Technical Papers
Sep 9, 2022

A System-Dynamic Model for Evaluating the Effect of Person–Team Fit on Project Performance

Publication: Journal of Construction Engineering and Management
Volume 148, Issue 11

Abstract

The dynamic nature of construction projects has made teams the best approach for responding to changing project needs. As a result, the performance of the project engineering team, which has the responsibility to manage and supervise the construction process at the site, has an undeniable effect on achieving project goals. Recent studies showed that the level of fit individuals perceive between themselves and their team highly affects their performance. However, it has remained underresearched, especially in developing team selection models, due to the complexity of quantifying influential qualitative factors. A system-dynamics approach is employed in this paper to gain a better insight into the effects of person–team fit (PTF) on project performance (PP) due to the complexity of the parameters engaged in this process. The results indicate that team members’ low levels of fit significantly increase schedule delays and errors, leading to severe cost overruns and failure in project cost performance. The model also demonstrates how policies like overtime work or rewards are helpful to compensate for delays and improve project performance. This study adds to the body of knowledge by offering new insights and contributes toward a greater understanding of failure in team selection and its impact on PP. Also, using the system-dynamics approach to simulate this process, which is previously missing in the literature, supports the project manager’s decisions by considering multiple qualitative and quantitative factors affecting the project performance. The model suggests that adjusting PTF would be an alternative fundamental policy to prevent severe deviations from the baselines. It helps a project manager (PM) understand how each aspect of PTF would affect PP. Also, it highlights the importance of supplementary fit (SF) and discourages managers from traditional competency-based team selection.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Adu, E. T., and A. Opawole. 2019. “Assessment of performance of teamwork in construction projects delivery in South-Southern Nigeria.” J. Eng. Des. Technol 18 (1): 230–250. https://doi.org/10.1108/JEDT-01-2019-0025.
Ahmed, S. M., and R. Kangari. 1995. “Analysis of client-satisfaction factors in construction industry.” J. Manage. Eng. 11 (2): 36–44. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(36).
Aljohani, A., D. Ahiaga-Dagbui, and D. Moore. 2017. “Construction projects cost overrun: What does the literature tell us?” Int. J. Innovation Manage. Technol. 8 (2): 137. https://doi.org/10.18178/ijimt.2017.8.2.717.
Ansari, R. 2019. “Dynamic simulation model for project change-management policies: Engineering project case.” J. Constr. Eng. Manage. 145 (7): 05019008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001664.
Bedell, R. J. 1983. “Terminating R&D projects prematurely.” Res. Manage. 26 (4): 32–35. https://doi.org/10.1080/00345334.1983.11756785.
Cable, D. M., and J. R. Edwards. 2004. “Complementary and supplementary fit: A theoretical and empirical integration.” J. Appl. Psychol. 89 (5): 822. https://doi.org/10.1037/0021-9010.89.5.822.
De Cooman, R., T. Vantilborgh, M. Bal, and X. Lub. 2016. “Creating inclusive teams through perceptions of supplementary and complementary person–team fit: Examining the relationship between person–team fit and team effectiveness.” Group Organ. Manage. 41 (3): 310–342. https://doi.org/10.1177/1059601115586910.
Dyer, W. G., Jr., J. H. Dyer, and W. G. Dyer. 2013. Team building: Proven strategies for improving team performance. Hoboken, NJ: Wiley.
Ecem Yildiz, A., I. Dikmen, and M. Talat Birgonul. 2020. “Using system dynamics for strategic performance management in construction.” J. Manage. Eng. 36 (2): 04019051. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000744.
Fayek, A. R., M. Dissanayake, and O. Campero. 2003. “Measuring and classifying construction field rework: A pilot study.” Research Rep., Edmonton, AB, Canada: Dept. of Civil and Environmental Engineering, Univ. of Alberta.
Fleming, Q. W., and J. M. Koppelman. 2002. Earned value project management. 2nd ed. Newton Square, PA: Project Management Institute.
Forcada, N., M. Gangolells, M. Casals, and M. Macarulla. 2017. “Factors affecting rework costs in construction.” J. Constr. Eng. Manage. 143 (8): 04017032. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001324.
Forrester, J. W. 1961. Industrial dynamics. Cambridge MA: MIT Press.
Forrester, J. W. 1997. “Industrial dynamics.” J. Oper. Res. Soc. 48 (10): 1037–1041. https://doi.org/10.1057/palgrave.jors.2600946.
