Abstract

Studies that have measured construction productivity, analyzed its influencing parameters, and explored enhancement strategies abound in the literature. However, few have quantified the relationship between the total factor productivity (TFP) of the construction industry and its parameters, nor have they provided quantitative evidence supporting the formulation and implementation of construction productivity enhancement strategies (CPES). This paper demonstrates a novel mixed-methods design that develops a systemic framework of construction TFP enhancement. The study measured the TFP of the construction industry, examined the systemic nature of its influencing parameters, explored its relationship with these parameters, and identified the dynamic nature of construction productivity enhancement measures and strategies. The developed research methods were validated and contextualized within the context of the Hong Kong construction industry which faces significant issues such as labor shortage, aging workforce, and high construction costs that beg for urgent productivity improvement. Applying the proposed methods to the Hong Kong construction industry, 15 measures and 4 strategies were identified and formulated, these strategies being to formulate a strategic plan, encourage technological innovation, build a sustainable construction workforce, and improve effective construction management. The measures and strategies form a diamond-shaped framework for systemic construction industry TFP enhancement. The measures under each strategy were illustrated by a causal loop diagram in the framework, indicating that the strategies should be adopted systematically for maximized synergies. The study contributes to the literature with its novel mixed-methods design that provides measurable evidence for developing a systemic construction TFP enhancement framework that supports industry stakeholders in effectively formulating and implementing the CPES.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code generated or used during the study are available from the corresponding author by request. For more information about ASCE’s Data Availability policy: https://ascelibrary.org/page/dataavailability.

