Identification of Critical Causes of Tower-Crane Accidents through System Thinking and Case Analysis

Publication: Journal of Construction Engineering and Management
Volume 146, Issue 7

Abstract

Tower-crane accidents occur frequently and often have serious consequences. To identify the critical causes of tower-crane accidents, this study adopted a method that combined system thinking and case analysis. The entirety of tower-crane accident causes was considered as a system, and was divided into six subsystems and 34 causal factors. Information was collected on 141 investigation reports of tower-crane accidents in China from 2013 to 2018. The occurrence frequencies of accident causal factors and situation severities of subsystems were statistically analyzed. A combination of order relationship analysis and decision-making trial and evaluation laboratory methods was used to quantitatively evaluate the correlations among different causal factors, and the results of a comprehensive centrality and causality of 34 causal factors were obtained. Critical causes of tower-crane accidents were identified, including workers’ wrong actions, inadequate safety training, inadequate safety inspection, low safety awareness, and safety engineer’s mismanagement. To verify the practicability of the system model and identified critical causes, a case study of a typical serious tower-crane accident was conducted. Finally, corresponding recommendations are proposed for tower-crane safety management improvement and accident prevention.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request. Information about the journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.

Acknowledgments

The authors thank the Key Technologies Research and Development Program (2017YFC0805500) and National Natural Science Foundation of China (51308240) for their support of this research. Any opinions, findings, and conclusions expressed in this material are those of the authors and do not necessarily reflect the views of supporting organizations. The authors also acknowledge the construction workers and mentors who have carefully offered their insights on the safety experience.

