Technical Papers
Mar 8, 2021

Framework for Identifying Competencies of Construction Workers

Publication: Journal of Construction Engineering and Management
Volume 147, Issue 5

Abstract

Any occupation requires a certain set of competencies at a given employment level. Although in the construction industry the competency requirements for mid- and upper-level employees are very well defined, such clear definitions at the workers’ level are missing. Literature suggests that along with practical skills, workers require additional socioemotional, cognitive, and technical competencies to perform their work efficiently. Therefore, through a nationwide survey of 598 industrial professionals in India, 6, 9, and 13 competencies were identified for unskilled, semiskilled, and skilled categories of workers, respectively. These competencies included attitude, motivation, and physical strength for unskilled workers; self-confidence and technical knowledge for semiskilled workers; and writing, reading, mathematical, and problem-solving skills for skilled workers. These results will have threefold implications. First, they will assist training providers designing an effective worker training program. Second, they will help the development of a career progression path for the workers. Third, if the identified competencies are considered in workers’ categorization process, then the latter will become more robust than the existing one, in which only practical skills are considered.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request. The sample questionnaire and responses from the experts used in this study are available from the corresponding author upon reasonable request.

References

Afshari, A. R. 2017. “Methods for selection of construction project manager: Case study.” J. Constr. Eng. Manage. 143 (12): 06017003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001400.
Agrawal, T., and A. Agrawal. 2017. “Vocational education and training in India: A labour market perspective.” J. Vocational Educ. Training 69 (2): 246–265. https://doi.org/10.1080/13636820.2017.1303785.
Allmendinger, J. 1989. “Educational systems and labor market outcomes.” Eur. Sociological Rev. 5 (3): 231–250. https://doi.org/10.1093/oxfordjournals.esr.a036524.
Assaf, S. A., and S. Al-Hejji. 2006. “Causes of delay in large construction projects.” Int. J. Project Manage. 24 (4): 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010.
Atalah, A. 2014. “Comparison of personality traits among estimators, project managers, and the population.” J. Manage. Eng. 30 (2): 173–179. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000209.
Chakraborty, T., S. K. Das, V. Pathak, and S. Mukhopadhyay. 2018. “Occupational stress, musculoskeletal disorders and other factors affecting the quality of life in Indian construction workers.” Int. J. Constr. Manage. 18 (2): 144–150. https://doi.org/10.1080/15623599.2017.1294281.
Clarke, L., and C. Wall. 1998. “UK construction skills in the context of European developments.” Construct. Manage. Econ. 16 (5): 553–567. https://doi.org/10.1080/014461998372097.
Converse, P. E. 2006. “The nature of belief systems in mass publics.” Crit. Rev. 18 (1): 1–74. https://doi.org/10.1080/08913810608443650.
Dainty, A. R. J., S. G. Ison, and D. S. Root. 2004. “Bridging the skills gap: A regionally driven strategy for resolving the construction labour market crisis.” Eng. Constr. Archit. Manage. 11 (4): 275–283. https://doi.org/10.1108/09699980410547621.
Durdyev, S., and J. Mbachu. 2017. “Key constraints to labour productivity in residential building projects: Evidence from Cambodia.” Int. J. Constr. Manage. 18 (5): 385–393. https://doi.org/10.1080/15623599.2017.1326301.
Durdyev, S., M. Omarov, and S. Ismail. 2017. “Causes of delay in residential construction projects in Cambodia.” Cogent Eng. 4 (1): 1291117. https://doi.org/10.1080/23311916.2017.1291117.
El-Gohary, K. M., and R. F. Aziz. 2014. “Factors influencing construction labor productivity in Egypt.” J. Manage. Eng. 30 (1): 1–9. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000168.
Fang, D., C. Wu, and H. Wu. 2015. “Impact of the supervisor on worker safety behavior in construction projects.” J. Manage. Eng. 31 (6): 04015001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000355.
Forde, C., and R. Mackenzie. 2004. “Cementing skills: Training and labour use in UK construction.” Hum. Resour. Manage. J. 14 (3): 74–88. https://doi.org/10.1111/j.1748-8583.2004.tb00127.x.
Frey, A., L. Balzer, and J. J. Ruppert. 2014. “Transferable competences of young people with a high dropout risk in vocational training in Germany.” Int. J. Educ. Vocational Guidance 14 (1): 119–134. https://doi.org/10.1007/s10775-013-9257-8.