References

Abbott, M., and C. Carson. 2012. “A review of productivity analysis of the New Zealand construction industry.” Aust. J. Constr. Econ. Build. 12 (3): 1–15. https://doi.org/10.5130/ajceb.v12i3.2584.
Borg, L., and H. S. Song. 2015. “Quality change and implications for productivity development: housing construction in Sweden 1990–2010.” J. Constr. Eng. Manage. 141 (1): 05014014. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000928.
Bulman, T., and J. Simon. 2003. Productivity and inflation. Sydney, Australia: Reserve Bank of Australia.
Chan, J. K. W., C. M. Tam, and R. K. C. Cheung. 2005. “Construction firms at the crossroads in Hong Kong: Going insolvency or seeking opportunity.” Eng. Constr. Archit. Manage. 12 (2): 111–124. https://doi.org/10.1108/09699980510584476.
Chau, K. W., S. W. Poon, Y. S. Wang, and L. L. Lu. 2005. “Technological progress and the productive efficiency of construction firms in Hong Kong, 1981–2001.” J. Constr. Res. 6 (2): 195–207. https://doi.org/10.1142/S1609945105000390.
Chau, K. W., and Y. S. Wang. 2005. “An analysis of productivity growth in the construction industry: A non-parametric approach.” Assoc. Res. Constr. Manage. 1 (Sep): 159–169.
CIDB (Construction Industry Development Board of Malaysia). 2016. Construction Industry Transformation Programme 2016-2020. Kuala Lumpur, Malaysia: CIDB.
CIDB (Construction Industry Development Board of Singapore). 1992. Raising Singapore’s construction productivity: CIDB construction productivity taskforce report 1992. Singapore: CIDB.
CIRC (Construction Industry Review Committee). 2001. Construct for excellence: Report of the construction industry review committee. Hong Kong: CIRC.
CSD (Census Statistics Department). 2014. Gross domestic product 2013. Hong Kong: CSD.
CSD (Census Statistics Department). 2015. Quarterly report of employment and vacancies at construction sites. Hong Kong: CSD.
CSD (Census Statistics Department). 2016. Table 116: Selected statistics for all establishments in the industry section of construction. Hong Kong: CSD.
CSD (Census Statistics Department). 2016a. Tables 009: Unemployment rate by previous industry. Hong Kong: CSD.
CSD (Census Statistics Department). 2016b. Tables 052: Consumer price indices. Hong Kong: CSD.
Danninger, S., and J. Mincer. 2000. “Technology, unemployment, and inflation.” Vol. 19 of Research in Labor Economics, 1–28. Bingley: Emerald Group Publishing. https://doi.org/10.1016/S0147-9121(00)19002-8.
El-Gohary, K. M., and R. F. Aziz. 2014. “Factors influencing construction labor productivity in Egypt.” J. Manage. Eng. 30 (1): 1–9. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000168.
Farmer, M. 2016. The farmer review of the UK construction labour model. London, UK: Construction Leadership Council.
Fellows, R. F., D. Langford, R. Newcombe, and S. Urry. 2009. Construction management in practice. New York: Wiley.
Froese, T. M. 2010. “The impact of emerging information technology on project management for construction.” Autom. Constr. 19 (5): 531–538. https://doi.org/10.1016/j.autcon.2009.11.004.
FSTB (Financial Services and the Treasury Bureau). 2003. 2003 economic background. Hong Kong: FSTB.
Ganesan, S. 1984. “Construction productivity” Habitat Int. 8 (3): 29–42. https://doi.org/10.1016/0197-3975(84)90041-9.
Goh, E., and M. Loosemore. 2017. “The impacts of industrialization on construction subcontractors: A resource based view.” Constr. Manage. Econ. 35 (5): 288–304. https://doi.org/10.1080/01446193.2016.1253856.
Goodrum, P. M., and C. T. Haas. 2004. “Long-term impact of equipment technology on labor productivity in the U.S. construction industry at the activity level.” J. Constr. Eng. Manage. 130 (1): 124–133. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(124).
Goodrum, P. M., C. T. Haas, C. Caldas, D. Zhai, J. Yeiser, and D. Homm. 2010. “Model to predict the impact of a technology on construction productivity.” J. Constr. Eng. Manage. 137 (9): 678–688. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000328.
Goodrum, P. M., D. Zhai, and M. F. Yasin. 2009. “Relationship between changes in material technology and construction productivity.” J. Constr. Eng. Manage. 135 (4): 278–287. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:4(278).
Green, B. 2016. Productivity in construction: Creating a framework for the industry to thrive. Berkshire, UK: Chartered Institute of Building.
Grubbström, R. W. 1995. “Modelling production opportunities: A historical overview.” Int. J. Prod. Econ. 41 (1–3): 1–14. https://doi.org/10.1016/0925-5273(95)00109-3.
HKTDC (Hong Kong Trade Development Council). 2015. Building and construction industry in Hong Kong. Hong Kong: HKTDC.
Hwang, B., L. Zhu, J. Tan, and T. Ming. 2017. “Factors affecting productivity in green building construction projects: The case of Singapore.” J. Manage. Eng. 33 (3): 04016052. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000499.
Jarkas, A. M., and C. G. Bitar. 2012. “Factors affecting construction labour productivity in Kuwait.” J. Constr. Eng. Manage. 138 (7): 811–820. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000501.
Jarkas, A. M., and M. Radosavljevic. 2013. “Motivational factors impacting the productivity of construction master craftsmen in Kuwait.” J. Manage. Eng. 29 (4): 446–454. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000160.
Javed, A. A., W. Pan, L. Chen, and W. Zhan. 2018. “A systemic exploration of drivers for and constraints on construction productivity enhancement.” Built Environ. Project Asset Manage. 8 (Jul): 239–252. https://doi.org/10.1108/BEPAM-10-2017-0099.
Jorgenson, D., F. M. Gollop, and B. Fraumeni. 1987. Productivity and U.S. economic growth. Cambridge, MA: Harvard University Press.
Karimi, H., T. R. B. Taylor, and P. M. Goodrum. 2017. “Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance.” Constr. Manage. Econ. 35 (6): 368–380. https://doi.org/10.1080/01446193.2017.1294257.
Khreisat, M. A. 2011. Production function estimations and policy implications. Fort Collins, CO: Colorado State Univ.
