Abstract

Traditional design–bid–build guidelines suggest that engineering estimates should be within +/10% of the lowest contractor bid and recommend this value as a reference to identify anomalies in the bidding process. This guidance, however, neglects delivery approaches such as design–build (D–B). This research examines 305 D–B highway projects procured using best-value and identifies the underlying reasons for bid dispersion and cost estimates inaccuracies. This study found an average bid dispersion of 27%, suggesting that a larger threshold (i.e., 25%) is needed to account for the inherent variability of D–B projects. This study also found that engineering estimates are on average 2% more than the awarded price. This result contradicts findings in existing literature and suggests that current practice in D–B best-value may be more conservative than other procurement methods. The study explores four potential reasons for bid dispersion and engineering estimate inaccuracies and suggests strategies for improvement. By providing a better understanding of bid dispersion and engineering estimate accuracy, this study will ultimately assist in the development of new policies and processes for D–B best-value projects.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or codes that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

The authors appreciate the assistance received from all the DOTs around the United States in conducting this research.

Disclaimer

The views expressed in the paper are exclusive of the authors and do not reflect the official policy or position of any US DOT.

References

AACEI (Association for the Advancement of Cost Engineering International). 2019. Cost estimate classification system. Morgantown, WV: AACEI.
Alleman, D., D. Tran, A. Antoine, and K. Molenaar. 2017. Engineering estimate accuracy of highway construction alternative delivery methods. Morgantown, WV: AACEI.
Alroomi, A., H. David Jeong, and G. D. Oberlender. 2016. “Evaluation of methods to retain cost estimating competencies using structural equation modeling.” J. Manage. Eng. 32 (1): 04015026. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000380.
Anderson, S. D., and B. C. Blashcke. 2004. Statewide highway letting program management. Washington, DC: National Cooperative Highway Research Program.
Anderson, S. D., K. R. Molenaar, and C. J. Schexnayder. 2007. Guidance for cost estimation and management for highway projects during planning, programming, and preconstruction. Washington, DC: National Cooperative Highway Research Program.
Antoine, A. L. C., D. Alleman, and K. R. Molenaar. 2019. “Examination of project duration, project intensity, and timing of cost certainty in highway project delivery methods.” J. Manage. Eng. 35 (1): 04018049. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000661.
Antoine, A. L. C., and K. R. Molenaar. 2016. “Empirical study of the state of the practice in alternative technical concepts in highway construction projects.” Transp. Res. Rec. 2573 (1): 143–148. https://doi.org/10.3141/2573-17.
Calahorra-Jimenez, M., K. Molenaar, C. Torres-Machi, A. Chamorro, and L. F. Alarcón. 2020. “Structured approach for best-value evaluation criteria: US design-build highway procurement.” J. Manage. Eng. 36 (6): 04020086. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000857.
Calahorra-Jimenez, M., C. Torres-Machi, A. Chamorro, L. F. Alarcón, and K. Molenaar. 2021. “Importance of noncost criteria weighing in best-value design–build US highway projects.” J. Manage. Eng. 37 (4): 04021027. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000912.
Chen, Q., Z. Jin, B. Xia, P. Wu, and M. Skitmore. 2016. “Time and cost performance of design–build projects.” J. Constr. Eng. Manage. 142 (2): 04015074. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001056.
Choi, K., I. Jung, Y. Yin, C. Gurganus, and H. D. Jeong. 2020. “Holistic performance evaluation of highway design-build projects.” J. Manage. Eng. 36 (4): 04020024. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000781.
Creedy, G. D., M. Skitmore, and J. K. W. Wong. 2010. “Evaluation of risk factors leading to cost overrun in delivery of highway construction projects.” J. Constr. Eng. Manage. 136 (5): 528–537. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000160.
DBIA (Design-Build Institute of America). 2019. “Design-build authorization map.” Accessed December 1, 2019. https://dbia.org/advocacy/state/pending-legislation/.
Duggan, T., and D. Patel. 2014. Design-build market delivery market share and market size report. Norwell, MA: Reed Construction Data/RSMeans Consulting.
