Technical Papers
Jun 22, 2020

Attaining Successful Construction Project Execution Through Personnel and Communication

Publication: Journal of Construction Engineering and Management
Volume 146, Issue 9

Abstract

Prior research has disagreed on the definition of construction project success and the best way to achieve it. Additionally, there is very little research that takes a practitioner’s viewpoint and provides findings useful to project managers in their day-to-day dealings. To fill this gap, the following research was conducted to determine the social mechanisms used by project managers and project teams to achieve success. The research includes an in-depth literature review, along with a two-part qualitative study consisting of thirty semistructured interviews with current or former construction project managers. Focusing on project personnel and communication as the key ingredients, a model of antecedents and causal social mechanisms is developed. The constructs, or antecedents, to personnel are planning, choosing, and retaining. The constructs, or antecedents, to communication are frequency, understanding, and inclusivity. The causal social mechanisms that lead from the antecedents to success are described in detail and benefit practitioners because they provide both the novice and the experienced construction project manager with insights into the “how” and not just the “what” of previously identified critical success factors.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and code generated or used during the study appear in the submitted article.

Acknowledgments

The authors would like to thank all of the staff, faculty, and students in Temple University’s Executive Doctorate of Business Administration program, especially the 2019 cohort.

References

Ancona, D., and D. Caldwell. 1992. “Bridging the boundary: External activity and performance in organizational teams.” Administrative Sci. Q. 37 (4): 634–665. https://doi.org/10.2307/2393475.
Badir, Y., B. Buchel, and C. Tucci. 2012. “A conceptual framework of the impact of NPD project team and leader empowerment on communication and performance: An alliance case context.” Int. J. Project Manage. 30 (8): 914–926. https://doi.org/10.1016/j.ijproman.2012.01.013.
Barnes, M. 1988. “Construction project management.” Int. J. Project Manage. 6 (2): 69–79. https://doi.org/10.1016/0263-7863(88)90028-2.
Baykasoglu, A., T. Dereli, and S. Das. 2007. “Project team selection using fuzzy optimization approach.” Cybern. Syst. Int. J. 38 (2): 155–185. https://doi.org/10.1080/01969720601139041.
Blomquist, T., M. Hallgren, A. Nilsson, and A. Soderholm. 2010. “Project-as-practice: In search of project management research that matters.” Project Manage. J. 41 (1): 5–16. https://doi.org/10.1002/pmj.20141.
Brandenburg, S., C. Haas, and K. Byrom. 2006. “Strategic management of human resources in construction.” J. Manage. Eng. 22 (2): 89–96. https://doi.org/10.1061/(ASCE)0742-597X(2006)22:2(89).
Briere, S., D. Proulx, O. N. Flores, and M. Laporte. 2015. “Competencies of project managers in international NGOs: Perception of practitioners.” Int. J. Project Manage. 33 (1): 116–125. https://doi.org/10.1016/j.ijproman.2014.04.010.
Bryde, D., and L. Robinson. 2005. “Client versus contractor perspectives on project success criteria.” Int. J. Project Manage. 23 (8): 622–629. https://doi.org/10.1016/j.ijproman.2005.05.003.
Cheung, S., T. S. T. Ng, S. P. Wong, and H. C. H. Suen. 2003. “Behavioral aspects in construction partnering.” Int. J. Proj. Manage. 21: 333–343.
Chua, D. K. H., Y. C. Kog, and P. K. Loh. 1999. “Critical success factors for different project objectives.” J. Constr. Eng. Manage. 125 (3): 142–150. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(142).
