Abstract

This research proposes a framework to determine the most appropriate project manager (PM) to enhance the performance of occupational groups (POGs) in large, medium, and small road construction projects in warm regions. The occupational groups (OGs) in road projects were divided into three categories: workers, technicians, and engineers. Using the Pareto principle, 14 critical project manager competencies (PMCs) were extracted from a 70-item list developed by performing a comprehensive literature review. Two indexes were ranked in each size of road project using the analytic hierarchy process (AHP) technique: which OG’s performance improves the most when the PMCs identified are implemented, and the importance of each PMC in improving the POGs. The results showed that in small projects, a PM with strong communication skills is needed to maximize the performance of all three OGs, whereas negotiation skills in medium projects and project management knowledge in large projects are the most critical PMCs that a PM should possess to increase engineers’ performance. The findings can help road construction firms to select the most appropriate PM to improve the POGs for road projects by project size, eventually leading to project success. The principal distinction of this research is its investigation of the correlation between PMCs and the POGs across different road project sizes. The main limitation of this research is that the research scope was limited to warm zones.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and code generated or used during the study appear in the published article.

References

Abdel-malak, F. F., U. H. Issa, Y. H. Miky, and E. A. Osman. 2017. “Applying decision-making techniques to civil engineering projects.” Beni-Suef Uni. J. Basic Appl. Sci. 6 (4): 326–331. https://doi.org/10.1016/j.bjbas.2017.05.004.
Afshari, A. R. 2017. “Methods for selection of construction project manager: Case study.” J. Constr. Eng. Manage. 143 (12): 06017003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001400.
Ahadzie, D., D. Proverbs, and I. Sarkodie-Poku. 2014. “Competencies required of project managers at the design phase of mass house building projects.” Int. J. Project Manage. 32 (6): 958–969. https://doi.org/10.1016/j.ijproman.2013.10.015.
Ahmadian Fard Fini, A., A. Akbarnezhad, T. H. Rashidi, and S. T. Waller. 2016. “Job assignment based on brain demands and human resource strategies.” J. Constr. Eng. Manage. 143 (5): 04016123. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001273.
Al-Harbi, K. M. A.-S. 2001. “Application of the AHP in project management.” Int. J. Project Manage. 19 (1): 19–27. https://doi.org/10.1016/S0263-7863(99)00038-1.
Alvarenga, J. C., R. R. Branco, A. L. Azevedo Guedes, C. A. Pereira Soares, and W. da Silveira e Silva. 2019. “The project manager core competencies to project success.” Int. J. Managing. Projects Bus. 13 (2): 277–292. https://doi.org/10.1108/IJMPB-12-2018-0274.
Bentahar, O., and L. A. Ika. 2019. “Matching the project manager’s roles to project types: Evidence from large dam projects in Africa.” IEEE Trans. Eng. Manage. 67 (3): 830–845. https://doi.org/10.1109/TEM.2019.2895732.
Boehm, B., and R. Turner. 2003. Balancing agility and discipline, a guide for the perplexed. Boston: Addison Wesley.
Caerteling, J. S., J. I. M. Halman, M. Song, and A. G. Dorée. 2009. “Impact of government and corporate strategy on the performance of technology projects in road construction.” J. Constr. Eng. Manage. 135 (11): 1211–1221. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000089.
Caldas, C. H., D. G. Torrent, and C. T. Haas. 2005. “GPS technology for locating fabricated pipes on industrial projects.” In Proc., ASCE Int. Conf. on Computing in Civil Engineering. Reston, VA: ASCE.
Cha, J., and E. Maytorena-Sanchez. 2019. “Prioritising project management competences across the software project life cycle.” Int. J. Managing Projects Bus. 12 (4): 961–978.
Chawla, V. K., A. K. Chanda, S. Angra, and G. R. Chawla. 2018. “The sustainable project management: A review and future possibilities.” J. Project Manage. 3 (3): 157–170. https://doi.org/10.5267/j.jpm.2018.2.001.
Chipulu, M., J. G. Neoh, U. U. Ojiako, and T. Williams. 2013. “A multidimensional analysis of project manager competences.” IEEE Trans. Eng. Manage. 60 (3): 506–517. https://doi.org/10.1109/TEM.2012.2215330.
Cox, R. F., R. R. A. Issa, and D. Ahrens. 2003. “Management’s perception of key performance indicators for construction.” J. Constr. Eng. Manage. 129 (2): 142–151. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:2(142).
Dainty, A. R. J., M.-I. Cheng, and D. R. Moore. 2005. “Competency-based model for predicting construction project managers’ performance.” J. Manage. Eng. 21 (1): 2–9. https://doi.org/10.1061/(ASCE)0742-597X(2005)21:1(2).