Itani, M., and I. Srour. 2016. “Engineering students’ perceptions of soft skills, industry expectations, and career aspirations.” J. Civ. Eng. Educ. 142 (1): 04015005. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000247.
Jarkas, A. M. 2010. “Critical investigation into the applicability of the learning curve theory to rebar fixing labor productivity.” J. Constr. Eng. Manage. 136 (12): 1279–1288. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000236.
Jeelani, I., A. Albert, R. Azevedo, and E. J. Jaselskis. 2016. “Development and testing of a personalized hazard-recognition training intervention.” J. Constr. Eng. Manage. 143 (5): 51–60. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001256.
Johari, S., and K. N. Jha. 2018. “Development and implementation of on-the-job training system for construction workers.” In Proc., ASCE Conf. on Urbanization Challenges in Emerging Economies: Energy and Water Infrastructure; Transportation Infrastructure; and Planning and Financing, 405–416. Reston, VA: ASCE. https://ascelibrary.org/doi/abs/10.1061/9780784482025.042.
Johari, S., and K. N. Jha. 2020a. “Challenges to attract construction workers towards skill development training.” Eng. Constr. Archit. Manage. 27 (2): 321–340. https://doi.org/10.1108/ECAM-02-2019-0108.
Johari, S., and K. N. Jha. 2020b. “Impact of work-motivation over construction labour productivity.” J. Manage. Eng. 36 (5): 04020052. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000824.
Johari, S., and K. N. Jha. 2020c. “Interrelationship among belief, intention, attitude, behavior, and performance of construction workers.” J. Manage. Eng. 36 (6): 0000851. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000851.
Johari, S., and K. N. Jha. 2020d. “How the aptitude of workers affects construction labor productivity.” J. Manage. Eng. 36 (5): 04020055. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000826.
Judd, C. M., and J. T. Johnson. 1981. “Attitudes, polarization, and diagnosticity: Exploring the effect of affect.” J. Personality Soc. Psychol. 41 (1): 26–36. https://doi.org/10.1037/0022-3514.41.1.26.
Judy, R. W., and C. D’Amico. 1997. Workforce 2020: Work and workers in the 21st century. Indianapolis: Hudson Institute.
Karimi, H., T. R. B. Taylor, G. B. Dadi, P. M. Goodrum, and C. Srinivasan. 2018. “Impact of skilled labor availability on construction project cost performance.” J. Constr. Eng. Manage. 144 (7): 04018057. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001512.
Kaufmann, K., and C. Weaver. 1995. “Appraising relative worth: Continuing-education opportunities for engineers.” J. Manage. Eng. 11 (4): 34–38. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:4(34).
Kazaz, A., E. Manisali, and S. Ulubeyli. 2008. “Effect of basic motivational factors on construction workforce productivity in Turkey.” J. Civ. Eng. Manage. 14 (2): 95–106. https://doi.org/10.3846/1392-3730.2008.14.4.
Kisi, K. P., N. Mani, E. M. Rojas, and E. T. Foster. 2017. “Optimal productivity in labor-intensive construction operations: Pilot study.” J. Constr. Eng. Manage. 143 (3): 04016107. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001257.
Kuprenas, J. A., R. K. Haraga, D. L. DeChambeau, and J. C. Smith. 2000. “Performance measurement of training in engineering organizations.” J. Manage. Eng. 16 (5): 27–33. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:5(27).
Le-Hoai, L., Y. D. Lee, and J. Y. Lee. 2008. “Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries.” KSCE J. Civ. Eng. 12 (6): 367–377. https://doi.org/10.1007/s12205-008-0367-7.
Leung, M. Y., Q. Liang, and J. Yu. 2016. “Development of a mindfulness–stress–performance model for construction workers.” Constr. Manage. Econ. 34 (2): 110–128. https://doi.org/10.1080/01446193.2016.1147652.
Li, H., G. Chan, and M. Skitmore. 2012. “Multiuser virtual safety training system for tower crane dismantlement.” J. Comput. Civ. Eng. 26 (5): 638–647. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000170.
Lieber, R. L. 1990. “Statistical significance and hypothesis testing.” J. Orthop. Res. 8 (2): 304–309. https://doi.org/10.1002/jor.1100080221.
Lobo, Y. B., and S. Wilkinson. 2008. “New approaches to solving the skills shortages in the New Zealand construction industry.” Eng. Constr. Archit. Manage. 15 (1): 42–53. https://doi.org/10.1108/09699980810842052.
Małachowski, B., and P. Korytkowski. 2016. “Competence-based performance model of multi-skilled workers.” Comput. Ind. Eng. 91 (1): 165–177. https://doi.org/10.1016/j.cie.2015.11.018.
Marín, L. S., and C. Roelofs. 2017. “Promoting construction supervisors’ safety-efficacy to improve safety climate: Training intervention trial.” J. Constr. Eng. Manage. 143 (8): 04017037. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001330.
