Technical Papers
Mar 18, 2020

Exploring the Potential of Technological Innovations for Temporary Structures: A Survey Study

Publication: Journal of Construction Engineering and Management
Volume 146, Issue 6

Abstract

Technology innovations, such as virtual design and construction (VDC) tools, light detection and ranging (lidar), global positioning system (GPS), and other vision-based or sensor-based systems, provide approaches that designers, builders, and other stakeholders can adopt to address, manage, and tackle design, planning, and site safety issues effectively during the design and construction phases. Nevertheless, the majority of technology applications have focused on permanent structures rather than temporary structures such as concrete formwork and scaffolding. Due to the temporary nature of temporary structures, stakeholders might easily underestimate their importance and pay less attention to their safety, quality, and performance. Therefore, the benefits received for temporary structures as a result of the development of advanced technologies have been limited. This paper aims to investigate, through a survey questionnaire, the current practices related to the level of attention given to temporary structures compared with that of permanent structures, and professionals’ viewpoints of using construction innovations on temporary structures. Based on empirical evidence from professionals who have experience with either designing or constructing temporary structures, the findings reveal that the industry currently pays less attention to temporary structures, and more attention is anticipated to improve safety performance related to temporary structures. In general, design and construction professionals hold positive attitudes toward applying construction innovations on temporary structures to improve the design quality and structural health when they are in use.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code generated or used during the study are available from the corresponding author by request (e.g., survey questionnaire and responses). Information about the Journal’s data-sharing policy can be found here: https://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001743.

References

Abowitz, D. A., and T. M. Toole. 2010. “Mixed method research: Fundamental issues of design, validity, and reliability in construction research.” J. Constr. Eng. Manage. 136 (1): 108–116. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000026.
ACI (American Concrete Institute). 2011. Building code requirements for structural concrete. ACI 318. Farmington Hills, MI: ACI.
ACI (American Concrete Institute). 2014. Formwork for concrete. Farmington Hills, MI: ACI.
André, J., R. Beale, and A. M. Baptista. 2012. “A survey of failures of bridge falsework systems since 1970.” Proc. Inst. Civ. Eng.-Forensic Eng. 165 (4): 161–172. https://doi.org/10.1680/feng.12.00012.
ASCE. 2015. Design loads on structures during construction. ASCE/SEI 37-14. Reston, VA: ASCE. https://doi.org/10.1061/9780784413098.
Atherinis, D., B. Bakowski, M. Velcek, and S. Moon. 2018. “Developing and laboratory testing a smart system for automated falsework inspection in construction.” J. Constr. Eng. Manage. 144 (3): 04017119. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001439.
Azhar, S. 2011. “Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry.” Leadersh. Manage. Eng. 11 (3): 241–252. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000127.
Barbosa, A., J. Gambatese, A. Das, and A. C. Pestana. 2014. “Mapped workflow for safety and reliability assessments of use and reuse of formwork.” In Proc., Construction Research Congress 2014: Construction in a Global Network, 1821–1830. Reston, VA: ASCE. https://doi.org/10.1061/9780784413517.186.
Beale, R., and J. O. André. 2017. Design solutions and innovations in temporary structures. Hershey, PA: Engineering Science Reference.
Bennett, L. 2004. Peer review of analysis of specialist group reports on causes of construction accidents. Sudbury, UK: HSE Books.
Blayse, A. M., and K. Manley. 2004. “Key influences on construction innovation.” Constr. Innovation 4 (3): 143–154. https://doi.org/10.1108/14714170410815060.
Bosché, F., M. Ahmed, Y. Turkan, C. T. Haas, and R. Haas. 2015. “The value of integrating scan-to-BIM and scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components.” Autom. Constr. 49 (Part B): 201–213. https://doi.org/10.1016/j.autcon.2014.05.014.
Buitrago, M., J. Sagaseta, and J. M. Adam. 2018. “Effects of sudden failure of shoring elements in concrete building structures under construction.” Eng. Struct. 172 (Oct): 508–522. https://doi.org/10.1016/j.engstruct.2018.06.052.
Cattledge, G. H., S. Hendricks, and R. Stanevich. 1996a. “Fatal occupational falls in the U.S. construction industry, 1980–1989.” Accid. Anal. Prev. 28 (5): 647–654. https://doi.org/10.1016/0001-4575(96)00025-5.
