Abstract

Given the complexity of overseas infrastructure projects (OIPs), difficulty in managing country-related risks commonly causes cost overruns. Thus, there is a pressing need for proactively predicting the impact of country-related risks to enable reasonable decision making in the early proposal stage. Different from the previous studies that heavily relied on a large number of sample points, this research proposes a case-based reasoning (CBR) method capable of reliably predicting the impact of country-related risks on cost overruns for OIPs from a small size of sample points. Grey relational analysis (GRA) is applied twice to address the challenges associated with many variables. Finally, a case study is conducted to validate the reliability of the proposed method. Importantly, this research includes a structured process to develop CBR methods for prediction tailored to different construction companies, hence increasing the adaptability.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data analyzed during the study were provided by a third party. Requests for data should be directed to the provider indicated in the Acknowledgments. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.

Acknowledgments

The authors express their sincere gratitude to China International Contractors Association for assistance in conducting group discussions and questionnaire surveys. They also appreciate the project managers from China Civil Engineering Construction Corporation for valuable and useful data and information.

References

Ashley, D. B., and J. J. Bonner. 1987. “Political risks in international construction.” J. Constr. Eng. Manage. 113 (3): 447–467. https://doi.org/10.1061/(ASCE)0733-9364(1987)113:3(447).
Baloi, D., and A. D. F. Price. 2003. “Modelling global risk factors affecting construction cost performance.” Int. J. Project Manage. 21 (4): 261–269. https://doi.org/10.1016/S0263-7863(02)00017-0.
Baudrit, C., F. Taillandier, T. T. P. Tran, and D. Breysse. 2019. “Uncertainty processing and risk monitoring in construction projects using hierarchical probabilistic relational models.” Comput.-Aided Civ. Infrastruct. Eng. 34 (2): 97–115. https://doi.org/10.1111/mice.12391.
Bilgin, G., I. Dikmen, and M. T. Birgonul. 2018. “An ontology-based approach for delay analysis in construction.” KSCE J. Civ. Eng. 22 (2): 384–398. https://doi.org/10.1007/s12205-017-0651-5.
Bu-Qammaz, A. S., I. Dikmen, and M. T. Birgonul. 2009. “Risk assessment of international construction projects using the analytic network process.” Can. J. Civ. Eng. 36 (7): 1170–1181. https://doi.org/10.1139/L09-061.
Chan, E. H. W., and R. Y. C. Tse. 2003. “Cultural considerations in international construction contracts.” J. Constr. Eng. Manage. 129 (4): 375–381. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(375).
Chua, D. K. H., Y. Wang, and W. T. Tan. 2003. “Impacts of obstacles in East Asian cross-border construction.” J. Constr. Eng. Manage. 129 (2): 131–141. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:2(131).
Chuang, C. L. 2013. “Application of hybrid case-based reasoning for enhanced performance in bankruptcy prediction.” Inf. Sci. 236 (Jul): 174–185. https://doi.org/10.1016/j.ins.2013.02.015.
Dikmen, I., and M. T. Birgonul. 2006. “An analytic hierarchy process based model for risk and opportunity assessment of international construction projects.” Can. J. Civ. Eng. 33 (1): 58–68. https://doi.org/10.1139/l05-087.
Dikmen, I., M. T. Birgonul, C. Anac, J. H. M. Tah, and G. Aouad. 2008. “Learning from risks: A tool for post-project risk assessment.” Autom. Constr. 18 (1): 42–50. https://doi.org/10.1016/j.autcon.2008.04.008.
Dikmen, I., M. T. Birgonul, and A. K. Gur. 2007a. “A case-based decision support tool for bid mark-up estimation of international construction projects.” Autom. Constr. 17 (1): 30–44. https://doi.org/10.1016/j.autcon.2007.02.009.
Dikmen, I., M. T. Birgonul, and S. Han. 2007b. “Using fuzzy risk assessment to rate cost overrun risk in international construction projects.” Int. J. Project Manage. 25 (5): 494–505. https://doi.org/10.1016/j.ijproman.2006.12.002.