Mumford, M. D., W. A. Baughman, K. V. Threlfall, E. P. Supinski, and D. P. Costanza. 1996. “Process-based measures of creative problem-solving skills: I. Problem construction.” Creativity Res. J. 9 (1): 63–76. https://doi.org/10.1207/s15326934crj0901_6.
Namian, M., A. Albert, C. M. Zuluaga, and E. J. Jaselskis. 2016. “Improving hazard-recognition performance and safety training outcomes: Integrating strategies for training transfer.” J. Constr. Eng. Manage. 142 (10): 04016048. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001160.
Ng, S. T., R. M. Skitmore, K. C. Lam, and A. W. C. Poon. 2004. “Demotivating factors influencing the productivity of civil engineering projects.” Int. J. Project Manage. 22 (2): 139–146. https://doi.org/10.1016/S0263-7863(03)00061-9.
Odusami, K. T. 2002. “Perceptions of construction professionals concerning important skills of effective project leaders.” J. Manage. Eng. 18 (2): 61–67. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:2(61).
Oral, E., and M. Oral. 2010. “Predicting construction crew productivity by using self-organizing maps.” Autom. Constr. 19 (6): 791–797. https://doi.org/10.1016/j.autcon.2010.05.001.
Perloff, R. 2007. The dynamics of persuasion. New York: Routledge.
Royston, P. 2005. “Multiple imputation of missing values: Update of ice.” Stata J. 5 (4): 527–536. https://doi.org/10.1177/1536867X0500500404.
Schaufelberger, J. E. 2000. “Mechanical craft training in western Washington.” In Proc. Construction Congress VI, 244–252. Reston, VA: ASCE.
Sherratt, F. 2018. “Shaping the discourse of worker health in the UK construction industry.” Constr. Manage. Econ. 36 (3): 141–152. https://doi.org/10.1080/01446193.2017.1337916.
Stajkovic, A. D. 2006. “Development of a core confidence-higher order construct.” J. Appl. Psychol. 91 (6): 1208. https://doi.org/10.1037/0021-9010.91.6.1208.
Tabassi, A. A., and A. H. A. Bakar. 2009. “Training, motivation, and performance: The case of human resource management in construction projects in Mashhad, Iran.” Int. J. Project Manage. 27 (5): 471–480. https://doi.org/10.1016/j.ijproman.2008.08.002.
Tabish, S. Z. S., and K. N. Jha. 2012. “Success traits for a construction project” J. Constr. Eng. Manage. 138 (10): 1131–1138. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000538.
Tam, V. W. Y., and I. W. H. Fung. 2012. “Behavior, attitude, and perception toward safety culture from mandatory safety training course.” J. Civ. Eng. Educ. 138 (3): 207–213. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000104.
Tripathi, K. K., and K. N. Jha. 2017a. “An empirical study on performance measurement factors for construction organizations.” KSCE J. Civ. Eng. 22 (4): 1052–1066. https://doi.org/10.1007/s12205-017-1892-z.
Tripathi, K. K., and K. N. Jha. 2017b. “Determining success factors for a construction organization: A structural equation modeling approach.” J. Manage. Eng. 34 (1): 04017050. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000569.
Vereen, S. C., W. Rasdorf, and J. E. Hummer. 2016. “Development and comparative analysis of construction industry labor productivity metrics.” J. Constr. Eng. Manage. 142 (7): 04016020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001112.
Wang, Y., P. M. Goodrum, C. T. Haas, and R. W. Glover. 2008. “Craft training issues in American industrial and commercial construction.” J. Constr. Eng. Manage. 134 (10): 795–803. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(795).
Yi, W., and A. P. C. Chan. 2013. “Critical review of labor productivity research in construction journals.” J. Manage. Eng. 30 (2): 214–225. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000194.
Zenger, J., and J. Folkman. 2016. “What great listeners actually do.” Accessed February 5, 2020. https://hbr.org/2016/07/what-great-listeners-actually-do.
Zheng, W., J. Yin, H. Shi, and G. Skelton. 2016. “Prompted self-regulated learning assessment and its effect for achieving ASCE vision 2025.” J. Civ. Eng. Educ. 143 (2): 1–10. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000308.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 147Issue 5May 2021

History

Received: Apr 8, 2020
Accepted: Nov 30, 2020
Published online: Mar 8, 2021
Published in print: May 1, 2021
Discussion open until: Aug 8, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

Research Scholar, Dept. of Civil Engineering, Indian Institute of Technology Delhi, New Delhi 110016, India (corresponding author). ORCID: https://orcid.org/0000-0002-1396-0188. Email: [email protected]
Kumar Neeraj Jha, Ph.D. [email protected]
Professor, Dept. of Civil Engineering, Indian Institute of Technology Delhi, New Delhi 110016, India. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share