El Asmar, M., D. Ramsey, G. E. Gibson, and W. Bearup. 2020. “Design-build for transportation projects: Cost and schedule change performance analysis.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519030. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000335.
FHWA (Federal Highway Administration). 2006. Study to congress on the effectiveness of design-build project delivery relating to the federal-aid highway program. Washington, DC: FHWA.
FHWA (Federal Highway Administration). 2015. National review of state cost estimation practice. Washington, DC: USDOT, FHWA.
FHWA (Federal Highway Administration). 2017. Alternative contracting method performance in US highway construction. Washington, DC: Research, Development, and Technology Turner-Fairbank Highway Research Center, FHWA.
FHWA (Federal Highway Administration). 2018. “Every day counts (EDC), a state-based initiative of FHWA’s center for accelerating innovation.” Accessed December 01, 2019. https://www.fhwa.dot.gov/innovation/everydaycounts/edc-2/pdfs/edc_design.pdf.
FHWA (Federal Highway Administration). 2019. FHWA lacks adequate oversight and guidance for engineer’s estimates. Washington, DC: Office of Legal, Legislative, and External Affairs–US DOT, FHWA.
Flyvbjerg, B., M. S. Holm, and S. Buhl. 2002. “Underestimating costs in public works projects: Error or lie?” J. Am. Plann. Assoc. 68 (3): 279–295. https://doi.org/10.1080/01944360208976273.
FMI (Fails Management Institute). 2018. “Design-build utilization: Combined market study.” Accessed December 1, 2019. https://dbia.org/wp-content/uploads/2018/06/Design-Build-Market-Research-FMI-2018.pdf.
Franz, B., K. R. Molenaar, and B. A. M. Roberts. 2020. “Revisiting project delivery system performance from 1998 to 2018.” J. Constr. Eng. Manage. 146 (9): 04020100. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001896.
Gransberg, D. D. 2020. “Does low bid award facilitate wrongdoing? US implications of Quebec’s Charbonneau Commission report.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 03719004. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000357.
Hale, D. R., P. P. Shrestha, G. E. Gibson, and G. C. Migliaccio. 2009. “Empirical comparison of design/build and design/bid/build project delivery methods.” J. Constr. Eng. Manage. 135 (7): 579–587. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000017.
He, X., R. Liu, and C. J. Anumba. 2021. “Data-driven insights on the knowledge gaps of conceptual cost estimation modeling.” J. Constr. Eng. Manage. 147 (2): 04020165. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001963.
Ilbeigi, M., B. Ashuri, and A. Joukar. 2017. “Time-series analysis for forecasting asphalt-cement price.” J. Manage. Eng. 33 (1): 04016030. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000477.
Jennings, W. 2012. “Why costs overrun: Risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games.” Construct. Manage. Econ. 30 (6): 455–462. https://doi.org/10.1080/01446193.2012.668200.
Karaca, I., D. D. Gransberg, and H. D. Jeong. 2020. “Improving the accuracy of early cost estimates on transportation infrastructure projects.” J. Constr. Eng. Manage. 36 (5): 04020063. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000819.
Liang, Y., B. Ashuri, and W. Sun. 2019. “Identifying patterns in design-build projects in terms of project cost performance.” In Proc., ASCE Int. Conf. on Computing in Civil Engineering 2019, 122–129. Reston, VA: ASCE.
Liang, Y., B. Ashuri, and W. Sun. 2020. “Analysis of the variability of project cost and schedule performance in the design-build environment.” J. Constr. Eng. Manage. 146 (6): 04020060. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001851.
Lu, W., Y. Y. Hua, and S. J. Zhang. 2017. “Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects.” Eng. Constr. Archit. Manage. 24 (1): 118–132. https://doi.org/10.1108/ECAM-07-2015-0119.
Minchin, R. E., Jr., X. Li, R. R. Issa, and G. G. Vargas. 2013. “Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida.” J. Constr. Eng. Manage. 139 (10): 04013007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000746.
Molenaar, K. R. 2005. “Programmatic cost risk analysis for highway megaprojects.” J. Constr. Eng. Manage. 131 (3): 343–353. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(343).
Molenaar, K. R., and D. D. Gransberg. 2001. “Design-builder selection for small highway projects.” J. Constr. Eng. Manage. 17 (4): 214–223. https://doi.org/10.1061/(ASCE)0742-597X(2001)17:4(214).
Molenaar, K. R., N. Sobin, and E. I. Antillón. 2010. “A synthesis of best-value procurement practices for sustainable design-build projects in the public sector.” J. Green Build. 5 (4): 148–157. https://doi.org/10.3992/jgb.5.4.148.