Koskela, L. 2000. An exploration towards a production theory and its application to construction. Finland: VTT Publications.
MGI (McKinsey Global Insititute). 2017. Reinventing construction: A route to higher productivity. MGI.
Mok, K. Y., G. Q. Shen, R. J. Yang, and C. Z. Li. 2017. “Investigating key challenges in major public engineering projects by a network-theory based analysis of stakeholder concerns: A case study.” Int. J. Project Manage. 35 (1): 78–94. https://doi.org/10.1016/j.ijproman.2016.10.017.
Naoum, S. 2015. “Productivity in construction projects.” In Design economics for the built environment: Impact of sustainability on project evaluation, 93–106. Hoboken, NJ: Wiley-Blackwell.
Ng, S. T., R. M. Skitmore, K. C. Lam, and A. W. C. Poon. 2004. “Demotivating factors influencing the productivity of civil engineering projects.” Int. J. Project Manage. 22 (2): 139–146. https://doi.org/10.1016/S0263-7863(03)00061-9.
NZIER (New Zealand Institute of Economic Research). 2013. Construction productivity: An evidence base for research and policy issues. Wellington, New Zealand: NZIER.
Ofori, G. 1990. The construction industry: Aspects of its economics and management. Singapore: Singapore Univ. Press.
Ozturk, M., S. Durdyev, O. N. Aras, and A. Banaitis. 2019. “Productivity as a determinant of labour wage in New Zealand’s construction sector.” Technol. Econ. Dev. Econ. 25 (5): 900–914. https://doi.org/10.3846/tede.2019.10297.
Pan, W. 2018. “Rethinking construction productivity theory and practice.” Built. Environ. Project Asset Manage. 8 (3): 234–238. https://doi.org/10.1108/BEPAM-07-2018-125.
Pan, W., L. Chen, and W. Zhan. 2019. “PESTEL analysis of construction productivity enhancement strategies: A case study of three economies.” J. Manage. Eng. 35 (1): 05018013. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000662.
Pan, W., L. Chen, and W. Zhan. 2020. “Implications of construction vocational education and training for regional competitiveness: Case study of Singapore and Hong Kong.” J. Manage. Eng. 36 (2): 05019010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000750.
Pan, W., A. G. F. Gibb, and A. R. J. Dainty. 2008. “Leading UK housebuilders’ utilization of offsite construction methods.” Build. Res. Inf. 36 (1): 56–67. https://doi.org/10.1080/09613210701204013.
Pan, W., and Y. Ning. 2014. “A socio-technical framework of zero-carbon building policies.” Build. Res. Inf. 43 (1): 94–110. https://doi.org/10.1080/09613218.2015.955759.
Pan, W., W. Zhan, X. Zhao, J. Wang, and J. Lam. 2016. “Cost paradigms of future building.” In Symp. Cost Management for Mega Projects. Hong Kong: The Institution of Engineering and Technology.
Salter, W. 1966. Productivity and technical change. New York: Cambridge University Press.
Solow, R. M. 1956. “A contribution to the theory of economic growth.” Q. J. Econ. 70 (1): 65–94. https://doi.org/10.2307/1884513.
Song, L., and S. M. Abourizk. 2008. “Measuring and modeling labor productivity using historical data.” J. Constr. Eng. Manage. 134 (10): 786–794. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(786).
Tam, V. W. Y., I. W. H. Fung, M. C. P. Sing, and S. O. Ogunlana. 2015. “Best practice of prefabrication implementation in the Hong Kong public and private sectors.” J. Clean. Prod. 109 (Dec): 216–231. https://doi.org/10.1016/j.jclepro.2014.09.045.
Tam, V. W. Y., L. Y. Shen, and J. S. Y. Kong. 2011. “Impacts of multi-layer chain subcontracting on project management performance.” Int. J. Project Manage. 29 (1): 108–116. https://doi.org/10.1016/j.ijproman.2010.01.005.
Thieblot, A. J. 2002. “Technology and labor relations in the construction industry.” J. Labor Res. 23 (4): 559–573. https://doi.org/10.1007/s12122-002-1028-0.
Uher, T. E., and P. Davenport. 2009. Fundamentals of building contract management. Australia: UNSW Press.
Vereen, S. C., W. Rasdorf, and J. E. Hummer. 2016. “Development and comparative analysis of construction industry labor productivity metrics.” J. Constr. Eng. Manage. 142 (7): 04016020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001112.
Vogl, B., and M. Abdel-Wahab. 2015. “Measuring the construction industry’s productivity performance: Critique of international productivity comparisons at industry level.” J. Constr. Eng. Manage. 141 (4): 04014085. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000944.
Yang, Y., M. Pan, and W. Pan. 2019. “‘Co-evolution through interaction’ of innovative building technologies: The case of modular integrated construction and robotics.” Autom. Constr. 107: 102932. https://doi.org/10.1016/j.autcon.2019.102932.
Yi, W., and A. P. C. Chan. 2014. “Critical review of labor productivity research in construction Journals.” J. Manage. Eng. 30 (2): 214–225. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000194.
Yin, R. K. 2014. Case study research design and methods. Thousand Oaks, CA: SAGE.
Zhan, W., W. Pan, A. A. Javed, and K. W. Chau. 2016. “Correlation analysis of key influencing factors to the total factor productivity of the Hong Kong construction industry.” In Proc., CRIOCM 2016 21st Int. Conf. on Advancement of Construction Management and Real Estate. Hong Kong: Univ. of Hong Kong.
Zhi, M., G. B. Hua, S. Q. Wang, and G. Ofori. 2003. “Total factor productivity growth accounting in the construction industry of Singapore.” Constr. Manage. Econ. 21 (7): 707–718. https://doi.org/10.1080/0144619032000056126.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 146Issue 8August 2020

History

Received: Jul 4, 2019
Accepted: Mar 13, 2020
Published online: May 30, 2020
Published in print: Aug 1, 2020
Discussion open until: Oct 30, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Wenting Zhan, Ph.D., S.M.ASCE [email protected]
Postdoctoral Fellow, Dept. of Civil Engineering, Univ. of Hong Kong, Pokfulam Rd., Hong Kong SAR, China. Email: [email protected]
Associate Professor, Dept. of Civil Engineering, Univ. of Hong Kong, Pokfulam Rd., Hong Kong SAR, China (corresponding author). ORCID: https://orcid.org/0000-0002-2720-3073. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share