Gerami Seresht, N., and A. R. Fayek. 2018. “Dynamic modeling of multifactor construction productivity for equipment-intensive activities.” J. Constr. Eng. Manage. 144 (9): 04018091. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001549.
Glaser, B. G. 1999. “The future of grounded theory.” Qual. Health Res. 9 (6): 836–845. https://doi.org/10.1177/104973299129122199.
Glaser, B. G., A. L. Strauss, and E. Strutzel. 1968. “The discovery of grounded theory; strategies for qualitative research.” Nursing Res. 17 (4): 364. https://doi.org/10.1097/00006199-196807000-00014.
Glew, D. J. 2012. “Effects of interdependence and social interaction-based person-team fit.” Admin. Sci. 2 (1): 26–46. https://doi.org/10.3390/admsci2010026.
Greenberger, M., M. A. Crenson, and B. L. Crissey. 1976. Models in the policy process: Public decision making in the computer era. New York: Russell Sage Foundation.
Hajarolasvadi, H., and V. Shahhosseini. 2020. “Assignment of engineers to constructions project teams based on person-team fit.” Int. J. Constr. Manage. 1–10. https://doi.org/10.1080/15623599.2020.1830554.
He, Q., T. Wang, A. P. Chan, and J. Xu. 2021. “Developing a list of key performance indicators for benchmarking the success of construction megaprojects.” J. Constr. Eng. Manage. 147 (2): 04020164. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001957.
Heravi, G., and M. Ilbeigi. 2012. “Development of a comprehensive model for construction project success evaluation by contractors.” Eng. Constr. Archit. Manage 19 (5): 526–542. https://doi.org/10.1108/09699981211259603.
Herkes, J., K. Churruca, L. A. Ellis, C. Pomare, and J. Braithwaite. 2019. “How people fit in at work: Systematic review of the association between person–organisation and person–group fit with staff outcomes in healthcare.” BMJ Open 9 (5): e026266. https://doi.org/10.1136/bmjopen-2018-026266.
Ingle, P. V., and G. Mahesh. 2020. “Construction project performance areas for Indian construction projects.” Int. J. Constr. Manage. 19 (1): 1–12. https://doi.org/10.1108/JEDT-01-2020-0027.
Iyer, K., and K. Jha. 2005. “Factors affecting cost performance: Evidence from Indian construction projects.” Int. J. Project Manage. 23 (4): 283–295. https://doi.org/10.1016/j.ijproman.2004.10.003.
Kereri, J. O., and C. M. Harper. 2019. “Social networks and construction teams: Literature review.” J. Constr. Eng. Manage. 145 (4): 03119001. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001628.
Kruse, D. L. 1992. “Profit sharing and productivity: Microeconomic evidence from the United States.” Econ. J. 102 (410): 24–36. https://doi.org/10.2307/2234849.
Larsson, J., P. E. Eriksson, and O. Pesämaa. 2018. “The importance of hard project management and team motivation for construction project performance.” Int. J. Managing Project Bus. 11 (2): 275–288. https://doi.org/10.1108/IJMPB-04-2017-0035.
Leon, H., H. Osman, M. Georgy, and M. Elsaid. 2018. “System dynamics approach for forecasting performance of construction projects.” J. Manage. Eng. 34 (1): 04017049. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000575.
Lincoln, J. R., and J. Miller. 1979. “Work and friendship ties in organizations: A comparative analysis of relation networks.” Admin. Sci. Q. 24 (2): 181–199. https://doi.org/10.2307/2392493.
Lopez, R., P. E. Love, D. J. Edwards, and P. R. Davis. 2010. “Design error classification, causation, and prevention in construction engineering.” J. Perform. Constr. Facil. 24 (4): 399–408. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000116.
Love, P. E., and D. J. Edwards. 2005. “Calculating total rework costs in Australian construction projects.” Civ. Eng. Environ. Syst. 22 (1): 11–27. https://doi.org/10.1080/10286600500049904.
Love, P. E., and P.-E. Josephson. 2004. “Role of error-recovery process in projects.” J. Manage. Eng. 20 (2): 70–79. https://doi.org/10.1061/(ASCE)0742-597X(2004)20:2(70).
Love, P. E., J. Matthews, and W. Fang. 2020. “Rework in construction: A focus on error and violation.” J. Constr. Eng. Manage. 146 (9): 06020001. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001901.