Cattledge, G. H., A. Schneiderman, R. Stanevich, S. Hendricks, and J. Greenwood. 1996b. “Nonfatal occupational fall injuries in the West Virginia construction industry.” Accid. Anal. Prev. 28 (5): 655–663. https://doi.org/10.1016/0001-4575(96)00026-7.
Cheng, T., J. Teizer, and G. Faschingbauer. 2009. “Advanced real-time monitoring models for temporary structures in construction.” In Proc., Computing in Civil Engineering (2009), 33–42. Reston, VA: ASCE.
Cho, C., K. Kim, J. Park, and Y. K. Cho. 2018. “Data-driven monitoring system for preventing the collapse of scaffolding structures.” J. Constr. Eng. Manage. 144 (8): 04018077. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001535.
Cronbach, L. J. 1951. “Coefficient alpha and the internal structure of tests.” Psychometrika 16 (3): 297–334. https://doi.org/10.1007/BF02310555.
Eldukair, Z. A., and B. M. Ayyub. 1991. “Analysis of recent US structural and construction failures.” J. Perform. Constr. Facil. 5 (1): 57–73. https://doi.org/10.1061/(ASCE)0887-3828(1991)5:1(57).
Ellenberg, A., L. Branco, A. Krick, I. Bartoli, and A. Kontsos. 2015. “Use of unmanned aerial vehicle for quantitative infrastructure evaluation.” J. Infrastruct. Syst. 21 (3): 04014054. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000246.
Eschenasy, D., and D. Spivack. 2014. “Engineering temporary structures and the 2014 building code.” Accessed October 8, 2018. https://www1.nyc.gov/assets/buildings/pdf/engineering_temporary_structures.pdf.
Feld, J., and K. L. Carper. 1997. Construction failure. New York: Wiley.
Feng, Y., and F. Dai. 2014. “Evaluation of stereo matching algorithms for temporary structure monitoring.” In Proc., Computing in Civil and Building Engineering (2014), 1206–1213. Reston, VA: ASCE.
Feng, Y., F. Dai, and H.-H. Zhu. 2015. “Evaluation of feature-and pixel-based methods for deflection measurements in temporary structure monitoring.” J. Civ. Struct. Health Monit. 5 (5): 615–628. https://doi.org/10.1007/s13349-015-0117-8.
Fernandez-Solis, J. L., V. Porwal, S. Lavy, A. Shafaat, Z. K. Rybkowski, K. Son, and N. Lagoo. 2013. “Survey of motivations, benefits, and implementation challenges of last planner system users.” J. Constr. Eng. Manage. 139 (4): 354–360. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000606.
fib (International Federation for Structural Concrete). 2009. Formwork and falsework: For heavy construction; guide to good practice. Lausanne, Switzerland: fib.
Goh, Y. M., and S. Chua. 2016. “Knowledge, attitude and practices for design for safety: A study on civil structural engineers.” Accid. Anal. Prev. 93 (Aug): 260–266. https://doi.org/10.1016/j.aap.2015.09.023.
Gündüz, M., Y. Nielsen, and M. Özdemir. 2013. “Quantification of delay factors using the relative importance index method for construction projects in Turkey.” J. Manage. Eng. 29 (2): 133–139. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000129.
Hadipriono, F. C., C.-L. Lim, and K.-H. Wong. 1986. “Event tree analysis to prevent failures in temporary structures.” J. Constr. Eng. Manage. 112 (4): 500–513. https://doi.org/10.1061/(ASCE)0733-9364(1986)112:4(500).
Hadipriono, F. C., and H.-K. Wang. 1986. “Analysis of causes of falsework failures in concrete structures.” J. Constr. Eng. Manage. 112 (1): 112–121. https://doi.org/10.1061/(ASCE)0733-9364(1986)112:1(112).
Haduong, A., J. J. Kim, and V. Balali. 2018. “Statistical results on incidents for formwork safety in concrete structures.” In Proc., Construction Research Congress 2018, 645–655. Reston, VA: ASCE. https://doi.org/10.1061/9780784481288.063.