Dikmen, I., C. Budayan, M. Talat Birgonul, and E. Hayat. 2018. “Effects of risk attitude and controllability assumption on risk ratings: Observational study on international construction project risk assessment.” J. Manage. Eng. 34 (6): 04018037. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000643.
El-Sayegh, S. M. 2008. “Risk assessment and allocation in the UAE construction industry.” Int. J. Project Manage. 26 (4): 431–438. https://doi.org/10.1016/j.ijproman.2007.07.004.
Eybpoosh, M., I. Dikmen, and M. Talat Birgonul. 2011. “Identification of risk paths in international construction projects using structural equation modeling.” J. Constr. Eng. Manage. 137 (12): 1164–1175. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000382.
Fang, C., and F. Marle. 2012. “A simulation-based risk network model for decision support in project risk management.” Decis. Support Syst. 52 (3): 635–644. https://doi.org/10.1016/j.dss.2011.10.021.
Fidan, G., I. Dikmen, A. M. Tanyer, and M. T. Birgonul. 2011. “Ontology for relating risk and vulnerability to cost overrun in international projects.” J. Comput. Civ. Eng. 25 (4): 302–315. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000090.
Flyvbjerg, B. 2014. “What you should know about megaprojects and why: An overview.” Project Manage. J. 45 (2): 6–19. https://doi.org/10.1002/pmj.21409.
German Watch. 2019. “Global climate risk index.” Accessed March 13, 2019. https://germanwatch.org/en/cri.
Global Economy. 2019a. “Political stability—Country rankings.” Accessed March 13, 2019. http://www.theglobaleconomy.com/rankings/wb_political_stability/.
Global Economy. 2019b. “Trade freedom—Country rankings.” Accessed March 13, 2019. https://www.theglobaleconomy.com/rankings/herit_trade_freedom/.
Goh, Y. M., and D. K. H. Chua. 2009. “Case-based reasoning for construction hazard identification: Case representation and retrieval.” J. Constr. Eng. Manage. 135 (11): 1181–1189. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000093.
Goh, Y. M., and B. H. W. Guo. 2018. “FPSWizard: A web-based CBR-RBR system for supporting the design of active fall protection systems.” Autom. Constr. 85 (Jan): 40–50. https://doi.org/10.1016/j.autcon.2017.09.020.
Gundes, S., and G. Aydogan. 2016. “Bibliometric analysis of research in international construction.” Can. J. Civ. Eng. 43 (4): 304–311. https://doi.org/10.1139/cjce-2015-0127.
Gunhan, S., and D. Arditi. 2005. “Factors affecting international construction.” J. Constr. Eng. Manage. 131 (3): 273–282. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(273).
Han, S. H., and J. E. Diekmann. 2001. “Making a risk-based bid decision for overseas construction projects.” Constr. Manage. Econ. 19 (8): 765–776. https://doi.org/10.1080/01446190110072860.
Han, S. H., D. Y. Kim, and H. Kim. 2007. “Predicting profit performance for selecting candidate international construction projects.” J. Constr. Eng. Manage. 133 (6): 425–436. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:6(425).
Hastak, M., and A. Shaked. 2000. “ICRAM-1: Model for international construction risk assessment.” J. Manage. Eng. 16 (1): 59–69. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:1(59).
Hu, X., B. Xia, M. Skitmore, and Q. Chen. 2016. “The application of case-based reasoning in construction management research: An overview.” Autom. Constr. 72 (Dec): 65–74. https://doi.org/10.1016/j.autcon.2016.08.023.
Hyung, W. G., S. Kim, and J. K. Jo. 2020. “Improved similarity measure in case-based reasoning: A case study of construction cost estimation.” Eng. Constr. Archit. Manage. 27 (2): 561–578. https://doi.org/10.1108/ECAM-01-2019-0035.
Jin, R., S. Han, C. Hyun, and Y. Cha. 2016. “Application of case-based reasoning for estimating preliminary duration of building projects.” J. Constr. Eng. Manage. 142 (2): 04015082. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001072.
Ju-Long, D. 1982. “Control problems of grey systems.” Syst. Control Lett. 1 (5): 288–294. https://doi.org/10.1016/S0167-6911(82)80025-X.
Kapila, P., and C. Hendrickson. 2001. “Exchange rate risk management in international construction ventures.” J. Manage. Eng. 17 (4): 186–191. https://doi.org/10.1061/(ASCE)0742-597X(2001)17:4(186).
