Abstract
Building construction sites are highly complex and uncertain, and frequent incidents of dangerous events can easily lead to casualties. Thus, both risk assessment and evacuation analysis are fundamental to safety management. This paper proposed a methodology for risk-based evacuation analysis and illustrated its application with a case study. First, a joint probability model was proposed for the risk assessment of hazardous areas on construction sites, in which hazards are classified and identified by risk factor analysis. Second, a modified two-dimensional cellular automaton (CA) model was established to simulate the evacuation process by coupling the risk probability of hazardous areas into the evolution rule. A case study was presented to show that the risk-based evacuation model can describe the real-life situation as pedestrian movement is disturbed due to the occurrence of random events, especially in hazardous areas with high joint probabilities of risk. This study contributes to the body of knowledge by (1) assessing the risk of hazardous areas on construction sites with a probabilistic method; and (2) simulating the emergency evacuation process with a computational method considering the influence of hazardous areas. Therefore, a systematic approach to risk-based evacuation analysis in which the coupling between risk assessment and evacuation simulation is achieved.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Data generated by the authors or analyzed during the study are available at: https://drive.google.com/file/d/13dpWegYhA9vNa89DL3jh9G9T5mAtetr_/view?usp=sharing. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.
Acknowledgments
Support from the National Key Research and Development Program of China (No. 2017YFC0805500) is gratefully acknowledged.
References
Abdelgawad, M., and A. R. Fayek. 2010. “Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP.” J. Constr. Eng. Manage. 136 (9): 1028–1036. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000210.
Aljassmi, H., and S. Han. 2013. “Analysis of causes of construction defects using fault trees and risk importance measures.” J. Constr. Eng. Manage. 139 (7): 870–880. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000653.
Apivatanagul, P., R. A. Davidson, and L. K. Nozick. 2012. “Bi-level optimization for risk-based regional hurricane evacuation planning.” Nat. Hazard. 60 (2): 567–588. https://doi.org/10.1007/s11069-011-0029-9.
Bernardini, G., M. D’Orazio, and E. Quagliarini. 2016. “Towards a ‘behavioural design’ approach for seismic risk reduction strategies of buildings and their environment.” Saf. Sci. 86 (Jul): 273–294. https://doi.org/10.1016/j.ssci.2016.03.010.
Blue, V., and J. Adler. 1998. “Emergent fundamental pedestrian flows from cellular automata microsimulation.” Transp. Res. Rec. 1644 (1): 29–36. https://doi.org/10.3141/1644-04.
Bonabeau, E. 2002. “Agent-based modeling: Methods and techniques for simulating human systems.” Supplement, Proc. Natl. Acad. Sci. USA 99 (S3): 7280–7287. https://doi.org/10.1073/pnas.082080899.
Burstedde, C., K. Klauck, A. Schadschneider, and J. Zittartz. 2001. “Simulation of pedestrian dynamics using a two-dimensional cellular automaton.” Phys. A: Stat. Mech. Appl. 295 (3–4): 507–525. https://doi.org/10.1016/S0378-4371(01)00141-8.
Carr, V., and J. Tah. 2001. “A fuzzy approach to construction project risk assessment and analysis: Construction project risk management system.” Adv. Eng. Softw. 32 (10–11): 847–857. https://doi.org/10.1016/S0965-9978(01)00036-9.
Chinese Standards. 2017. Specification for identification, monitoring and control technology of major hazard installations in construction engineering in Fujian. [In Chinese.] DBJ/T13-91-2017. Fuzhou, China: Housing and Urban-Rural Development of Fujian.
El Meouche, R., M. Abunemeh, I. Hijaze, A. Mebarki, and I. Shahrour. 2018. “Developing optimal paths for evacuating risky construction sites.” J. Constr. Eng. Manage. 144 (2): 04017099. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001413.
El-Sayegh, S. M. 2008. “Risk assessment and allocation in the UAE construction industry.” Int. J. Project Manage. 26 (4): 431–438. https://doi.org/10.1016/j.ijproman.2007.07.004.
Fang, D. P., R. X. Lan, S. H. Wu, and B. Hua. 2002. “Safety evaluation of the working conditions on the construction sites.” [In Chinese.] J. Saf. Environ. 2 (2): 43–46. https://doi.org/10.3969/j.issn.1009-6094.2002.02.012.
Graham, K., and G. Kinney. 1980. “A practical safety analysis system for hazards control.” J. Saf. Res. 12 (1): 13–20.
Hallowell, M. R., and J. A. Gambatese. 2010. “Qualitative research: Application of the Delphi method to CEM research.” J. Constr. Eng. Manage. 136 (1): 99–107. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000137.
He, J., and J. Gong. 2016. “Estimate of small first passage probabilities of nonlinear random vibration systems by using tail approximation of extreme distributions.” Struct. Saf. 60 (May): 28–36. https://doi.org/10.1016/j.strusafe.2016.02.003.
Helbing, D., and P. Molnar. 1995. “Social force model for pedestrian dynamics.” Phys. Rev. E 51 (5): 4282. https://doi.org/10.1103/PhysRevE.51.4282.