Hope, C. J., and M. Chuaqui. 2007. “Precision surveying monitoring of shoring and structures.” In Proc., 7th FMGM 2007: Field Measurements in Geomechanics, 1–12. Reston, VA: ASCE. https://doi.org/10.1061/40940(307)105.
Hwang, S., and L. Y. Liu. 2010. “BIM for integration of automated real-time project control systems.” In Proc., Construction Research Congress 2010: Innovation for Reshaping Construction Practice, 509–517. Reston, VA: ASCE. https://doi.org/10.1061/41109(373)51.
Ibadov, N., and J. Rosłon. 2015. “Technology selection for construction project, with the use of fuzzy preference relation.” Archives Civ. Eng. 61 (3): 105–118. https://doi.org/10.1515/ace-2015-0028.
Ikemoto, Y., S. Suzuki, H. Okamoto, H. Murakami, H. Asama, S. Morishita, T. Mishima, X. Lin, and H. Itoh. 2009. “Force sensor system for structural health monitoring using passive RFID tags.” Sensor Rev. 29 (2): 127–136. https://doi.org/10.1108/02602280910936237.
Im, S. B., S. Hurlebaus, and Y. J. Kang. 2013. “Summary review of GPS technology for structural health monitoring.” J. Struct. Eng. 139 (10): 1653–1664. https://doi.org/10.1061/(ASCE)ST.1943-541X.0000475.
Ismail, H. B., and K. D. Ab Ghani. 2012. “Potential hazards at the construction workplace due to temporary structures.” Procedia-Soc. Behav. Sci. 49: 168–174. https://doi.org/10.1016/j.sbspro.2012.07.015.
Jiang, S., W.-S. Jang, and M. J. Skibniewski. 2012. “Selection of wireless technology for tracking construction materials using a fuzzy decision model.” J. Civ. Eng. Manage. 18 (1): 43–59. https://doi.org/10.3846/13923730.2011.652157.
Jin, Z., and J. Gambatese. 2019. “BIM for temporary structures: Development of a Revit API plug-in for concrete formwork.” In Proc., Canadian Society for Civil Engineering (CSCE) Annual Conf. Montreal: Canadian Society for Civil Engineering.
Jin, Z., J. Gambatese, D. Liu, and V. Dharmapalan. 2019. “Using 4D BIM to assess construction risks during the design phase.” Eng. Constr. Archit. Manage. 26 (11): 2637–2654. https://doi.org/10.1108/ECAM-09-2018-0379.
Jongeling, R., J. Kim, M. Fischer, C. Mourgues, and T. Olofsson. 2008. “Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models.” Autom. Constr. 17 (6): 780–791. https://doi.org/10.1016/j.autcon.2008.02.006.
Jung, Y., H. Oh, and M. M. Jeong. 2019. “An approach to automated detection of structural failure using chronological image analysis in temporary structures.” Int. J. Constr. Manage. 19 (2): 178–185. https://doi.org/10.1080/15623599.2017.1411457.
Kannan, M. R., and M. H. Santhi. 2013. “Constructability assessment of climbing formwork systems using building information modeling.” Procedia Eng. 64: 1129–1138. https://doi.org/10.1016/j.proeng.2013.09.191.
Karakhan, A. A., and J. A. Gambatese. 2017. “Integrating worker health and safety into sustainable design and construction: Designer and constructor perspectives.” J. Constr. Eng. Manage. 143 (9): 04017069. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001379.
Kim, J., and M. Fischer. 2007. “Formalization of the features of activities and classification of temporary structures to support an automated temporary structure planning.” In Proc., Computing in Civil Engineering (2007), 338–346. Reston, VA: ASCE.
Kim, K., Y. Cho, and S. Zhang. 2016. “Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM.” Autom. Constr. 70 (Oct): 128–142. https://doi.org/10.1016/j.autcon.2016.06.012.
Kim, K., Y. K. Cho, and K. Kim. 2018. “BIM-based decision-making framework for scaffolding planning.” J. Manage. Eng. 34 (6): 04018046. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000656.
Kim, K., and J. Teizer. 2014. “Automatic design and planning of scaffolding systems using building information modeling.” Adv. Eng. Inf. 28 (1): 66–80. https://doi.org/10.1016/j.aei.2013.12.002.
