.” J. Civ. Eng. Educ. 132 (1): 57–66. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:1(57).
Ling, F. Y., Y. Ke, M. M. Kumaraswamy, and S. Wang. 2014b. “Key relational contracting practices affecting performance of public construction projects in China.” J. Constr. Eng. Manage. 140 (1): 04013034. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000781.
Lord, W., A. Liu, M. M. Tuuli, and S. Zhang. 2011. “A modern contract: Developments in the UK and China.” Proc. Inst. Civ. Eng. Manage. Procure. Law 163 (4): 151–159. https://doi.org/10.1680/mpal.2010.163.4.151.
Lu, P., S. Guo, L. Qian, P. He, and X. Xu. 2015. “The effectiveness of contractual and relational governances in construction projects in China.” Int. J. Project Manage. 33 (1): 212–222. https://doi.org/10.1016/j.ijproman.2014.03.004.
Macaulay, S. 1963. “Non-contractual relations in business: A preliminary study.” Am. Sociological Rev. 28 (1): 55. https://doi.org/10.2307/2090458.
Macneil, I. 1980. The new social contract: An inquiry into modern contractual relations. New Haven, CT: Yale University Press.
Macneil, I. R. 1978. “Contracts: Adjustment of long-term economic relations under classical, neoclassical, and relational contract law.” Northwestern Univ. Law Rev. 72 (6): 854–905.
Manu, E., N. Ankrah, E. Chinyio, and D. Proverbs. 2015. “Trust influencing factors in main contractor and subcontractor relationships during projects.” Int. J. Project Manage. 33 (7): 1495–1508. https://doi.org/10.1016/j.ijproman.2015.06.006.
Marques, R. 2018. “Is arbitration the right way to settle conflicts in PPP arrangements?” J. Manage. Eng. 34 (1): 05017007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000564.
Memon, S. A., S. Rowlinson, R. Y. Sunindijo, and H. Zahoor. 2021. “Collaborative behavior in relational contracting projects in Hong Kong—A contractor’s perspective.” Sustainability 13 (10): 5375. https://doi.org/10.3390/su13105375.
Meng, X. 2015. “The role of trust in relationship development and performance improvement.” J. Civ. Eng. Manage. 21 (7): 845–853. https://doi.org/10.3846/13923730.2014.893923.
Mitkus, S., and T. Mitkus. 2014. “Causes of conflicts in a construction industry: A communicational approach.” Procedia Social Behav. Sci. 110 (15): 777–786. https://doi.org/10.1016/j.sbspro.2013.12.922.
Nguyen, D., and M. Garvin. 2019. “Life-cycle contract management strategies in US highway public–private partnerships: Public control or concessionaire empowerment?” J. Manage. Eng. 35 (4): 04019011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000687.
Nguyen, D., M. Garvin, and E. Gonzalez. 2018. “Risk allocation in US public-private partnership highway project contracts.” J. Constr. Eng. Manage. 144 (5): 04018017. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001465.
Nystén-Haarala, S., N. Lee, and J. Lehto. 2010. “Flexibility in contract terms and contracting processes.” Int. J. Managing Projects Bus. 3 (3): 462–478. https://doi.org/10.1108/17538371011056084.
Osei-Kyei, R., and A. P. Chan. 2015. “Developing transport infrastructure in Sub-Saharan Africa through public–private partnerships: Policy practice and implications.” Transp. Rev. 36 (2): 170–186. https://doi.org/10.1080/01441647.2015.1077288.
Osei-Kyei, R., A. P. Chan, Y. Yu, C. Chen, and A. Dansoh. 2019. “Root causes of conflict and conflict resolution mechanisms in public-private partnerships: Comparative study between Ghana and China.” Cities 87 (Apr): 185–195. https://doi.org/10.1016/j.cities.2018.10.001.
Parker, D., and K. Hartley. 2003. “Transaction costs, relational contracting and public private partnerships: A case study of UK defence.” J. Purchasing Supply Manage. 9 (3): 97–108. https://doi.org/10.1016/S0969-7012(02)00035-7.
Pasquire, C., G. Ballard, J. W. Darrington, and G. A. Howell. 2011. “Motivation and incentives in relational contracts.” J. Financ. Manage. Prop. Constr. 16 (1): 42–51. https://doi.org/10.1108/jfmpc.2011.37616aaa.002.