Love, P. E., M. Park, and S. Han. 2013. “System dynamics modeling in the project environment.” Math. Comput. Modell. 57 (9–10): 2029–2031. https://doi.org/10.1016/j.mcm.2013.03.003.
Love, P. E., and J. Smith. 2016. “Toward error management in construction: Moving beyond a zero vision.” J. Constr. Eng. Manage. 142 (11): 04016058. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001170.
Martens, A., and M. Vanhoucke. 2020. “Integrating corrective actions in project time forecasting using exponential smoothing.” J. Manage. Eng. 36 (5): 04020044. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000806.
Meng, X. 2012. “The effect of relationship management on project performance in construction.” Int. J. Project Manage. 30 (2): 188–198. https://doi.org/10.1016/j.ijproman.2011.04.002.
Mohammadi, A., and M. Tavakolan. 2019. “Modeling the effects of production pressure on safety performance in construction projects using system dynamics.” J. Saf. Res. 71 (Dec): 273–284. https://doi.org/10.1016/j.jsr.2019.10.004.
Nassar, N., and S. AbouRizk. 2014. “Practical application for integrated performance measurement of construction projects.” J. Manage. Eng. 30 (6): 04014027. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000287.
Nguyen, L. H. 2019. “Relationships between critical factors related to team behaviors and client satisfaction in construction project organizations.” J. Constr. Eng. Manage. 145 (3): 04019002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001620.
Odusami, K., R. Iyagba, and M. Omirin. 2003. “The relationship between project leadership, team composition and construction project performance in Nigeria.” Int. J. Project Manage. 21 (7): 519–527. https://doi.org/10.1016/S0263-7863(02)00059-5.
Olatunde, N. A., D. R. Ogunsemi, and A. E. Oke. 2017. “Impact of team members’ composition on construction projects delivery in selected higher institutions in Nigeria.” J. Eng. Des. Technol. 15 (3): 355–377. https://doi.org/10.1108/JEDT-04-2016-0028.
Palaneeswaran, E., T. Ng, and M. Kumaraswamy. 2006. “Client satisfaction and quality management systems in contractor organizations.” Build. Environ. 41 (11): 1557–1570. https://doi.org/10.1016/j.buildenv.2005.06.004.
Park, M., S.-H. Ji, H.-S. Lee, and W. Kim. 2009. “Strategies for design-build in Korea using system dynamics modeling.” J. Constr. Eng. Manage. 135 (11): 1125–1137. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000095.
Piasentin, K. A., and D. S. Chapman. 2007. “Perceived similarity and complementarity as predictors of subjective person-organization fit.” J. Occup. Organ. Psychol. 80 (2): 341–354. https://doi.org/10.1348/096317906X115453.
Porter, L. W. 1961. “A study of perceived need satisfactions in bottom and middle management jobs.” J. Appl. Psychol. 45 (1): 1–10. https://doi.org/10.1037/h0043121.
Raoufi, M., and A. R. Fayek. 2018. “Key moderators of the relationship between construction crew motivation and performance.” J. Constr. Eng. Manage. 144 (6): 04018047. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001509.
Reichelt, K., and J. Lyneis. 1999. “The dynamics of project performance: Benchmarking the drivers of cost and schedule overrun.” Eur. Manage. J. 17 (2): 135–150. https://doi.org/10.1016/S0263-2373(98)00073-5.
Rose, T., and K. Manley. 2011. “Motivation toward financial incentive goals on construction projects.” J. Bus. Res. 64 (7): 765–773. https://doi.org/10.1016/j.jbusres.2010.07.003.
Sarihi, M., V. Shahhosseini, and M. T. Banki. 2020. “Multiskilled project management workforce assignment across multiple projects regarding competency.” J. Constr. Eng. Manage. 146 (12): 04020134. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001938.
Sekiguchi, T. 2006. “How organizations promote person-environment fit: Using the case of Japanese firms to illustrate institutional and cultural influences.” Asia Pac. J. Manage. 23 (1): 47–69. https://doi.org/10.1007/s10490-006-6115-y.
Seong, J. Y., A. L. Kristof-Brown, W.-W. Park, D.-S. Hong, and Y. Shin. 2015. “Person-group fit: Diversity antecedents, proximal outcomes, and performance at the group level.” J. Manage. 41 (4): 1184–1213. https://doi.org/10.1177/0149206312453738.