Kim, D. Y., S. H. Han, H. Kim, and H. Park. 2009. “Structuring the prediction model of project performance for international construction projects: A comparative analysis.” Expert Syst. Appl. 36 (2): 1961–1971. https://doi.org/10.1016/j.eswa.2007.12.048.
Lee, K. P., H. S. Lee, M. Park, D. Y. Kim, and M. Jung. 2017. “Management-reserve estimation for international construction projects based on risk-informed k-NN.” J. Manage. Eng. 33 (4): 04017002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000510.
Lesniak, A., and K. Zima. 2018. “Cost calculation of construction projects including sustainability factors using the case-based reasoning (CBR) method.” Sustainability 10 (5): 14. https://doi.org/10.3390/su10051608.
Ling, F. Y. Y., and L. Hoi. 2006. “Risks faced by Singapore firms when undertaking construction projects in India.” Int. J. Project Manage. 24 (3): 261–270. https://doi.org/10.1016/j.ijproman.2005.11.003.
Liu, J. Y., X. B. Zhao, and P. Yan. 2016. “Risk paths in international construction projects: Case study from Chinese contractors.” J. Constr. Eng. Manage. 142 (6): 05016002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001116.
Luo, L., Q. He, E. J. Jaselskis, and J. Xie. 2017. “Construction project complexity: Research trends and implications.” J. Constr. Eng. Manage. 143 (7): 04017019. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001306.
Ozorhon, B., I. Dikmen, and M. T. Birgonul. 2006. “Case-based reasoning model for international market selection.” J. Constr. Eng. Manage. 132 (9): 940–948. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:9(940).
Pereira, E., S. Han, and S. AbouRizk. 2018a. “Integrating case-based reasoning and simulation modeling for testing strategies to control safety performance.” J. Comput. Civ. Eng. 32 (6): 04018047. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000792.
Pereira, E., U. Hermann, S. Han, and S. AbouRizk. 2018b. “Case-based reasoning approach for assessing safety performance using safety-related measures.” J. Constr. Eng. Manage. 144 (9): 04018088. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001546.
PMI (Project Management Institute). 2017. A guide to the project management body of knowledge. 6th ed. Newtown Square, PA: PMI.
Qi, J., J. Hu, and Y. H. Peng. 2016. “Hybrid weighted mean for CBR adaptation in mechanical design by exploring effective, correlative and adaptative values.” Comput. Ind. 75 (Jan): 58–66. https://doi.org/10.1016/j.compind.2015.06.007.
Sambasivan, M., and Y. W. Soon. 2007. “Causes and effects of delays in Malaysian construction industry.” Int. J. Project Manage. 25 (5): 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007.
Senouci, A., A. Ismail, and N. Eldin. 2016. “Time delay and cost overrun in Qatari public construction projects.” Procedia Eng. 164 (2016): 368–375. https://doi.org/10.1016/j.proeng.2016.11.632.
Su, Y. K., S. J. Yang, K. N. Liu, K. C. Hua, and Q. Yao. 2019. “Developing a case-based reasoning model for safety accident pre-control and decision making in the construction industry.” Int. J. Environ. Res. Public Health 16 (9): 1511. https://doi.org/10.3390/ijerph16091511.
Transparency International. 2019. “Corruption perceptions index.” Accessed March 13, 2019. http://www.transparency.org/research/cpi/overview.
Vision of Humanity. 2019a. “Global peace index.” Accessed March 13, 2019. http://visionofhumanity.org/indexes/global-peace-index/.
Vision of Humanity. 2019b. “Global peace index—Perceptions of criminality.” Accessed March 13, 2019. http://visionofhumanity.org/indexes/global-peace-index/.
Viswanathan, S. K., and K. N. Jha. 2019. “Factors influencing international market selection for Indian construction firms.” J. Manage. Eng. 35 (5): 05019006. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000703.
Wang, J., L. Shen, Y. Ren, J. J. Ochoa, Z. Guo, H. Yan, and Z. Wu. 2019. “A lessons mining system for searching references to support decision making towards sustainable urbanization.” J. Cleaner Prod. 209 (Feb): 451–460. https://doi.org/10.1016/j.jclepro.2018.10.244.