Molenaar, K. R., and D. Tran. 2015. Practices for developing transparent best value selection procedures. Washington, DC: Transportation Research Board, National Cooperative Highway Research Program.
Molenaar, K. R., S. Won, and R. Smith. 2006. “Expectations for accuracy in highway design-build cost estimates.” In Proc., Int. Council for Research and Innovation in Building and Construction, Construction Research Council, Construction Institute, American Society of Civil Engineers, 2nd Specialty Conf. on Leadership and Management in Construction, 1–9. Reston, VA: ASCE.
Moon, H., K. Kim, H.-S. Lee, M. Park, T. P. Williams, B. Son, and J.-Y. Chun. 2020. “Cost performance comparison of design-build and design-bid-build for building and civil projects using mediation analysis.” J. Constr. Eng. Manage. 146 (9): 04020113. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001873.
Nguyen, P. H. D., B. C. Lines, and D. Q. Tran. 2018. “Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes.” J. Constr. Eng. Manage. 144 (10): 126–136. https://doi.org/10.1061/9780784481271.013.
Oberlender, G., and S. Trost. 2001. “Predicting accuracy of early cost estimates based on estimate quality.” J. Constr. Eng. Manage. 127 (3): 173–182. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(173).
OECD/ITF (Organization for Economic Cooperation and Development/International Transport Forum). 2013. “Spending on transport infrastructure 1995-2011: Trends, policies, data.” Accessed May 15, 2019. https://www.itf-oecd.org/sites/default/files/docs/13spendingtrends.pdf.
Ramsey, D., M. El Asmar, and G. E. Gibson. 2016. “Quantitative performance assessment of single-step versus two-step design-build procurement.” J. Constr. Eng. Manage. 142 (9): 04016033. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001145.
Riley, D. R., B. E. Diller, and D. Kerr. 2005. “Effects of delivery systems on change order size and frequency in mechanical construction.” J. Constr. Eng. Manage. 131 (9): 953–962. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:9(953).
Scheepbouwer, E., D. D. Gransberg, and C. Lopez del Puerto. 2017. “Construction engineering management culture shift: Is the lowest tender offer dead?” Front. Eng. Manage. 4 (1): 49–57. https://doi.org/10.15302/J-FEM-2017014.
Shane, J., K. Strong, and D. Gransberg. 2013. Guide to project management strategies for complex projects. Washington, DC: National Academies Press.
Shrestha, P. P., and J. D. Fernane. 2017. “Performance of design-build and design-bid-build projects for public universities.” J. Constr. Eng. Manage. 143 (3): 04016101. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001241.
Shrestha, P. P., J. T. O’Connor, and G. E. Gibson Jr. 2012. “Performance comparison of large design-build and design-bid-build highway projects.” J. Constr. Eng. Manage. 138 (1): 1–13. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000390.
Sullivan, J., M. El Asmar, J. Chalhoub, and H. Obeid. 2017. “Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality.” J. Constr. Eng. Manage. 143 (6): 04017009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001282.
Tran, D. Q., G. Diraviam, and R. E. Minchin. 2018. “Performance of highway design-bid-build and design-build projects by work types.” J. Constr. Eng. Manage. 144 (2): 04017112. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001437.
Wilcoxon, F. 1945. “Individual comparisons by ranking methods.” Biom. Bull. 1 (6): 80–83. https://doi.org/10.2307/3001968.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 147Issue 7July 2021

History

Received: Jul 13, 2020
Accepted: Feb 24, 2021
Published online: May 7, 2021
Published in print: Jul 1, 2021
Discussion open until: Oct 7, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

Suraj V. Gaikwad [email protected]
Graduate Research Assistant, Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado Boulder, 1111 Engineering Dr., Boulder, CO 80309-0428. Email: [email protected]
Maria Calahorra-Jimenez, Ph.D., S.M.ASCE [email protected]
Assistant Professor, Dept. of Construction Management, Lyles College of Engineering, California State Univ., Fresno, 2320 E. San Ramon Ave., Fresno, CA 93740. Email: [email protected]
Keith R. Molenaar, Ph.D., M.ASCE [email protected]
K. Stanton Lewis Professor, Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado Boulder, 1111 Engineering Dr., Boulder, CO 80309-0428. Email: [email protected]
Cristina Torres-Machi, Ph.D., M.ASCE https://orcid.org/0000-0002-4334-4474 [email protected]
Assistant Professor, Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado Boulder, 1111 Engineering Dr., Boulder, CO 80309-0428 (corresponding author). ORCID: https://orcid.org/0000-0002-4334-4474. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share