Cicmil, S. 2006. “Understanding project management practice through interpretative and critical research perspectives.” Project Manage. J. 37 (2): 27–37. https://doi.org/10.1177/875697280603700204.
Coleman, J. 1986. “Social theory, social research, and a theory of action.” Am. J. Sociol. 91 (6): 1309–1335. https://doi.org/10.1086/228423.
De Dreu, C., and M. West. 2001. “Minority dissent and team innovation: The importance of participation in decision making.” J. Appl. Psychol. 86 (6): 1191–1201. https://doi.org/10.1037/0021-9010.86.6.1191.
De Wit, A. 1988. “Measurement of project success.” Project Manage. J. 6 (3): 164–170. https://doi.org/10.1016/0263-7863(88)90043-9.
Doloi, H. 2009. “Relational partnerships: The importance of communication, trust and confidence and joint risk management in achieving project success.” Constr. Manage. Econ. 27 (11): 1099–1109. https://doi.org/10.1080/01446190903286564.
Frimpong, Y., J. Oluwoye, and L. Crawford. 2003. “Causes of delay and cost overruns in construction of groundwater projects in a developing countries: Ghana as a case study.” Int. J. Project Manage. 21 (5): 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8.
Gaddis, P. 1959. “The project manager.” Harvard Bus. Rev. 89–97.
Gardner, I. 2015. Achieving successful construction projects: A guide for industry leaders and programme managers. New York: Routledge.
Gross, N. 2009. “A pragmatist theory of social mechanisms.” Am. Sociol. Rev. 74 (3): 358–379. https://doi.org/10.1177/000312240907400302.
Halman, J., and B. Braks. 1999. “Project alliancing in the offshore industry.” Int. J. Project Manage. 17 (2): 71–76. https://doi.org/10.1016/S0263-7863(98)00002-7.
Hartwick, J., and H. Barki. 2001. “Communication as a dimension of user participation.” IEEE Trans. Prof. Commun. 44 (1): 21–36. https://doi.org/10.1109/47.911130.
Hedstrom, P., and R. Swedberg, eds. 1998. Social mechanisms: An analytical approach to social theory. 1st ed. Cambridge, UK: Cambridge University Press.
Hodgson, D., and S. Cicmil, eds. 2006. Making project critical. New York: Palgrave Macmillan.
Hsu, S., K. Weng, Q. Cui, and W. Rand. 2016. “Understanding the complexity of project team member selection through agent-based modeling.” Int. J. Project Manage. 34 (1): 82–93. https://doi.org/10.1016/j.ijproman.2015.10.001.
Hunter, J. E., F. L. Schmidt, and M. K. Judiesch. 1990. “Individual differences in output variability as a function of job complexity.” J. Appl. Psychol. 75 (1): 28–42. https://doi.org/10.1037/0021-9010.75.1.28.
Iram, N., B. Khan, and A. W. Sherani. 2016. “Critical factors influencing the project success: An analysis of projects in manufacturing and construction in Pakistan.” Arabian J. Bus. Manage. Rev. 6 (2): 20–25.
Iyer, K. C., and K. N. Jha. 2005. “Factors affecting cost performance: Evidence from Indian construction projects.” Int. J. Project Manage. 23 (4): 283–295. https://doi.org/10.1016/j.ijproman.2004.10.003.
Katz, R., and M. Tushman. 1981. “An investigation into the managerial roles and career paths of gatekeepers and project supervisors in a major R&D facility.” R&D Manage. 11 (3): 103–110. https://doi.org/10.1111/j.1467-9310.1981.tb00458.x.
Kog, Y. C., D. K. H. Chua, P. K. Loh, and E. J. Jaselskis. 1999. “Key determinants of construction schedule performance.” Int. J. Project Manage. 17 (6): 351–359. https://doi.org/10.1016/S0263-7863(98)00058-1.
Latour, B. 1987. Science in action. Cambridge, MA: Harvard University Press.
Mathieu, J., T. Heffner, G. Goodwin, E. Salas, and J. Cannon-Bowers. 2000. “The influence of shared mental models on team process and performance.” J. Appl. Psychol. 85 (2): 273–283. https://doi.org/10.1037/0021-9010.85.2.273.