Wang, S. Q., R. L. K. Tiong, S. K. Ting, and D. Ashley. 1999. “Political risks: Analysis of key contract clauses in China’s BOT project.” J. Constr. Eng. Manage. 125 (3): 190–197. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(190).
Wang, X., L. Wang, L. Zhang, X. Xu, W. Zhang, and Y. Xu. 2017. “Developing an employee turnover risk evaluation model using case-based reasoning.” Inf. Syst. Front. 19 (3): 569–576. https://doi.org/10.1007/s10796-015-9615-9.
World Bank. 2019a. “GNI per capita growth (annual %).” Accessed March 13, 2019. https://data.worldbank.org/indicator/NY.GNP.PCAP.KD.ZG.
World Bank. 2019b. “Inflation, GDP deflator (annual %).” Accessed March 13, 2019. https://data.worldbank.org/indicator/NY.GDP.DEFL.KD.ZG.
World Bank. 2019c. “International logistics performance index—Infrastructure.” Accessed March 13, 2019. https://lpi.worldbank.org/international/global.
World Bank. 2019d. “International logistics performance index—LPI score.” Accessed March 13, 2019. https://lpi.worldbank.org/international/global.
World Bank. 2019e. “Labor force, total.” Accessed March 13, 2019. https://data.worldbank.org/indicator/SL.TLF.TOTL.IN.
World Bank. 2019f. “Real effective exchange rate index (2010 = 100).” Accessed March 13, 2019. https://data.worldbank.org/indicator/PX.REX.REER.
World Bank. 2019g. “Total alcohol consumption per capita (liters of pure alcohol, projected estimates, 15+ years of age).” Accessed March 13, 2019. https://data.worldbank.org/indicator/SH.ALC.PCAP.LI.
World Trade Organization. 2019. “Regional trade agreements: Database.” Accessed March 13, 2019. http://rtais.wto.org/UI/PublicMaintainRTAHome.aspx.
Yildiz, A. E., I. Dikmen, M. T. Birgonul, K. Ercoskun, and S. Alten. 2014. “A knowledge-based risk mapping tool for cost estimation of international construction projects.” Autom. Constr. 43 (Jul): 144–155. https://doi.org/10.1016/j.autcon.2014.03.010.
Yu, F., X. Y. Li, and X. S. Han. 2018. “Risk response for urban water supply network using case-based reasoning during a natural disaster.” Saf. Sci. 106 (Jul): 121–139. https://doi.org/10.1016/j.ssci.2018.03.003.
Zhang, B. S., X. Y. Li, and S. Y. Wang. 2015. “A novel case adaptation method based on an improved integrated genetic algorithm for power grid wind disaster emergencies.” Expert Syst. Appl. 42 (21): 7812–7824. https://doi.org/10.1016/j.eswa.2015.05.042.
Zhi, H. 1995. “Risk management for overseas construction projects.” Int. J. Project Manage. 13 (4): 231–237. https://doi.org/10.1016/0263-7863(95)00015-I.
Zhu, F., H. Hu, F. Xu, and N. Tang. 2019. “Predicting profit performance of international construction projects.” In Proc., 2019 IEEE Int. Conf. on Industrial Engineering and Engineering Management (IEEM), 445–449. New York: IEEE. https://doi.org/10.1109/ieem44572.2019.8978561.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 147Issue 2February 2021

History

Received: Jan 29, 2020
Accepted: Jul 30, 2020
Published online: Nov 28, 2020
Published in print: Feb 1, 2021
Discussion open until: Apr 28, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Candidate, Dept. of Civil Engineering, School of Naval Architecture, Ocean and Civil Engineering and State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong Univ., 800 Dongchuan Rd., Shanghai 200240, PR China. ORCID: https://orcid.org/0000-0003-0732-4633. Email: [email protected]
Professor, Dept. of Transportation Engineering, School of Naval Architecture, Ocean and Civil Engineering and State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong Univ., 800 Dongchuan Rd., Shanghai 200240, PR China (corresponding author). ORCID: https://orcid.org/0000-0002-1103-0243. Email: [email protected]
Senior Engineer, Dept. of Civil Engineering, School of Naval Architecture, Ocean and Civil Engineering and State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong Univ., 800 Dongchuan Rd., Shanghai 200240, PR China. ORCID: https://orcid.org/0000-0001-9704-5528. Email: [email protected]
Ph.D. Candidate, Dept. of Civil Engineering, School of Naval Architecture, Ocean and Civil Engineering and State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong Univ., 800 Dongchuan Rd., Shanghai 200240, PR China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share