References

Abdullah, L., and N. Zulkifli. 2015. “Integration of fuzzy AHP and interval type-2 fuzzy DEMATEL: An application to human resource management.” Expert Syst. Appl. 42 (9): 4397–4409. https://doi.org/10.1016/j.eswa.2015.01.021.
ANSI (American National Standards Institute). 2004. Construction tower cranes. Washington, DC: ANSI.
Beavers, J. E., J. R. Moore, R. Rinehart, and W. R. Schriver. 2006. “Crane-related fatalities in the construction industry.” J. Constr. Eng. Manage. 132 (9): 901–910. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:9(901).
Büyüközkan, G., and S. Güleryüz. 2016. “An integrated DEMATEL-ANP approach for renewable energy resources selection in Turkey.” Int. J. Prod. Econ. 182 (Dec): 435–448. https://doi.org/10.1016/j.ijpe.2016.09.015.
Chi, S., and S. Han. 2013. “Analyses of systems theory for construction accident prevention with specific reference to OSHA accident reports.” Int. J. Project Manage. 31 (7): 1027–1041. https://doi.org/10.1016/j.ijproman.2012.12.004.
Costa, F., A. Denis Granja, A. Fregola, F. Picchi, and A. Portioli Staudacher. 2019. “Understanding relative importance of barriers to improving the customer: Supplier relationship within construction supply chains using DEMATEL technique.” J. Manage. Eng. 35 (3): 04019002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000680.
Department of Emergency Management of Hainan Province. 2018. “Investigation report on the major accident of “5. 17” tower crane collapse in Wuzhishan, Hainan.” Accessed August 9, 2018. http://yjglt.hainan.gov.cn/xxgk/sgdcbg/201901/t20190114_2226877.html.
DIN (Deutsches Institut fu¨¯r Normung). 2007. Crane-safety-tower cranes. Berlin: DIN.
Ebright, P., K. McEwen, and K. Rapala. 2005. “First story/second story: A method to enhance organizational learning for patient safety and retention efforts. Abstract of presentation.” Clin. Nurse Specialist 19 (2): 72. https://doi.org/10.1097/00002800-200503000-00026.
Fang, Y., Y. K. Cho, and J. Chen. 2016. “A framework for real-time pro-active safety assistance for mobile crane lifting operations.” Autom. Constr. 72 (Dec): 367–379. https://doi.org/10.1016/j.autcon.2016.08.025.
Fang, Y., Y. K. Cho, F. Durso, and J. Seo. 2018. “Assessment of operator’s situation awareness for smart operation of mobile cranes.” Autom. Constr. 85 (Jan): 65–75. https://doi.org/10.1016/j.autcon.2017.10.007.
Fontela, E., and A. Gabus. 1976. The DEMATEL observer. Geneva: Battelle Geneva Research Center.
Forward Industry Research Institute. 2019. “Analysis of market status and development trend of tower crane industry in China in 2018.” Accessed April 25, 2019. https://bg.qianzhan.com/report/detail/459/190425-88aa7b79.html.
Fuenmayor, R. 1991. “The roots of reductionism: A counter-ontoepistemology for a systems approach.” Syst. Pract. 4 (5): 419–448. https://doi.org/10.1007/BF01104460.
Gardas, B. B., R. D. Raut, and B. Narkhede. 2018. “Evaluating critical causal factors for post-harvest losses (PHL) in the fruit and vegetables supply chain in India using the DEMATEL approach.” J. Clean. Prod. 199 (Oct): 47–61. https://doi.org/10.1016/j.jclepro.2018.07.153.
Goh, Y. M., and D. K. H. Chua. 2009. “Case-based reasoning for construction hazard identification: Case representation and retrieval.” J. Constr. Eng. Manage. 131 (11): 1181–1189. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000093.
Guangzhou Emergency Management Bureau. 2018. “Investigation report on the major accident of “7. 22” tower crane collapse in Guangzhou, Guangdong.” Accessed April 16, 2018. http://www.gzajj.gov.cn/publicfiles/business/htmlfiles/gzajj/scaqsgdcbcxx/201804/27474.html.
Guo, Y. 2002. Comprehensive evaluation theory and method. Beijing: Science Press.
Häkkinen, K. 1993. “Crane accidents and their prevention revisited.” Saf. Sci. 16 (3–4): 267–277. https://doi.org/10.1016/0925-7535(93)90049-J.
Heinrich, H. W., D. C. Petersen, N. R. Roos, and S. Hazlett. 1980. Industrial accident prevention: A safety management approach. New York: McGraw-Hill.
Heravi, G., and M. H. Charkhakan. 2014. “Predicting and tracing change-formation scenarios in construction projects using the DEMATEL technique.” J. Manage. Eng. 30 (6): 04014028. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000229.
Kang, S. C., H. L. Chi, and E. Miranda. 2009. “Three-dimensional simulation and visualization of crane assisted construction erection processes.” J. Comput. Civ. Eng. 23 (6): 363–371. https://doi.org/10.1061/(ASCE)0887-3801(2009)23:6(363).
Lee, K. C., W. H. Tsai, C. H. Yang, and Y. Z. Lin. 2018. “An MCDM approach for selecting green aviation fleet program management strategies under multi-resource limitations.” J. Air Transp. Manage. 68 (May): 76–85. https://doi.org/10.1016/j.jairtraman.2017.06.011.
Li, H., G. Chan, and M. Skitmore. 2012. “Multiuser virtual safety training system for tower crane dismantlement.” J. Comput. Civ. Eng. 26 (5): 638–647. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000170.
Marquez, A. A., P. Venturino, and J. L. Otegui. 2014. “Common root causes in recent failures of cranes.” Eng. Fail. Anal. 39 (Apr): 55–64. https://doi.org/10.1016/j.engfailanal.2014.01.012.
McDonald, N., and V. Hrymak. 2002. Safety behavior in the construction sector. Dublin, Ireland: Occupational Safety and Health Institute of Ireland.
MOHURD (Ministry of Housing and Urban-Rural Development of the People’s Republic of China). 2008. Provisions for the safety supervision and administration of construction cranes. Beijing: MOHURD.
MOHURD (Ministry of Housing and Urban-Rural Development of the People’s Republic of China). 2010. Technical specification for safety installation operation and dismantlement of tower crane in construction. Beijing: MOHURD.
MOHURD (Ministry of Housing and Urban-Rural Development of the People’s Republic of China). 2011. Standard for construction safety inspection. Beijing: MOHURD.