Huang, X., and J. Hinze. 2003. “Analysis of construction worker fall accidents.” J. Constr. Eng. Manage. 129 (3): 262–271. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:3(262).
Islam, M. S., M. P. Nepal, M. Skitmore, and M. Attarzadeh. 2017. “Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects.” Adv. Eng. Inform. 33 (Aug): 112–131. https://doi.org/10.1016/j.aei.2017.06.001.
Kangari, R., and L. S. Riggs. 1989. “Construction risk assessment by linguistics.” IEEE Trans. Eng. Manage. 36 (2): 126–131. https://doi.org/10.1109/17.18829.
Kim, K., and Y. Lee. 2019. “Automated generation of daily evacuation paths in 4D BIM.” Appl. Sci. 9 (9): 1789. https://doi.org/10.3390/app9091789.
Kolen, B., and P. van Gelder. 2018. “Risk-based decision-making for evacuation in case of imminent threat of flooding.” Water 10 (10): 1429. https://doi.org/10.3390/w10101429.
Li, J., and H. Zhu. 2018. “A risk-based model of evacuation route optimization under fire.” Procedia Eng. 211: 365–371. https://doi.org/10.1016/j.proeng.2017.12.024.
Liu, P., and A. Der Kiureghian. 1986. “Multivariate distribution models with prescribed marginals and covariances.” Probab. Eng. Mech. 1 (2): 105–112. https://doi.org/10.1016/0266-8920(86)90033-0.
Lu, L., C. Chan, J. Wang, and W. Wang. 2017. “A study of pedestrian group behaviors in crowd evacuation based on an extended floor field cellular automaton model.” Transp. Res. Part C Emerg. Technol. 81 (Aug): 317–329. https://doi.org/10.1016/j.trc.2016.08.018.
Lyons, T., and M. Skitmore. 2004. “Project risk management in the Queensland engineering construction industry: A survey.” Int. J. Project Manage. 22 (1): 51–61. https://doi.org/10.1016/S0263-7863(03)00005-X.
Marconi, S., and B. Chopard. 2002. “A multiparticle lattice gas automata model for a crowd.” In Proc., Int. Conf. on Cellular Automata, 231–238. New York: Springer.
Marzouk, M., and I. Al Daour. 2018. “Planning labor evacuation for construction sites using BIM and agent-based simulation.” Saf. Sci. 109 (Nov): 174–185. https://doi.org/10.1016/j.ssci.2018.04.023.
MOHURD (Ministry of Housing and Urban-Rural Development). 2018. “Bulletin on the production accident of municipal housing engineering and special governance action situation in 2018.” [In Chinese.] Accessed March 22, 2019. http://www.mohurd.gov.cn/wjfb/201903/t20190326_239913.html.
Mustafa, M. A., and J. F. Al-Bahar. 1991. “Project risk assessment using the analytic hierarchy process.” IEEE Trans. Eng. Manage. 38 (1): 46–52. https://doi.org/10.1109/17.65759.
Nishinari, K., and D. Takahashi. 1999. “A new deterministic CA model for traffic flow with multiple states.” J. Phys. A: Math. Gen. 32 (1): 93. https://doi.org/10.1088/0305-4470/32/1/010.
Nowak, A. S., and K. R. Collins. 2000. Reliability of structures. Chongqing, China: Chongqing Univ. Press.
Perlman, A., R. Sacks, and R. Barak. 2014. “Hazard recognition and risk perception in construction.” Saf. Sci. 64 (Apr): 22–31. https://doi.org/10.1016/j.ssci.2013.11.019.
Said, H., A. Kandil, and H. Cai. 2012. “Agent-based simulation of labour emergency evacuation in high-rise building construction sites.” In Proc., Construction Research Congress 2012: Construction Challenges in a Flat World, 1104–1113. Reston, VA: ASCE.
Siraj, N. B., and A. R. Fayek. 2019. “Risk identification and common risks in construction: Literature review and content analysis.” J. Constr. Eng. Manage. 145 (9): 03119004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001685.
Taroun, A. 2012. “Decision support system (DSS) for construction project risk analysis and evaluation via evidential reasoning (ER).” Ph.D. thesis, Faculty of Humanities, Univ. of Manchester.
Taroun, A. 2014. “Towards a better modelling and assessment of construction risk: Insights from a literature review.” Int. J. Project Manage. 32 (1): 101–115. https://doi.org/10.1016/j.ijproman.2013.03.004.
Vanem, E., and R. Skjong. 2006. “Designing for safety in passenger ships utilizing advanced evacuation analyses—A risk based approach.” Saf. Sci. 44 (2): 111–135. https://doi.org/10.1016/j.ssci.2005.06.007.
Von Neumann, J. 1966. Theory of self-reproducing automata. Champaign, IL: University of Illinois Press. https://dl.acm.org/doi/10.5555/1102024.
Information & Authors
Information
Published In
Copyright
©2020 American Society of Civil Engineers.
History
Received: May 20, 2019
Accepted: Sep 20, 2019
Published online: Mar 16, 2020
Published in print: May 1, 2020
Discussion open until: Aug 16, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.