Simkoko, E. 1992. “Managing international construction projects for competence development within local firms.” Int. J. Project Manage. 10 (1): 12–22. https://doi.org/10.1016/0263-7863(92)90068-K.
Singh, D., J. Negin, M. Otim, C. G. Orach, and R. Cumming. 2015. “The effect of payment and incentives on motivation and focus of community health workers: Five case studies from low-and middle-income countries.” Hum. Resour. Health 13 (1): 1–12. https://doi.org/10.1186/s12960-015-0051-1.
Sterman, J. 2002. System dynamics: Systems thinking and modeling for a complex world. Cambridge, MA: MIT Sloan School of Management.
Sterman, J. D. 2000. Business dynamics: Systems thinking and modeling for a complex world. New York: McGraw-Hill.
Todorović, M. L., D. Č. Petrović, M. M. Mihić, V. L. Obradović, and S. D. Bushuyev. 2015. “Project success analysis framework: A knowledge-based approach in project management.” Int. J. Project Manage. 33 (4): 772–783. https://doi.org/10.1016/j.ijproman.2014.10.009.
Tuckman, B. W. 1965. “Developmental sequence in small groups.” Psychol. Bull. 63 (6): 384. https://doi.org/10.1037/h0022100.
Van Vianen, A. E. 2017. “A review of person–environment fit research: Prospects for personnel selection.” In The Blackwell handbook of personnel selection, 419–439. Hoboken, NJ: Wiley.
Vogel, R. M., and D. C. Feldman. 2009. “Integrating the levels of person-environment fit: The roles of vocational fit and group fit.” J. Vocational Behav. 75 (1): 68–81. https://doi.org/10.1016/j.jvb.2009.03.007.
Warburton, R., and V. Kanabar. 2008. “The practical calculation of schedule variance in terms of schedule.” In Proc., PMI® Global Congress, 1–15. Denver: Project Management Institute.
Werbel, J. D., and S. W. Gilliland. 1999. “Person–environment fit in the selection process.” In Vol. 17 of Research in human resources management, edited by G. R. Ferris, 209–243. Amsterdam, Netherlands: Elsevier Science/JAI Press.
Werbel, J. D., and D. J. Johnson. 2001. “The use of person–group fit for employment selection: A missing link in person–environment fit.” Hum. Resour. Manage. 40 (3): 227–240. https://doi.org/10.1002/hrm.1013.
Wu, G., X. Zhao, J. Zuo, and G. Zillante. 2019. “Effects of team diversity on project performance in construction projects.” Eng. Constr. Archit. Manage. 26 (3): 408–423. https://doi.org/10.1108/ECAM-05-2018-0220.
Xiao, H., and D. Proverbs. 2002. “Construction time performance: An evaluation of contractors from Japan, the UK and the US.” Eng. Constr. Archit. Manage. 9 (2): 81–89. https://doi.org/10.1108/eb021208.
Yang, L.-R., C.-F. Huang, and K.-S. Wu. 2011. “The association among project manager’s leadership style, teamwork and project success.” Int. J. Project Manage. 29 (3): 258–267. https://doi.org/10.1016/j.ijproman.2010.03.006.
Yates, J. K. 2014. Productivity improvement for construction and engineering: Implementing programs that save money and time. Reston, VA: ASCE.
Zakeri, M., P. Olomolaiye, G. Holt, and F. Harris. 1997. “Factors affecting the motivation of Iranian construction operatives.” Build. Environ. 32 (2): 161–166. https://doi.org/10.1016/S0360-1323(96)00044-3.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 148Issue 11November 2022

History

Received: Feb 5, 2022
Accepted: Jul 11, 2022
Published online: Sep 9, 2022
Published in print: Nov 1, 2022
Discussion open until: Feb 9, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Hossein Hajarolasvadi, S.M.ASCE https://orcid.org/0000-0003-4632-6834
Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Amirkabir Univ. of Technology (Tehran Polytechnic), Tehran 15875-4413, Iran. ORCID: https://orcid.org/0000-0003-4632-6834
Vahid Shahhosseini [email protected]
Assistant Professor, Dept. of Civil and Environmental Engineering, Amirkabir Univ. of Technology (Tehran Polytechnic), Tehran 15875-4413, Iran (corresponding author). Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share