Ellis, G. 2016. “Phase–gate: Extending the critical path method.” Chap. 5 in Project management in product development: Leadership skills and management techniques to deliver great products, 93–141. Oxford, UK: Butterworth-Heinemann. https://doi.org/10.1016/b978-0-12-802322-8.00005-x.
Engineers Australia. 2003. Australian engineering competency standards. Barton, ACT, Australia: Engineers Australia.
Geoghegan, L., and V. Dulewicz. 2008. “Do project managers’ leadership competencies contribute to project success?” Project Manage. J. 39 (4): 58–67. https://doi.org/10.1002/pmj.20084.
Gharouni Jafari, K., N. S. Ghazi Sharyatpanahi, and E. Noorzai. 2020. “BIM-based integrated solution for analysis and management of mismatches during construction.” J. Eng. Des. Tech. 19 (1): 81–102. https://doi.org/10.1108/JEDT-02-2020-0044.
Gharouni Jafari, K., E. Noorzai, and M. R. Hosseini. 2021. “Assessing the capabilities of computing features in addressing the most common issues in the AEC industry.” Constr. Innov. https://doi.org/10.1108/CI-04-2020-0050.
Golabchi, M., and E. Noorzai. 2013. Projects delivery methods. Tehran, Iran: University of Tehran Press.
Gonzalez-Marcos, A., F. Alba-Elias, and J. Ordieres-Meré. 2016. “An analytical method for measuring competence in project management.” British J. Edu. Tech. 47 (6): 1324–1339. https://doi.org/10.1111/bjet.12364.
Goodrum, P. M., and C. T. Haas. 2004. “Long-term impact of equipment technology on labor productivity in the U.S. construction industry at the activity level.” J. Constr. Eng. Manage. 130 (1): 124–133. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(124).
Hass, K. B. 2007. “The blending of traditional and agile project management.” PM World Today 9 (5): 1–8.
Havila, V., C. J. Medlin, and A. Salmi. 2013. “Project-ending competence in premature project closures.” Int. J. Project Manage. 31 (1): 90–99. https://doi.org/10.1016/j.ijproman.2012.05.001.
Hwang, B.-G., and W. J. Ng. 2013. “Project management knowledge and skills for green construction: Overcoming challenges.” Int. J. Project Manage. 31 (2): 272–284. https://doi.org/10.1016/j.ijproman.2012.05.004.
IPMA (International Project Management Association). 2006. IPMA competency baseline (ICB), ver.3. Amsterdam, Netherlands: IPMA.
Jergeas, G. 2010. “Top 10 areas for construction productivity improvement on Alberta oil and gas construction projects.” In Proc., Construction Research Congress 2010: Innovation for Reshaping Construction Practice. Reston, VA: ASCE. https://doi.org/10.1061/41109(373)103.
Kang, J. H., S. D. Anderson, and M. J. Clayton. 2007. “Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling.” J. Constr. Eng. Manage. 133 (6): 447–461. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:6(447).
Keren, B., Y. Hadad, and Z. Laslo. 2014. “Combining AHP and DEA methods for selecting a project manager.” Manage. J. Sustainable Bus. Manage. Solutions Emerging Econ. 19 (71): 17–28. https://doi.org/10.7595/management.fon.2014.0016.
Khattak, M. S., and U. Mustafa. 2019. “Management competencies, complexities and performance in engineering infrastructure projects of Pakistan.” Eng. Constr. Arch. Manage. 26 (7): 1321–1347. https://doi.org/10.1108/ECAM-05-2017-0079.
Khawam, A. A., and N. S. Bostain. 2019. “Project manager’s role in safety performance of Saudi construction.” Int. J. Managing Projects Bus. 12 (4): 938–960. https://doi.org/10.1108/IJMPB-04-2018-0087.
Kiran, D. R. 2017. “Seven traditional tools of TQM.” In Total quality management, 271–290. Oxford, UK: Butterworth–Heinemann.
Lai, C.-Y., J. S.-C. Hsu, and Y. Li. 2018. “Leadership, regulatory focus and information systems development project team performance.” Int. J. Project Manage. 36 (3): 566–582. https://doi.org/10.1016/j.ijproman.2017.11.001.
Larsson, J., P. E. Eriksson, T. Olofsson, and P. Simonsson. 2015. “Leadership in civil engineering: Effects of project managers’ leadership styles on project performance.” J. Manage. Eng. 31 (6): 04015011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000367.