Kopsida, M., I. Brilakis, and P. A. Vela. 2015. “A review of automated construction progress monitoring and inspection methods.” In Proc., 32nd CIB W78 Conf., 421–431. Delft, Netherlands: International Council for Research and Innovation in Building and Construction.
Lee, J. J., and M. Shinozuka. 2006. “A vision-based system for remote sensing of bridge displacement.” Ndt E Int. 39 (5): 425–431. https://doi.org/10.1016/j.ndteint.2005.12.003.
Lew, H. S. 1984. “Construction failures and their lessons.” Batiment Int. Build. Res. Pract. 12 (5): 272–275. https://doi.org/10.1080/09613218408545283.
Li, H.-N., D.-S. Li, and G.-B. Song. 2004. “Recent applications of fiber optic sensors to health monitoring in civil engineering.” Eng. Struct. 26 (11): 1647–1657. https://doi.org/10.1016/j.engstruct.2004.05.018.
Lucko, G., and E. M. Rojas. 2010. “Research validation: Challenges and opportunities in the construction domain.” J. Constr. Eng. Manage. 136 (1): 127–135. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000025.
Luth, G. P. 2011. “VDC and the engineering continuum.” J. Constr. Eng. Manage. 137 (10): 906–915. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000359.
Lynch, J. P. 2006. “An overview of wireless structural health monitoring for civil structures.” Philos. Trans. Royal Society A: Math. Phys. Eng. Sci. 365 (1851): 345–372. https://doi.org/10.1098/rsta.2006.1932.
Lynch, J. P., and K. J. Loh. 2006. “A summary review of wireless sensors and sensor networks for structural health monitoring.” Shock Vib. Dig. 38 (2): 91–128. https://doi.org/10.1177/0583102406061499.
Meadati, P., J. Irizarry, and A. Aknoukh. 2011. “BIM and concrete formwork repository.” In Proc., 47th ASC Annual Int. Conf., Associated Schools of Construction. Windsor, CO: The Associated Schools of Construction.
Mendenhall, W., L. Ott, and R. L. Scheaffer. 2006. Elementary survey sampling. Southbank, VIC, Australia/Belmont, CA: Thomson Brooks/Cole.
Mitropoulos, P., and C. Tatum. 1999. “Technology adoption decisions in construction organizations.” J. Constr. Eng. Manage. 125 (5): 330–338. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:5(330).
Moon, S. 2017. “Application of mobile devices in remotely monitoring temporary structures during concrete placement.” Procedia Eng. 196: 128–134. https://doi.org/10.1016/j.proeng.2017.07.182.
Moon, S., B. Choi, and B. Yang. 2012. “USN-based data acquisition for increasing safety in the concrete formwork operation.” J. Comput. Civ. Eng. 26 (3): 271–281. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000132.
Moon, S., E. Choi, and B. Yang. 2015. “Holistic integration based on USN technology for monitoring safety during concrete placement.” Autom. Constr. 57 (Sep): 112–119. https://doi.org/10.1016/j.autcon.2015.05.001.
Moon, S., B. Yang, and E. Choi. 2018. “Safety guideline for safe concrete placement utilizing the information on the structural behavior of formwork.” J. Constr. Eng. Manage. 144 (12): 04018108. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001489.
Navon, R., and Y. Shpatnitsky. 2005. “Field experiments in automated monitoring of road construction.” J. Constr. Eng. Manage. 131 (4): 487–493. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:4(487).
Ni, Y., Y. Xia, W. Liao, and J. Ko. 2009. “Technology innovation in developing the structural health monitoring system for Guangzhou New TV Tower.” Struct. Control Health Monit. 16 (1): 73–98. https://doi.org/10.1002/stc.303.
Nnaji, C., H. W. Lee, A. Karakhan, and J. Gambatese. 2018. “Developing a decision-making framework to select safety technologies for highway construction.” J. Constr. Eng. Manage. 144 (4): 04018016. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001466.
Nunnally, J. C. 1994. Psychometric theory 3E. New York: McGraw-Hill.
Odusami, K. 2002. “Perceptions of construction professionals concerning important skills of effective project leaders.” J. Manage. Eng. 18 (2): 61–67. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:2(61).
Okere, G., and C. Souder. 2018. “Board 49: Making the case for temporary structures as a required course and recommending an instructional design.” In Proc., 2018 ASEE Annual Conf. and Exposition. Washington, DC: American Society for Engineering Education. https://peer.asee.org/30044.