Paulin, M., J. Perrien, and R. Ferguson. 1997. “Relational contract norms and the effectiveness of commercial banking relationships.” Int. J. Service Ind. Manage. 8 (5): 435–452. https://doi.org/10.1108/09564239710189844.
Pinto, M. B., J. K. Pinto, and J. E. Prescott. 1993. “Antecedents and consequences of project team cross-functional cooperation.” Manage. Sci. 39 (10): 1281–1297. https://doi.org/10.1287/mnsc.39.10.1281.
Poppo, L., and T. Zenger. 2002. “Do formal contracts and relational governance function as substitutes or complements?” Strategic Manage. J. 23 (8): 707–725. https://doi.org/10.1002/smj.249.
Reeves, E. 2008. “The practice of contracting in public private partnerships: Transaction costs and relational contracting in the Irish schools sector.” Public Admin. 86 (4): 969–986. https://doi.org/10.1111/j.1467-9299.2008.00743.x.
Roehrich, J. 2009. “The dynamics of inter-organisational governance: Contractual and relational mechanisms in public-private supply arrangements.” Ph.D. thesis, School of Management, Univ. of Bath.
Rowe, F. 2014. “What literature review is not: Diversity, boundaries and recommendations.” Eur. J. Inf. Syst. 23 (3): 241–255. https://doi.org/10.1057/ejis.2014.7.
Said, M., N. Mustaffa, and H. Ariffin. 2019. “Application of relational contract in engineering, procurement and construction projects: Effects to cost overrun and time schedule in Malaysian oil and gas industry.” In Proc., 1st Int. Graduate Conf. of Built Environment and Surveying, GBES 2019. Johor, Malaysia: Universiti Teknologi Malaysia.
Sappington, D. E. 1991. “Incentives in principal-agent relationships.” J. Econ. Perspect. 5 (2): 45–66. https://doi.org/10.1257/jep.5.2.45.
Scott, R. W. 2008. Institutions and organizations: Ideas and interests. 3rd ed. Thousand Oaks, CA: SAGE.
Smith, E. M., and A. Thomasson. 2018. “The use of the partnering concept for public–private collaboration: How well does it really work?” Public Organ. Rev. 18 (2): 191–206. https://doi.org/10.1007/s11115-016-0368-9.
Smyth, H., and A. Edkins. 2007. “Relationship management in the management of PFI/PPP projects in the UK.” Int. J. Project Manage. 25 (3): 232–240. https://doi.org/10.1016/j.ijproman.2006.08.003.
Solheim-Kile, E., and A. Wald. 2019. “Extending the transactional view on public–private partnership projects: Role of relational and motivational aspects in goal alignment.” J. Constr. Eng. Manage. 145 (5): 04019030. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001643.
Speidel, R. E. 1999. “The characteristics and challenges of relational contracts.” Northwestern Univ. Law Rev. 94 (3): 823–846.
Stam, R. 2016. “Relationship contracting arrangements—A study of relationship contracting arrangements and their ability to foster best-for-project behavior in infrastructure projects in the Netherlands.” Master’s thesis, Civil Engineering and Geo sciences, Delft Univ. of Technology.
Suprapto, M., H. Bakker, H. Mooi, and M. Hertogh. 2016. “How do contract types and incentives matter to project performance?” Int. J. Project Manage. 34 (6): 1071–1087. https://doi.org/10.1016/j.ijproman.2015.08.003.
Thompson, P. J., and S. R. Sanders. 1998. “Partnering continuum.” J. Manage. Eng. 14 (5): 73–78. https://doi.org/10.1061/(ASCE)0742-597X(1998)14:5(73).
UNDP (United Nations Development Programme). 2017. “Implementation—Managing conflict: What are conflicts.” Accessed November 9, 2019. https://pppue.undp.2margraf.com/en/20_3.htm.
Van Den Hurk, M., and K. Verhoest. 2016. “The challenge of using standard contracts in public–private partnerships.” Public Manage. Rev. 18 (2): 278–299. https://doi.org/10.1080/14719037.2014.984623.
van der Veen, M., and W. Korthals Altes. 2011. “Urban development agreements: Do they meet guiding principles for a better deal?” Cities 28 (4): 310–319. https://doi.org/10.1016/j.cities.2011.03.001.
Verweij, S., I. van Meerkerk, and I. A. Korthagen. 2015. “Reasons for contract changes in implementing Dutch transportation infrastructure projects: An empirical exploration.” Transp. Policy 37 (1): 195–202. https://doi.org/10.1016/j.tranpol.2014.11.004.