Lartigue, B., B. Lasternas, and V. Loftness. 2014. “Multi-objective optimization of building envelope for energy consumption and daylight.” Indoor Built Environ. 23 (1): 70–80. https://doi.org/10.1177/1420326X13480224.
Levy, P. S., and S. Lemeshow. 2011. Sampling of populations: Methods and applications. 4th ed. Hoboken, NJ: Wiley.
Loufrani-Fedida, S., and S. Missonier. 2015. “The project manager cannot be a hero anymore! Understanding critical competencies in project-based organizations from a multilevel approach.” Int. J. Project Manage. 33 (6): 1220–1235. https://doi.org/10.1016/j.ijproman.2015.02.010.
Luo, L., Q. He, J. Xie, D. Yang, and G. Wu. 2016. “Investigating the relationship between project complexity and success in complex construction projects.” J. Manage. Eng. 33 (2): 04016036. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000471.
Machairas, V., A. Tsangrassoulis, and K. Axarli. 2014. “Algorithms for optimization of building design: A review.” Renewable Sustainable Energy Rev. 31 (1364): 101–112. https://doi.org/10.1016/j.rser.2013.11.036.
Mahamid, I., A. Bruland, and N. Dmaidi. 2012. “Causes of delay in road construction projects.” J. Manage. Eng. 28 (3): 300–310. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000096.
Mahboob, T., B. Tariq, S. Anwar, and M. Khanum. 2015. “Pareto analysis of critical success factors for total quality management targeting the service industry.” Int. J. Computer Appl. 121 (14): 20–24. https://doi.org/10.5120/21608-4678.
Management and Planning Organization. 2021. “Management and planning organization associated with Sistan and Baluchestan province.” Accessed July 6, 2021. https://www.usb.ac.ir/en/About-USB/About-Sistan-and-Baluchestan-Province.
Meng, X., and P. Boyd. 2017. “The role of the project manager in relationship management.” Int. J. Project Manage. 35 (5): 717–728. https://doi.org/10.1016/j.ijproman.2017.03.001.
Mohammadi, F., M. Kazerooni Sadi, F. Nateghi, A. Abdullah, and M. Skitmore. 2014. “A hybrid quality function deployment and cybernetic analytic network process model for project manager selection.” J. Civ. Eng. Manage. 20 (6): 795–809. https://doi.org/10.3846/13923730.2014.945952.
Molenaar, K. R., and D. D. Gransberg. 2001. “Design-builder selection for small highway projects.” J. Manage. Eng. 17 (4): 214–223. https://doi.org/10.1061/(ASCE)0742-597X(2001)17:4(214).
Müller, R., J. Geraldi, and J. R. Turner. 2012. “Relationships between leadership and success in different types of project complexities.” IEEE Trans. Eng. Manage. 59 (1): 77–90. https://doi.org/10.1109/TEM.2011.2114350.
Nasir, H., C. T. Haas, C. H. Caldas, and P. T. Goodrum. 2016. “An integrated productivity-practices implementation index for planning the execution of infrastructure projects.” J. Infrastruct. Syst. 22 (2): 04015022. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000275.
Noorzai, E. 2021. “PPP risks in conflict zones and solutions: A case study for Afghanistan.” J. Infrastruct. Syst. 27 (1): 05021001. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000599.
Noorzai, E. 2020. “Performance analysis of alternative contracting methods for highway construction projects: Case study for Iran.” J. Infrastruct. Syst. 26 (2): 04020003. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000528.
Noorzai, E., K. Gharouni Jafari, and L. Moslemi Naeini. 2020. “Lessons learned on selecting the best mass housing method based on performance evaluation criteria in Iran.” Int. J. Constr. Educ. Res. https://doi.org/10.1080/15578771.2020.1867258.
Noorzai, E., and M. Golabchi. 2020. “Selecting a proper construction system in small and medium mass housing projects, considering success criteria and construction volume and height.” J. Eng. Des. Technol. 18 (4): 883–903. https://doi.org/10.1108/JEDT-09-2019-0227.
Opelt, A., B. Gloger, W. Pfarl, and R. Mittermayr. 2013. Agile contracts—Creating and managing successful projects with scrum. Hoboken, NJ: Wiley.
Peng, J., J. Y. Lin, X. D. Wang, and W.-J. Zhang. 2001. “Gradient analysis on regional economic development of Sichuan province.” Geogr. Territorial Res. 4: 53–57.
Pérez López, S., J. M. Montes Peón, and C. J. Vazquez Ordás. 2005. “Organizational learning as a determining factor in business performance.” Learn. Organ 12 (3): 227–245. https://doi.org/10.1108/09696470510592494.