Olsen, M. J., F. Kuester, B. J. Chang, and T. C. Hutchinson. 2009. “Terrestrial laser scanning-based structural damage assessment.” J. Comput. Civ. Eng. 24 (3): 264–272. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000028.
OSHA (Occupational Safety and Health Administration). 2002. A guide to scaffold use in the construction industry. Washington, DC: OSHA.
OSHA (Occupational Safety and Health Administration). 2017a. “Regulations (Standards-29 CFR 1926).” Accessed October 10, 2018. https://www.osha.gov/laws-regs/regulations/standardnumber/1926.
OSHA (Occupational Safety and Health Administration). 2017b. “Scafoolding eTool.” Accessed October 10, 2018. https://www.osha.gov/SLTC/etools/scaffolding/index.html.
Park, H., H. Lee, H. Adeli, and I. Lee. 2007. “A new approach for health monitoring of structures: Terrestrial laser scanning.” Comput.-Aided Civ. Infrastruct. Eng. 22 (1): 19–30. https://doi.org/10.1111/j.1467-8667.2006.00466.x.
Park, J.-W., J.-J. Lee, H.-J. Jung, and H. Myung. 2010. “Vision-based displacement measurement method for high-rise building structures using partitioning approach.” NDT E Int. 43 (7): 642–647. https://doi.org/10.1016/j.ndteint.2010.06.009.
Pisheh, Y. P., H. Shafiei, and M. Hatambeigi. 2010. “A case study of failure due to inappropriate usage of forming scaffold system.” In Proc., Forensic Engineering 2009: Pathology of the Built Environment, 536–545. Reston, VA: ASCE.
Pomares, J. C., R. Irles, E. Segovia, and B. Ferrer. 2014. “Acceleration and deflection analysis for Class C edge protection systems in construction work.” J. Constr. Eng. Manage. 140 (8): 04014031. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000870.
Puri, N., E. Valero, Y. Turkan, and F. Bosché. 2018. “Assessment of compliance of dimensional tolerances in concrete slabs using TLS data and the 2D continuous wavelet transform.” Autom. Constr. 94 (Oct): 62–72. https://doi.org/10.1016/j.autcon.2018.06.004.
Ratay, R. T. 2012. Temporary structures in construction. New York: McGraw-Hill.
Reagan, D., A. Sabato, and C. Niezrecki. 2017. “Unmanned aerial vehicle acquisition of three-dimensional digital image correlation measurements for structural health monitoring of bridges.” In Proc., Nondestructive Characterization and Monitoring of Advanced Materials, Aerospace, and Civil Infrastructure 2017, 1016909. Bellingham WA: International Society for Optics and Photonics.
Rens, K. L., H. J. Royston, and M. L. LaCome. 2000. “Temporary bracing failures during construction (fact or fiction): Case studies.” In Proc., Forensic Engineering (2000), 652–661. Reston, VA: ASCE.
Rogers, E. M. 2003. Diffusion of innovations. New York: Free Press.
Salganik, M. J., and D. D. Heckathorn. 2004. “Sampling and estimation in hidden populations using respondent-driven sampling.” Sociological Methodology 34 (1): 193–240. https://doi.org/10.1111/j.0081-1750.2004.00152.x.
Seo, D.-C. 2005. “An explicative model of unsafe work behavior.” Saf. Sci. 43 (3): 187–211. https://doi.org/10.1016/j.ssci.2005.05.001.
Sheehan, M. J., and W. G. Corley. 2013. “Collapse investigation of a concrete garage with precast formwork.” In Proc., Forensic Engineering 2012: Gateway to a Safer Tomorrow, 1186–1197. Reston, VA: ASCE.
Singh, M. M., A. Sawhney, and V. Sharma. 2017. “Utilising building component data from BIM for formwork planning.” Constr. Econ. Build. 17 (4): 20. https://doi.org/10.5130/AJCEB.v17i4.5546.
Sony, S., S. Laventure, and A. Sadhu. 2019. “A literature review of next-generation smart sensing technology in structural health monitoring.” Struct. Control Health Monit. 26 (3): e2321. https://doi.org/10.1002/stc.2321.