Mutingi, M., and C. Mbohwa. 2012. “Fuzzy system dynamics and optimization with application to manpower systems.” Int. J. Indust. Eng. Comput. 3 (5): 873–886. https://doi.org/10.5267/j.ijiec.2012.05.004.
Packendorff, J. 1995. “Inquiring into the temporary organization: New directions for project management research.” Scand. J. Manage. 11 (4): 319–333. https://doi.org/10.1016/0956-5221(95)00018-Q.
Pinto, J., and O. P. Kharbanda. 1995. Successful project managers: Leading your team to success. New York: Van Nostrand Reinhold.
Pinto, J., and D. Slevin. 1987. “Critical factors in successful project implementation.” IEEE Trans. Eng. Manage. EM-34 (1): 22–27. https://doi.org/10.1109/TEM.1987.6498856.
Pinto, M. B., and J. Pinto. 1990. “Project team communication and cross-functional cooperation in new program development.” J. Prod. Innovation Manage. 7 (3): 200–212. https://doi.org/10.1111/1540-5885.730200.
PMI (Project Management Institute). 2017. PMI 2017 pulse of the profession: Project success rates climb, fewer dollars wasted. Accessed February 19, 2019. https://www.pmi.org/about/press-media/press-releases/pmi-2017-pulse-of-the-profession.
Sanvido, V., F. Grobler, K. Parfitt, M. Guvenis, and M. Coyle. 1992. “Critical success factors for construction projects.” J. Constr. Eng. Manage. 118 (1): 94–111. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(94).
Schuster, R. 1987. “Manpower planning for construction administration.” J. Manage. Eng. 3 (3): 201–206. https://doi.org/10.1061/(ASCE)9742-597X(1987)3:3(201).
Sing, M., P. Love, D. Edwards, and J. Liu. 2016. “Dynamic modeling of workforce planning for infrastructure projects.” J. Manage. Eng. 32 (6): 04016019. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000463.
Soderlund, J. 2004. “Building theories of project management: Past research, questions for the future.” Int. J. Project Manage. 22 (3): 183–191. https://doi.org/10.1016/S0263-7863(03)00070-X.
Soderlund, J. 2015. “Innovative approaches in project management research.” Int. J. Project Manage. 2 (33): 251–253.
Solow, D., G. Vairaktarakis, S. K. Piderit, and M. Tsai. 2002. “Managerial insights into the effects of interactions on replacing members of a team.” Manage. Sci. 48 (8): 1060–1073. https://doi.org/10.1287/mnsc.48.8.1060.164.
Sommerville, J., and S. Dalziel. 1998. “Project teambuilding—The applicability of Belbin’s team-role self-perception inventory.” Int. J. Project Manage. 16 (3): 165–171. https://doi.org/10.1016/S0263-7863(97)00054-9.
US Census Bureau. 2019. “Monthly construction spending.” Accessed February 19, 2019. https://www.census.gov/construction/c30/pdf/release.pdf.
van der Hoorn, B. 2016. “Discussing project status with the project-space model: An action research study.” Int. J. Project Manage. 34 (8): 1638–1657. https://doi.org/10.1016/j.ijproman.2016.09.001.
Williams, T. 2015. “Identifying success factors in construction projects: A case study.” Project Manage. J. 47 (1): 97–112. https://doi.org/10.1002/pmj.21558.
Williams, T., O. J. Klakegg, D. Walker, B. Andersen, and O. M. Magnussen. 2012. “Identifying and acting on early warning signs in complex projects.” Project Manage. J. 43 (2): 37–53. https://doi.org/10.1002/pmj.21259.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 146Issue 9September 2020

History

Received: Aug 16, 2019
Accepted: Mar 23, 2020
Published online: Jun 22, 2020
Published in print: Sep 1, 2020
Discussion open until: Nov 22, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

President, Dagda Corp., Hellertown, PA 18055 (corresponding author). ORCID: https://orcid.org/0000-0001-6142-4542. Email: [email protected]
Mark Gershon, Ph.D. [email protected]
Department Head, Marketing and Supply Chain Management, Temple Univ., Philadelphia, PA 19122. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share