PMI (Project Management Institute). 2017. A guide to the project management body of knowledge. Philadelphia: PMI.
Podgórska, M., and M. Pichlak. 2019. “Analysis of project managers’ leadership competencies: Project success relation: What are the competencies of polish project leaders?” Int. J. Managing Projects Bus. 12 (4): 869–887. https://doi.org/10.1108/IJMPB-08-2018-0149.
Ramazani, J., and G. Jergeas. 2015. “Project managers and the journey from good to great: The benefits of investment in project management training and education.” Int. J. Project Manage. 33 (1): 41–52. https://doi.org/10.1016/j.ijproman.2014.03.012.
Rashidi, A., F. Jazebi, and I. Brilakis. 2011. “Neurofuzzy genetic system for selection of construction project managers.” J. Constr. Eng. Manage. 137 (1): 17–29. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000200.
Rezk, S., G. C. Whited, and A. S. Hanna. 2018. “Quantitative assessment of project manager competencies for Wisconsin Department of Transportation.” In Proc., Construction Research Congress 2018, 702–711. Reston, VA: ASCE. https://doi.org/10.1061/9780784481295.070.
Rezk, S., G. C. Whited, M. Ibrahim, and A. S. Hanna. 2019. “Competency assessment for state highway agency project managers.” Transp. Res. Rec. 2673 (3): 658–666. https://doi.org/10.1177/0361198119832870.
Robichaud, L. B., and V. S. Anantatmula. 2011. “Greening project management practices for sustainable construction.” J. Manage. Eng. 27 (1): 48–57. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000030.
Saaty, T. L., and L. G. Vargas. 2000. Models, methods, concepts and applications of the analytic hierarchy process. Boston: Kluwer Academic.
Sadeghi, H., M. Mousakhani, M. Yazdani, and M. Delavari. 2014. “Evaluating project managers by an interval decision-making method based on a new project manager competency model.” Arab J. Sci. Eng. 39: 1417–1430. https://doi.org/10.1007/s13369-013-0631-0.
Santoso, D. S., and S. Soeng. 2016. “Analyzing delays of road construction projects in Cambodia: Causes and effects.” J. Manage. Eng. 32 (6): 05016020. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000467.
Shokri, S., S. Ahn, S. Lee, C. T. Haas, and R. C. G. Haas. 2015. “Current status of interface management in construction: Drivers and effects of systematic interface management.” J. Constr. Eng. Manage. 142 (2): 04015070. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001035.
Shrestha, P. P., K. K. Shrestha, and T. K. Kandie. 2017. “Effects of change orders on the cost and schedule of rural road maintenance projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 9 (3): 04517010. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000227.
Skibniewski, M. J., and L.-C. Chao. 1992. “Evaluation of advanced construction technology with AHP method.” J. Constr. Eng. Manage. 118 (3): 577–593. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:3(577).
Skopina, M. 2017. “On construction of multivariate Parseval wavelet frames.” Appl. Math. Comput. 301 (May): 1–11. https://doi.org/10.1016/j.amc.2016.12.013.
Smith, G. J. 2005. “Gambling studies.” In Encyclopedia of social measurement. Amsterdam, Netherlands: Elsevier.
Takey, S. M., and M. Monteiro de Carvalho. 2015. “Competency mapping in project management: An action research study in an engineering company.” Int. J. Project Manage. 33 (4): 784–796. https://doi.org/10.1016/j.ijproman.2014.10.013.
Thomas, H. R., and R. D. Ellis Jr. 2017. Construction site management and labor productivity improvement: How to improve the bottom line and shorten the project schedule. Reston, VA: ASCE.
Torfi, F., and A. Rashidi. 2011. “Selection of project managers in construction firms using analytic hierarchy process (AHP) and fuzzy TOPSIS: A case study.” J. Constr. Dev. Countries 16 (1): 69–89.
TRB (Transportation Research Board). 2016. Highway capacity manual (HCM). Washington, DC: TRB.
Turner, J. R., R. Muller, and V. Dulewicz. 2009. “Comparing the leadership styles of functional and project managers.” Int. J. Managing Projects Bus. 2 (2): 198–216. https://doi.org/10.1108/17538370910949266.
Turner, J. R., and R. Müller. 2005. “The project manager’s leadership style as a success factor on projects: A literature review.” Project Manage. J. 36 (2): 49–61. https://doi.org/10.1177/875697280503600206.
ul Musawir, A., S. B. Abd-Karim, and M. S. Mohd-Danuri. 2020. “Project governance and its role in enabling organizational strategy implementation: A systematic literature review.” Int. J. Project Manage. 38 (1): 1–16. https://doi.org/10.1016/j.ijproman.2019.09.007.