Toh, Y. Z., Y. M. Goh, and B. H. W. Guo. 2017. “Knowledge, attitude, and practice of design for safety: Multiple stakeholders in the Singapore construction industry.” J. Constr. Eng. Manage. 143 (5). 04016131. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001279.
Turkan, Y., F. Bosche, C. T. Haas, and R. Haas. 2012. “Automated progress tracking using 4D schedule and 3D sensing technologies.” Autom. Constr. 22 (Mar): 414–421. https://doi.org/10.1016/j.autcon.2011.10.003.
Wardhana, K., and F. C. Hadipriono. 2003. “Study of recent building failures in the United States.” J. Perform. Constr. Facil. 17 (3): 151–158. https://doi.org/10.1061/(ASCE)0887-3828(2003)17:3(151).
Waris, M., M. S. Liew, M. F. Khamidi, and A. Idrus. 2014. “Criteria for the selection of sustainable onsite construction equipment.” Int. J. Sustainable Built Environ. 3 (1): 96–110. https://doi.org/10.1016/j.ijsbe.2014.06.002.
Xie, N., and G. Wang. 2009. “Test analysis on hidden defect in high falsework and its effect on structural reliability.” In Proc., 8th Int. Conf. on Reliability, Maintainability and Safety, 1077–1080. New York: IEEE.
Yabuki, N., and T. Oyama. 2007. “Application of radio frequency identification technology for management of light weight temporary facility members.” In Proc., Computing in Civil Engineering (2007), 697–704. Reston, VA: ASCE.
Yang, H., X. Xu, and I. Neumann. 2016. “Laser scanning-based updating of a finite-element model for structural health monitoring.” IEEE Sens. J. 16 (7): 2100–2104. https://doi.org/10.1109/JSEN.2015.2508965.
Yates, J. K., and E. E. Lockley. 2002. “Documenting and analyzing construction failures.” J. Constr. Eng. Manage. 128 (1): 8–17. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:1(8).
Ye, X., Y. Su, and J. Han. 2014. “Structural health monitoring of civil infrastructure using optical fiber sensing technology: A comprehensive review.” Sci. World J. 2014. 11. https://doi.org/10.1155/2014/652329.
Yi, T. H., H. N. Li, and M. Gu. 2013. “Recent research and applications of GPS-based monitoring technology for high-rise structures.” Struct. Control Health Monit. 20 (5): 649–670. https://doi.org/10.1002/stc.1501.
Yuan, X., C. J. Anumba, and M. K. Parfitt. 2014. “Real-time Cyber-Physical Systems (CPS)-based monitoring of temporary structures: A scaffolding system example.” In Proc., 32nd CIB W78 Conf., 780–789. Delft, Netherlands: International Council for Research and Innovation in Building and Construction.
Yuan, X., C. J. Anumba, and M. K. Parfitt. 2015. “Review of the potential for a cyber-physical system approach to temporary structures monitoring.” Int. J. Arch. Res. 9: 26–44.
Yuan, X., C. J. Anumba, and M. K. Parfitt. 2016. “Cyber-physical systems for temporary structure monitoring.” Autom. Constr. 66 (Jun): 1–14. https://doi.org/10.1016/j.autcon.2016.02.005.
Zaltman, G., R. Duncan, and J. Holbek. 1973. Innovations and organizations. New York: Wiley.
Zhang, S., J.-K. Lee, M. Venugopal, J. Teizer, and C. Eastman. 2011. “Integrating BIM and safety: An automated rule-based checking system for safety planning and simulation.” In Vol. 99 of Proc., CIB W099, 24–26. Delft, Netherlands: International Council for Research and Innovation in Building and Construction.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 146Issue 6June 2020

History

Received: Jun 16, 2019
Accepted: Nov 6, 2019
Published online: Mar 18, 2020
Published in print: Jun 1, 2020
Discussion open until: Aug 18, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Graduate Student, School of Civil and Construction Engineering, Oregon State Univ., 101 Kearney Hall, Corvallis, OR 97331-3212 (corresponding author). ORCID: https://orcid.org/0000-0002-7680-617X. Email: [email protected]
Professor, School of Civil and Construction Engineering, Oregon State Univ., 101 Kearney Hall, Corvallis, OR 97331-3212. ORCID: https://orcid.org/0000-0003-3540-6441. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share