MOHURD (Ministry of Housing and Urban-Rural Development of the People’s Republic of China). 2016. “Report on production safety accidents of housing and municipal projects in 2015.” Accessed February 4, 2016. http://www.mohurd.gov.cn/wjfb/201602/t20160218_226671.html.
MOHURD (Ministry of Housing and Urban-Rural Development of the People’s Republic of China). 2018. “Report on production safety accidents of housing and municipal projects in 2017.” Accessed March 8, 2018. http://www.mohurd.gov.cn/wjfb/201803/t20180322_235474.html.
Namian, M., A. Albert, C. M. Zuluaga, and M. Behm. 2016. “Role of safety training: Impact on hazard recognition and safety risk perception.” J. Constr. Eng. Manage. 142 (12): 04016073. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001198.
Neitzel, R. L., N. S. Seixas, and K. K. Ren. 2001. “A review of crane safety in the construction industry.” Appl. Occup. Environ. Hyg. 16 (12): 1106–1117. https://doi.org/10.1080/10473220127411.
Park, M., S. Ha, H. S. Lee, Y. K. Choi, H. Kim, and S. Han. 2013. “Lifting demand-based zoning for minimizing worker vertical transportation time in high-rise building construction.” Autom. Constr. 32 (Jul): 88–95. https://doi.org/10.1016/j.autcon.2013.01.010.
Pomares, J. C., R. Irles, E. Segovia, and B. Ferrer. 2014. “Acceleration and deflection analysis for class C edge protection systems in construction work.” J. Constr. Eng. Manage. 140 (8): 04014031. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000870.
Pomares, J. C., R. Irles, E. G. Segovia, and D. Boixader. 2013. “Personal protection guardrails for dynamic forces.” Informes De La Construccion 65 (530): 241–251. https://doi.org/10.3989/ic.11.040.
Rajesh, R., and V. Ravi. 2017. “Analyzing drivers of risks in electronic supply chains: A grey–DEMATEL approach.” Int. J. Adv. Manuf. Technol. 92 (1–4): 1127–1145. https://doi.org/10.1007/s00170-017-0118-3.
Rasmussen, J. 1997. “Risk management in a dynamic society: A modelling problem.” Saf. Sci. 27 (2): 183–213. https://doi.org/10.1016/S0925-7535(97)00052-0.
Rasmussen, J., R. Svedung, and I. Svedung. 2000. Proactive risk management in a dynamic society. Karlstad, Sweden: Swedish Rescue Services Agency.
Sertyesilisik, B., A. Tunstall, and J. McLouglin. 2010. “An investigation of lifting operations on UK construction sites.” Saf. Sci. 48 (1): 72–79. https://doi.org/10.1016/j.ssci.2009.06.001.
Shapira, A., G. Lucko, and C. J. Schexnayder. 2007. “Cranes for building construction projects.” J. Constr. Eng. Manage. 133 (9): 690–700. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:9(690).
Shapira, A., and B. Lyachin. 2009. “Identification and analysis of factors affecting safety on construction sites with tower cranes.” J. Constr. Eng. Manage. 135 (1): 24–33. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:1(24).
Shapira, A., Y. Rosenfeld, and I. Mizrahi. 2008. “Vision system for tower cranes.” J. Constr. Eng. Manage. 134 (5): 320–332. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:5(320).
Shapiro, L. K., and J. P. Shapiro. 2010. Cranes and derricks. New York: McGraw-Hill.
Shepherd, G. W., R. J. Kahler, and J. Cross. 2000. “Crane fatalities—A taxonomic analysis.” Saf. Sci. 36 (2): 83–93. https://doi.org/10.1016/S0925-7535(00)00017-5.
Shin, I. J. 2015. “Factors that affect safety of tower crane installation/dismantling in construction industry.” Saf. Sci. 72 (Feb): 379–390. https://doi.org/10.1016/j.ssci.2014.10.010.
Skinner, H., T. Watson, B. Dunkley, and P. Blackmore. 2006. Tower crane stability. CIRIA C654. London: Construction Industry Research and Information Association.
Standardization Administration of China 2006. Safety code for tower cranes. Beijing: Standardization Administration of China.
Stave, K. 2002. “Using system dynamics to improve public participation in environmental decisions.” Syst. Dyn. Rev. 18 (2): 139–167. https://doi.org/10.1002/sdr.237.
Tam, V. W. Y., and I. W. H. Fung. 2011. “Tower crane safety in the construction industry: A Hong Kong study.” Saf. Sci. 49 (2): 208–215. https://doi.org/10.1016/j.ssci.2010.08.001.
Tixier, A. J. P., M. R. Hallowell, B. Rajagopalan, and D. Bowman. 2016. “Automated content analysis for construction safety: A natural language processing system to extract precursors and outcomes from unstructured injury reports.” Autom. Constr. 62 (Feb): 45–56. https://doi.org/10.1016/j.autcon.2015.11.001.
Zhang, W., X. Zhang, X. Luo, and T. Zhao. 2019. “Reliability model and critical factors identification of construction safety management based on system thinking.” J. Civ. Eng. Manage. 25 (4): 362–379. https://doi.org/10.3846/jcem.2019.8652.
Zhou, Q., W. Huang, and Y. Zhang. 2011. “Identifying critical success factors in emergency management using a fuzzy DEMATEL method.” Saf. Sci. 49 (2): 243–252. https://doi.org/10.1016/j.ssci.2010.08.005.
Zhou, W., T. Zhao, W. Liu, and J. Tang. 2018. “Tower crane safety on construction sites: A complex sociotechnical system perspective.” Saf. Sci. 109 (Nov): 95–108. https://doi.org/10.1016/j.ssci.2018.05.001.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 146Issue 7July 2020

History

Received: Jul 28, 2019
Accepted: Jan 10, 2020
Published online: Apr 25, 2020
Published in print: Jul 1, 2020
Discussion open until: Sep 25, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Master Student, School of Civil Engineering and Mechanics, Huazhong Univ. of Science and Technology, Wuhan 430074, China. Email: [email protected]
Associate Professor, School of Civil Engineering and Mechanics, Huazhong Univ. of Science and Technology, Wuhan 430074, China (corresponding author). ORCID: https://orcid.org/0000-0003-2319-2837. Email: [email protected]
Doctoral Student, School of Civil Engineering and Mechanics, Huazhong Univ. of Science and Technology, Wuhan 430074, China. Email: [email protected]
Tingsheng Zhao [email protected]
Professor, School of Civil Engineering and Mechanics, Huazhong Univ. of Science and Technology, Wuhan 430074, China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share