Vaagaasar, A. L. 2011. “Development of relationships and relationship competencies in complex projects.” Int. J. Managing Projects Bus. 4 (2): 294–307. https://doi.org/10.1108/17538371111120252.
Vuorinen, L., and M. Martinsuo. 2018. “Program integration in multi-project change programs: Agency in integration practice.” Int. J. Project Manage. 36 (4): 583–599. https://doi.org/10.1016/j.ijproman.2018.02.003.
Wen, Q., and M. Qiang. 2019. “Project managers’ competences in managing project closing.” Project Manage. J. 50 (3): 361–375. https://doi.org/10.1177/8756972819832783.
Williamson, K. 2002. Research techniques: Sampling. Research methods for students, academics and professionals. Sawston, UK: Chandos Publishing.
Xing, B., and A. Zhang. 2006. “Application of fuzzy analytical hierarchy process in selecting a project manager.” In Proc., Int. Conf. on Management Science and Engineering. New York: IEEE.
Zhai, X., A. M. M. Liu, and R. Fellows. 2014. “Role of human resource practices in enhancing organizational learning in Chinese construction organizations.” J. Manage. Eng. 30 (2): 194–204. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000207.
Zhang, Y., Y.-S. Yan, M.-K. Wang, and Z.-A. Hu. 2007. “Empirical research on road transportation regional classification.” In Proc., 1st Int. Conf. on Transportation Engineering 2000. Reston, VA: ASCE. https://doi.org/10.1061/9780784409329.
Zheng, J., Q. Wen, and M. Qiang. 2020. “Understanding demand for project manager competences in the construction industry: Data mining approach.” J. Constr. Eng. Manage. 146 (8): 04020083. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001865.
Zitzler, E., M. Laumanns, and L. Thiele. 2001. SPEA2: Improving the strength Pareto evolutionary algorithm. Zurich, Switzerland: Computer Engineering and Networks Laboratory.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 147Issue 10October 2021

History

Received: Jun 3, 2020
Accepted: May 21, 2021
Published online: Aug 10, 2021
Published in print: Oct 1, 2021
Discussion open until: Jan 10, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Graduated Student, Bachelor’s Degree in Accounting, Univ. of Tehran, Tehran 1446833955, Iran (corresponding author). ORCID: https://orcid.org/0000-0001-9273-3161. Email: [email protected]
Lecturer, Dept. of Project and Construction Management, School of Architecture, Univ. of Tehran, Tehran 1415564583, Iran. ORCID: https://orcid.org/0000-0001-5547-1158. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • A framework to implement augmented reality based on BIM to improve operation and maintenance of mechanical facilities of commercial complexes, Facilities, 10.1108/F-04-2022-0064, 41, 3/4, (229-247), (2023).
  • Interaction and effects of dangerous and hidden points on firefighter’s health during fire overhaul using the PLS-SEM technique, Facilities, 10.1108/F-02-2022-0019, 41, 3/4, (265-279), (2023).
  • BIM-based solution to enhance the performance of public-private partnership construction projects using copula bayesian network, Expert Systems with Applications, 10.1016/j.eswa.2023.119501, 216, (119501), (2023).
  • CRITICAL FACTORS INFLUENCING INVENTORY AND PROCUREMENT SYSTEM OF INFRASTRUCTURE PROJECTS, JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 10.3846/jcem.2022.16681, 28, 8, (634-645), (2022).
  • UNDERSTANDING THE CHANGES IN CONSTRUCTION PROJECT MANAGERS’ COMPETENCES THROUGH RESUME DATA MINING, JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 10.3846/jcem.2022.16579, 28, 4, (305-319), (2022).
  • Determining the optimal method to upgrade shipyard infrastructures for overhaul of offshore drilling rigs using genetic algorithm: A case study for ISOICO, Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment, 10.1177/14750902221076937, 236, 3, (569-584), (2022).
  • Evaluating and optimizing performance of public–private partnership projects using copula Bayesian network, Engineering, Construction and Architectural Management, 10.1108/ECAM-05-2022-0492, (2022).
  • Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning, Engineering, Construction and Architectural Management, 10.1108/ECAM-05-2022-0450, (2022).
  • Integration of risk management within the building information modeling (BIM) framework, Engineering, Construction and Architectural Management, 10.1108/ECAM-04-2021-0327, (2022).
  • Evaluating lean techniques to improve success factors in the construction phase, Construction Innovation, 10.1108/CI-05-2021-0102, (2022).
  • See more

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share