Warsen, R., E. H. Klijn, and J. Koppenjan. 2019. “Mix and match: How contractual and relational conditions are combined in successful public–private partnerships.” J. Public Admin. Res. Theory 29 (3): 375–393. https://doi.org/10.1093/jopart/muy082.
West, K. 2005. “From bilateral to trilateral governance in local government contracting in France.” Public Admin. 83 (2): 473–492. https://doi.org/10.1111/j.0033-3298.2005.00458.x.
Weston, D. C., and G. E. Gibson Jr. 1993. “Partnering-project performance in US Army Corps of Engineers.” J. Manage. Eng. 9 (4): 410–425. https://doi.org/10.1061/(ASCE)9742-597X(1993)9:4(410).
Williamson, O. 1979. “Transaction-cost economics: The governance of contractual relations.” J. Law Econ. 22 (2): 233–261. https://doi.org/10.1086/466942.
Williamson, O. E. 1996. The mechanisms of governance. New York: Oxford University Press.
Winch, G. M. 2001. “Governing the project process: A conceptual framework.” Construct. Manage. Econ. 19 (8): 799–808. https://doi.org/10.1080/01446190110074264.
Wood, G. D., and R. C. Ellis. 2005. “Main contractor experiences of partnering relationships on UK construction projects.” Construct. Manage. Econ. 23 (3): 317–325. https://doi.org/10.1080/0144619042000287714.
Xiong, W., B. Chen, H. Wang, and D. Zhu. 2019. “Transaction hazards and governance mechanisms in public-private partnerships: A comparative study of two cases.” Public Perform. Manage. Rev. 42 (6): 1279–1304. https://doi.org/10.1080/15309576.2019.1574592.
Yates, J. K., and J. Duran. 2006. “Utilizing dispute review boards in relational contracting: A case study.” J. Civ. Eng. Educ. 132 (4): 334–341. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:4(334).
Yates, J. K., and A. Epstein. 2006. “Avoiding and minimizing construction delay claim disputes in relational contracting.” J. Civ. Eng. Educ. 132 (2): 168–179. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:2(168).
Yeung, J. F., A. P. Chan, and D. W. Chan. 2012. “Defining relational contracting from the Wittgenstein family-resemblance philosophy.” Int. J. Project Manage. 30 (2): 225–239. https://doi.org/10.1016/j.ijproman.2011.06.002.
Young, B., A. Hosseini, and O. Lædre. 2016. “The characteristics of Australian infrastructure alliance projects.” Energy Procedia 96 (Sep): 833–844. https://doi.org/10.1016/j.egypro.2016.09.145.
Zheng, J., J. Roehrich, and M. Lewis. 2008. “The dynamics of contractual and relational governance: Evidence from long-term public–private procurement arrangements.” J. Purchasing Supply Manage. 14 (1): 43–54. https://doi.org/10.1016/j.pursup.2008.01.004.
Zheng, X., J. Yuan, J. Guo, M. Skibniewski, and S. Zhao. 2018. “Influence of relational norms on user interests in PPP Projects: Mediating effect of project performance.” Sustainability 10 (6): 2027. https://doi.org/10.3390/su10062027.
Zou, W., M. Kumaraswamy, J. Chung, and J. Wong. 2014. “Identifying the critical success factors for relationship management in PPP projects.” Int. J. Project Manage. 32 (2): 265–274. https://doi.org/10.1016/j.ijproman.2013.05.004.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 148Issue 12December 2022

History

Received: Apr 5, 2022
Accepted: Jul 18, 2022
Published online: Sep 26, 2022
Published in print: Dec 1, 2022
Discussion open until: Feb 26, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Contracts Development Manager, Transurban (USA) Inc., 6440, General Green Way, Alexandria, VA 22302 (corresponding author). ORCID: https://orcid.org/0000-0002-6926-3779. Email: [email protected]
Michael J. Garvin, M.ASCE [email protected]
Professor, Dept. of Civil and Environmental Engineering, Virginia Tech, Blacksburg, VA 24061. Email: [email protected]
Ashwin Mahalingam, M.ASCE [email protected]
Professor, Dept. of Civil Engineering, Indian Institute of Technology, Madras, Chennai, Tamil Nadu 600036, India. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share